Atch_2_Price_Breakdown_VCC_LRS.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Vehicle Corrosion Control Services Federal contract opportunity
Solicitation number
FA461020Q0003
Issued by
Department of the Air Force Space Command

About this file

Attachment 2 Price Breakdown LRS

View the file

Other files for this federal contract opportunity

Other files attached to Vehicle Corrosion Control Services, newest first.
File Type Posted
Atch_1_PWS_Vehicle_Corrosion_Control_dtd_28_Aug_19.pdf PDF
Atch_5_Wage_Determination_2015_5647_Rev_8_20190802.pdf PDF
Atch_4_Technical_Response_Questionaire_20191010.docx DOCX document
Atch_3_Price_Breakdown_VCC_SCS.xlsx XLSX spreadsheet
FA461020Q0003_Corrosion_Control_20191029.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001- Base Year LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 0001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
0001AAutomotive Glass WorkerxLabor Hour25=$ - 0
0001BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
0001CMotor Vehicle MechanicxLabor Hour25=$ - 0
0001DPainter, AutomotivexLabor Hour600=$ - 0
0001ETruck Driver, HeavyxLabor Hour45=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

0001F Government Estimated Cost for Materials $ 10,000.00 (Block E)

Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR).

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (LRS) CLIN 0001 CLIN 0001, Base Year

1 Dec 2019 - 31 May 2020 (Base Period) CLIN 0001 Vehicle Corrosion Control

CLIN 1001 - OY1

LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 1001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
1001AAutomotive Glass WorkerxLabor Hour35=$ - 0
1001BMotor Equipment Metal WorkerxLabor Hour35=$ - 0
1001CMotor Vehicle MechanicxLabor Hour60=$ - 0
1001DPainter, AutomotivexLabor Hour1000=$ - 0
1001ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

1001F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 1001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (LRS) CLIN 1001 CLIN 1001, Option Year 1

1 Jun 2020 - 31 May 2021 (Option Year 1) CLIN 1001 Vehicle Corrosion Control

CLIN 2001 - OY2

LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 2001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
2001AAutomotive Glass WorkerxLabor Hour35=$ - 0
2001BMotor Equipment Metal WorkerxLabor Hour35=$ - 0
2001CMotor Vehicle MechanicxLabor Hour60=$ - 0
2001DPainter, AutomotivexLabor Hour1000=$ - 0
2001ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

2001F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 2001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (LRS) CLIN 2001, Option Year 2

1 Jun 2021 - 31 May 2022 (Option Year 2) CLIN 2001 Vehicle Corrosion Control

CLIN 3001- OY3

LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 3001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
3001AAutomotive Glass WorkerxLabor Hour35=$ - 0
3001BMotor Equipment Metal WorkerxLabor Hour35=$ - 0
3001CMotor Vehicle MechanicxLabor Hour60=$ - 0
3001DPainter, AutomotivexLabor Hour1000=$ - 0
3001ETruck Driver, HeavyxLabor Hour45=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

3001F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 3001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (30 LRS) CLIN 3001, Option Year 3

1 Jun 2022 - 31 May 2023 (Option Year 3) CLIN 3001 Vehicle Corrosion Control

CLIN 4001- OY4

LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 4001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
4001AAutomotive Glass WorkerxLabor Hour35=$ - 0
4001BMotor Equipment Metal WorkerxLabor Hour35=$ - 0
4001CMotor Vehicle MechanicxLabor Hour60=$ - 0
4001DPainter, AutomotivexLabor Hour1000=$ - 0
4001ETruck Driver, HeavyxLabor Hour45=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

4001F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 4001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (LRS) CLIN 4001, Option Year 4

1 Jun 2023 - 31 May 2024 (Option Year 4) CLIN 4001 Vehicle Corrosion Control

CLIN 5001- 6 Month LRS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 5001 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
5001AAutomotive Glass WorkerxLabor Hour25=$ - 0
5001BMotor Equipment Metal WorkerxLabor Hour25=$ - 0
5001CMotor Vehicle MechanicxLabor Hour25=$ - 0
5001DPainter, AutomotivexLabor Hour600=$ - 0
5001ETruck Driver, HeavyxLabor Hour45=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

5001F Government Estimated Cost for Materials $ 10,000.00 (Block E)

Total Proposed Price for CLIN 5001 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Logistics Readiness Squadron (30 LRS) CLIN 5001, 6 Month

1 Jun 2024 - 30 Nov 2024 (6 Month) CLIN 5001 Vehicle Corrosion Control

File details come from the government source that posted it.