Attachment_5-_Environmental_Specs.docx

DOCX document 108 KB Posted

Attached to
FA4610-14-R-0026 Federal contract opportunity
Solicitation number
FA4610-14-R-0026
Issued by
Department of the Air Force Space Command

About this file

Attachment V- Environmental Specifications

View the file

Other files for this federal contract opportunity

Other files attached to FA4610-14-R-0026, newest first.
File Type Posted
8510_As-builts.zip ZIP file
Q_ _A.pdf PDF
08510_Asbestos_Reports.zip ZIP file
FA4610-14-R-0026-0001_Con_Mod.pdf PDF
FA4610-14-R-0026-0001_Mod.pdf PDF
Bldg_8510_Photos.zip ZIP file
Attachment_4-_WD.doc DOC document
FA4610-14-R-0026.pdf PDF
Attachment_1-_SOW_(21_July).doc DOC document
Attachment_VIII-_Specifications.pdf PDF
Attachment_2-_Design.pdf PDF
Attachment_6-_General_Requirements.doc DOC document
Attachment_7-_VAFB_Facilities_Excellence_Oct13.pdf PDF
Attachment_3-_RMDF.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4610-14-R-0026

ATTACHMENT V

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 20

ENVIRONMENTAL PROTECTION

(last updated 19 December 2013)

TABLE OF CONTENTS

1.1 REFERENCES

1.1.1 U.S. Air Force (USAF)

1.1.2 California Code of Regulations (CCR) & State of California

1.1.3 U.S. Government

1.1.4 U.S. Army Corps of Engineers (USACE)

1.1.5 U.S. National Archives and Records Administration (NARA)

1.2 DEFINITIONS

1.2.1Environmental Pollution and Damage
1.2.2Environmental Protection
1.2.3Contractor Generated Hazardous Waste
1.2.4Pesticide
1.2.5Pests
1.2.6Land Application for Discharge Water
1.2.7Surface Discharge
1.2.8Waters of the United States
1.2.9Wetlands
1.2.10Sediment
1.2.11Solid Waste
1.2.12Garbage
1.2.13Chemical Waste
1.2.14Hazardous Waste
1.2.15Hazardous Debris
1.2.16Hazardous Materials
1.2.17Waste Hazardous Material (WHM)
1.2.18Oily Waste
1.2.19Regulated Waste
1.2.20Ozone Depleting Substance (ODS)
1.2.21Universal Waste

1.3 SUBMITTALS

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.4.1 Conformance with the Environmental Management System

1.5 QUALITY ASSURANCE

1.5.1 Preconstruction Survey

1.5.2 Regulatory Notifications

1.5.3 Environmental Brief

1.5.4 Environmental Manager

1.5.5 Contractor 40 CFR Employee Training Records

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 ENVIRONMENTAL COMPLIANCE REQUIREMENTS
3.2 ENVIRONMENTAL PROTECTION PLAN

3.2.1 Environmental Protection Plan Review

3.2.2 Licenses and Permits

3.3 PROTECTION OF NATURAL RESOURCES

3.3.1 Erosion and Sediment Control Measures

3.3.1.1 Burnoff
3.3.1.2 Protection of Erodible Soils
3.4STORM WATER POLLUTION PREVENTION, GENERAL PERMIT AND POST-CONSTRUCTION REQUIREMENTS

3.4.1 Storm Water Best Management Practices

3.4.2 Storm Water General Permit Requirements

3.4.3 Post-Construction Storm Water

3.5 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES MANAGEMENT

3.6 SOLID WASTE MANAGEMENT PLAN

3.6.1 Solid Waste Management Report

3.6.2 Control and Management of Solid Wastes

3.7 WHM/HW MATERIALS PROHIBITION

3.8 HAZARDOUS MATERIAL MANAGEMENT

3.8.1 Asbestos Management

3.8.2Polychlorinated Biphenyls (PCBs) Management
3.8.3Radioactive or Radionuclides Materials Management
3.8.4Lead Based Paint (LBP) Management

3.9 PETROLEUM PRODUCTS AND REFUELING

3.9.1 Oily and Hazardous Substances

3.9.2 Inadvertent Discovery of Petroleum Contaminated Soil or Hazardous Wastes

3.10 FUEL TANKS

3.11 RELEASES/SPILLS OF OIL AND HAZARDOUS SUBSTANCES

3.12 CONTROL AND MANAGEMENT OF HAZARDOUS WASTES

3.12.1Facility Hazardous Waste Generator Status
3.12.2Regulated Waste Storage/Satellite Accumulation/90 Day Storage Areas
3.12.3Class I [and II] ODS Prohibition
3.12.3.1Universal Waste/e-Waste Management
3.13WATER QUALITY REQUIREMENTS
3.13.1Ambient Water
3.13.2Drinking Water
3.13.3Domestic Wastewater
3.13.4Industrial Wastewater
3.13.5Groundwater and Construction Dewatering
3.13.6Miscellaneous

3.14 AIR QUALITY REQUIREMENTS

3.14.1Demolition, Site Clearing, Grading, Excavation, Backfilling, and Trenching
3.14.2Paving
3.14.3Coating, Painting, Adhering, and Sealing
3.14.4Abrasive Blasting and Corrosion Control
3.14.5Use of Portable Equipment Powered by Internal Combustion Engines
3.14.6Gasoline/E-85 Storage Tanks
3.14.7Ozone Depleting Substances (ODS)
3.14.8Operation of Vandenberg Owned Permitted Equipment
3.14.9Installation of Boilers, Hot Water Heaters, Furnaces, Process Heaters, and InternalCombustion Engines
3.15ABOVE GROUND STORAGE TANKS (AST) MANAGEMENT
3.16UNDERGROUND STORAGE TANKS (UST) MANAGEMENT
3.16.1SOIL CONTAMINATION MANAGEMENT
3.17LANDSCAPING REQUIREMENTS

3.18 GREEN PROCUREMENT PROGRAM (GPP)

3.19 ENERGY USAGE MANAGEMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Unless otherwise noted, the latest published version and/or revision shall be used.

U.S. AIR FORCE (USAF)

AFI 23-204Organizational Fuel Tanks
AFI 32-1053(2009) Pest Management Program
AFI 32-7040Air Quality Compliance
AFI 32-7044Storage Tank Compliance
AFI 32-7064Conservation and Management of Natural Resources
AFI 32-7065Cultural Resources Management
AFI 32-7080Compliance Assurance and Pollution Prevention
AFI 32-7086Hazardous Materials Management
AFI 32-7086Air Force Space Command Supplement, HazardousMaterials Management
AFI 40-201Managing Radioactive Materials In The USAF
30 SW AFI 40-101Managing Radioactive Materials
30 SWI 32-702Environmental Management Air Emission Inventories
30 SW Plan 32-1002Lead-Based Paint Management Plan
30 SW Plan 32-1052-AAsbestos Management Plan
30 SW Plan 32-1052-BAsbestos Operating Plan
30 SW Plan 32-4002-AHAZMAT Emergency Response Plan
30 SW Plan 32-4002-CSpill Prevention Control and Countermeasures Plan
30 SW Plan 32-7041-CWastewater Management Plan
30 SW Plan 32-7042Integrated Solid Waste Management Plan
30 SW Plan 32-7043-AHazardous Waste Management Plan
30 SW Plan 32-7043-ERecoverable and Waste Petroleum ProductsManagement Plan
30 SW Plan 32-7080Green Procurement Program Plan

Integrated Natural Resources Management Plan for Vandenberg AFB, Plan Period 2009-2013 Vandenberg AFB Energy Management Plan Vandenberg AFB Facilities Excellence Plan & Standards Vandenberg AFB Landscaping Guidelines HQ AFSPC CEA Policy Letter P01009, Tracking and Reporting Solid Waste Disposal and Diversions (30 Apr 01) VAFB Environmental Management System (EMS) Guide 2007 California Stormwater BMP Manual (2009, California Stormwater Quality Association) Off-Highway Vehicle BMP Manual for Erosion and Sediment Control (2007, California Department of Parks and Recreation)

1.1.2CALIFORNIA CODE OF REGULATIONS (CCR) & STATE OF CALIFORNIA
0. 8 CCR, Chapter 3.22, Subchapter 2Article 2.6 Asbestos Consultants andSite Surveillance Technicians, §341.15Certification of Asbestos Consultantsand Site Surveillance Technicians
8 CCR, Chapter 4, Subchapter 4Article 4 Dusts, Fumes, Mists, Vapors,and Gases, §1529 Asbestos
17 CCR, Division 1, Chapter 8Accreditation, Certification, and WorkPractices for Lead-Based Paint and LeadHazards
22 CCR, Chapters 10-20§66260-66270, Hazardous WasteRegulation
California Coastal ActPublic Resources Code, Division 20
California Assembly Bill AB 939California Integrated WasteManagement Act of 1989
California Assembly Bill AB 32California Global Warming Solutions Act

Santa Barbara County Air Pollution http://www.sbcapcd.org/rules/rules.htm

Control District (SBCAPCD) Rules &
Regulations
23 CCRWaters
1.1.3U.S. GOVERNMENT
0. Asbestos Hazard EmergencyPublic Law 99-519, 15 USC Section 2651 Response Act of 1986 (AHERA)
Archaeological Resources16 U.S.C. 470 aa-mm Protection Act of1979
Clean Water Act of 197233 U.S.C., §1251 et seq.

Comprehensive Environmental 42 USC §§ 9601 to 9675

Response, Compensation, and Liability
Act (CERCLA)
Government’s Green ProcurementSection 6002, Federal Procurement ofthe Resource Program Conservationand Recovery Act (RCRA)
Endangered Species ActPublic Law 93-205, 35 U.S.C. §1531
Energy Policy ActPublic Law 109-58
Environmental Protection AgencyComprehensive ProcurementGuidelines (EPA-CPG)
Environmental Protection AgencyToxic Substances Control Act (TSCA)
Executive Order 13112Invasive Species
Executive Order 11990Protection of Wetlands
Executive Order 13150Federal Workforce Transportation
Executive Order 13186Responsibilities of Federal Agencies toProtect Migratory Birds
Executive Order 13211Actions Concerning Regulations ThatSignificantly Affect Energy Supply,Distribution or Use
Executive Order 13221Energy Efficient Standby Power Devices
Executive Order 13423Strengthening Federal Environmental,Energy and TransportationManagement
Executive Order 13514Federal Leadership in Environmental,Energy and Economic Performance
Marine Mammal Protection Act50 CFR Part 218
Migratory Bird Treaty Act16 U.S.C. 703-712
National Historic Preservation16 U.S.C. 470 et seq.Act of 1966
National Environmental Policy ActPublic Law 91-190
Native American Graves ProtectionPublic Law 101-601and Repatriation Act of 1990
American Indian Religious FreedomPublic Law 95-341Act of 1978
White House Memorandum, Environmentally and Economically BeneficialPractices on Federal Landscaped Grounds
1.1.4U.S. ARMY CORPS OF ENGINEERS (USACE)
0. EM 385-1-1(2003) Safety -- Safety and Health Requirements
WETLAND MANUALCorps of Engineers WetlandsDelineation Manual Technical Report Y-87-1
1.1.5U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
0. 10 CFR 19Notices, Instructions and Reports to Workers: Inspection and Investigations
10 CFR 20Standards for Protection Against Radiation
10 CFR 36Licenses and Radiation Safety Requirements forIrradiators
10 CFR 39Licenses and Radiation Safety Requirements forWellLogging
29 CFR 1910Occupational Safety and Health Standards
29 CFR 1910.120Hazardous Waste Operations and Emergency Response
29 CFR 1926Safety and Health Regulations for Construction
33 CFR 328Definitions of Waters of the United States
40 CFR 61National Emission Standards for Hazardous AirPollutants (NESHAPS)
40 CFR 68Chemical Accident Prevention Provisions
40 CFR 82Protection of Stratospheric Ozone
40 CFR 98Mandatory Reporting of Greenhouse Gas
40 CFR 112Oil Pollution Prevention
40 CFR 122.26Storm Water Discharges (Applicable to State NPDESPrograms, see section 123.25)
40 CFR 152 - 186Pesticide Programs
40 CFR 190Environmental Radiation Protection Standards for Nuclear Power Operations
40 CFR 191Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
40 CFR 192Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings
40 CFR 241Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of residential, Commercial, and Institutional Solid Waste
40 CFR 258Subtitle D Landfill Requirements
40 CFR Parts 260-273Hazardous Waste Regulations
40 CFR 279Standards for the Management of Used Oil
40 CFR 280Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks (UST)
40 CFR 300National Oil and Hazardous Substances Pollution Contingency Plan
40 CFR 302Designation, Reportable Quantities, and Notification
40 CFR 355Emergency Planning and Notification
40 CFR 372-Subpart DSpecific Toxic Chemical Listings
40 CFR 761PCB Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
40 CFR 763Asbestos-Containing Materials in Schools
49 CFR 171 - 178Hazardous Materials Regulations

DEFINITIONS

1.2.1 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

0. Environmental Protection Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

Contractor Generated Hazardous Waste Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

Pesticide Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

Pests The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

Land Application for Discharge Water The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.

Surface Discharge The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.

Waters of the United States All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.

Wetlands Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with all applicable Federal, State, and local laws and regulations.

Sediment Soil and other debris that have eroded and have been transported by runoff water or wind.

Solid Waste Garbage, refuse, debris, sludge, or other discharged material, including solid, liquid, semisolid, or contained gaseous materials resulting from domestic, industrial, commercial, mining, or agricultural operations. Types of solid waste typically generated at construction sites may include:

a.Green waste: The vegetative matter from landscaping, land clearing andgrubbing, including but not limited to, grass, bushes, scrubs, small trees andsaplings, tree stumps and plant roots. Marketable trees, grasses and plantsthat are indicated to remain, be re-located, or be re-used are not included.
b.Surplus soil: Existing soil that is in excess of what is required for this work, includingaggregates intended, but not used, for on-site mixing of concrete, mortars and paving.Contaminated soil meeting the definition of hazardous material or hazardous waste is notincluded.
c. Debris: Non-hazardous solid material generated during the construction,demolition, or renovation of a structure which exceeds 60 mm 2.5 inch particlesize that is: a manufactured object; plant or animal matter; or natural geologicmaterial (e.g. cobbles and boulders), broken or removed concrete, masonry,androck asphalt paving; ceramics; roofing paper and shingles. Inert materials [may] [maynot] be reinforced with or contain ferrous wire, rods, accessories and weldments. Amixture of debris and other material such as soil or sludge isalso subject toregulation as debris if the mixture is comprised primarily of debris by volume, basedon visual inspection.

d. Wood: Dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated and/or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included.

e.Scrap metal: Scrap and excess ferrous and non-ferrous metals such as reinforcingsteel, structural shapes, pipe and wire that are recovered or collected and disposedof as scrap. Scrap metal meeting the definition of hazardous material or hazardouswaste is not included.
f.Paint cans: Metal cans that are empty of paints, solvents, thinners and adhesives. If permitted by the paint can label, a thin dry film may remain in the can.
g.Recyclables: Materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable. Metal meeting the definition of lead contaminated or lead based paint contaminated [may] [may not] be included as recyclable if sold to a scrap metal company. Paint cans [may] [may not] be included as recyclable if sold to a scrap metal company.

h. Hazardous Waste: By definition, to be a hazardous waste a material must first meet the definition of a solid waste. Hazardous waste and hazardous debris are special cases of solid waste. They have additional regulatory controls and must be handled separately. They are thus defined separately in this document.

Material not regulated as solid waste are: nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

Garbage Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

Chemical Waste This includes salts, acids, alkalizes, herbicides, pesticides, and organic chemicals.

Hazardous Waste Any discarded material, liquid, solid, or gas, which meets the definition of hazardous material or is designated hazardous waste by the Environmental Protection Agency or State Hazardous Control Authority as defined in 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, 40 CFR 268, 40 CFR 270, 40 CFR 271, 40 CFR 272, 40 CFR 273, 40 CFR 279, and 40 CFR 280.

Hazardous Debris As defined in Solid Waste paragraph, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) per 40 CFR 261; or debris that exhibits a characteristic of hazardous waste per 40 CFR 261.

Hazardous Materials Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172. Hazardous material is any material that:

a.Is regulated as a hazardous material per 49 CFR 173, or
b.Requires a Material Safety Data Sheet (MSDS) per 29 CFR 1910.120, or
c.During end use, treatment, handling, packaging, storage, transpiration, or disposalmeets or has components that meet or have potential to meet the definition of ahazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other instructions or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this instruction for "control" purposes. Such material include ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos,mercury, and polychlorinated biphenyls (PCBs). Nonetheless, the exposure may incur incident to manufacture, storage, use and demilitarization of these items.

Waste Hazardous Material (WHM) Any waste material which because of its quantity, concentration, or physical, chemical, or infectious characteristics may pose a substantial hazard to human health or the environment and which has been so designated. Used oil not containing any hazardous waste, as defined above, falls under this definition.

Oily Waste Those materials which are, or were, mixed with used oil and have become separated from that used oil. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, used oil and may be appropriately tested and discarded in a manner which is in compliance with other State and local requirements. This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that:

a.It is not prohibited in other State regulations or local ordinances
b.The amount generated is "de minimus" (a small amount)
c.It is the result of minor leaks or spills resulting from normal process operations
d.All free-flowing oil has been removed to the practical extent possible

Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, a hazardous waste determination must be performed prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

Regulated Waste Those solid waste that have specific additional Federal, state, or local controls for handling, storage, or disposal.

Ozone Depleting Substance (ODS) Class I ODS is defined in Section 602(a) of The Clean Air Act and includes the following chemicals:

· chlorofluorocarbon-11 (CFC-11)

· chlorofluorocarbon-12 (CFC-12)

· chlorofluorocarbon-13 (CFC-13)

· chlorofluorocarbon-111 (CFC-111)

· chlorofluorocarbon-112 (CFC-112)

· chlorofluorocarbon-113 (CFC-113)

· chlorofluorocarbon-114 (CFC-114)

· chlorofluorocarbon-115 (CFC-115)

· chlorofluorocarbon-211 (CFC-211)

· chlorofluorocarbon-212 (CFC-212)

· chlorofluorocarbon-213 (CFC-213)

· chlorofluorocarbon-214 (CFC-214)

· chlorofluorocarbon-215 (CFC-215)

· chlorofluorocarbon-216 (CFC-216)

· chlorofluorocarbon-217 (CFC-217)

· chlorofluorocarbon-500 (CFC-500)

· chlorofluorocarbon-502 (CFC-502)

· chlorofluorocarbon-503 (CFC-503)

· halon-1211

· halon-1301

· halon-2402

· carbon tetrachloride

· methyl bromide

· methyl chloroform

Class II ODS is defined in Section 602(s) of The Clean Air Act and includes the following chemicals:

· hydrochlorofluorocarbon-21 (HCFC-21)

· hydrochlorofluorocarbon-22 (HCFC-22)

· hydrochlorofluorocarbon-31 (HCFC-31)

· hydrochlorofluorocarbon-121 (HCFC-121)

· hydrochlorofluorocarbon-122 (HCFC-122)

· hydrochlorofluorocarbon-123 (HCFC-123)

· hydrochlorofluorocarbon-124 (HCFC-124)

· hydrochlorofluorocarbon-131 (HCFC-131)

· hydrochlorofluorocarbon-132 (HCFC-132)

· hydrochlorofluorocarbon-133 (HCFC-133)

· hydrochlorofluorocarbon-141 (HCFC-141)

· hydrochlorofluorocarbon-142 (HCFC-142)

· hydrochlorofluorocarbon-221 (HCFC-221)

· hydrochlorofluorocarbon-222 (HCFC-222)

· hydrochlorofluorocarbon-223 (HCFC-223)

· hydrochlorofluorocarbon-224 (HCFC-224)

· hydrochlorofluorocarbon-225 (HCFC-225)

· hydrochlorofluorocarbon-226 (HCFC-226)

· hydrochlorofluorocarbon-231 (HCFC-231)

· hydrochlorofluorocarbon-232 (HCFC-232)

· hydrochlorofluorocarbon-233 (HCFC-233)

· hydrochlorofluorocarbon-234 (HCFC-234)

· hydrochlorofluorocarbon-235 (HCFC-235)

· hydrochlorofluorocarbon-241 (HCFC-241)

· hydrochlorofluorocarbon-242 (HCFC-242)

· hydrochlorofluorocarbon-243 (HCFC-243)

· hydrochlorofluorocarbon-244 (HCFC-244)

· hydrochlorofluorocarbon-251 (HCFC-251)

· hydrochlorofluorocarbon-252 (HCFC-252)

· hydrochlorofluorocarbon-253 (HCFC-253)

· hydrochlorofluorocarbon-261 (HCFC-261)

· hydrochlorofluorocarbon-262 (HCFC-262)

· hydrochlorofluorocarbon-271 (HCFC-271) Universal Waste The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (e.g., thermostats) and lamps (e.g., fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at 40 CFR 273.

1.3 SUBMITTALS

The Contractor shall submit the following to 30 CES/CEIE and the Contracting Officer for government review in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

a.Environmental Protection Plan; G, 30 CES/CEIE (Section 3.2).
b.Air Emissions data; G, 30 CES/CEIE (Section 3.6).
c.Source Profile Form for boilers/hot water heaters, 30 SW Form 155/156; G, 30 CES/CEIE (Section 3.6).
d.Boiler Emission Standards and/or source test with applicable compliance certificationsdata that complies with applicable SBAPCD rule requirements; G, 30 CES/CEIE (Section 3.6).
e.Monthly Hazardous Material (HAZMAT) usage totals; G, 30 CES/CEIE (Section 3.8.c).
f.A Recovered Materials Determination Form (RMDF); G, 30 CES/CEIE (Section 3.18.b).
g.An Estimate of Percentage of Recovered Material Content for EPA-Designated Products; G, 30 CES/CEIE(Section 3.18.d).
h.Monthly Solid Waste Report, to include the weight and quantity of Solid Waste and Construction & Demolition debris both disposed and diverted; G, 30 CES/CEIE (Section 3.5.2.c. 8).
i.Industrial Wastewater Treatment Pond Processing Request; G, 30 CES/CEIE (Section 3.3.4).
j.Discharge to Grade Characterization Form; G, 30 CES/CEIE (Section 3.3.6).
k.Notice of Intent (NOI) to comply with the Terms of the General Permit to Discharge Storm Water Associated with Construction Activity; G, 30 CES/CEIE (Section 3.4.3).
l.Risk Assessment; G, 30 CES/CEIE (Section 3.4.2)
m.Draft and Final Storm Water Pollution Prevention Plan (SWPPP) and amendments; G, 30 CES/CEIE (Section 3.4.2).
n.Annual SWPPP Report; G, 30 CES/CEIE (Section 3.4.2).
o.Notice of Termination of Coverage under the Storm Water Construction General Permit (NOT) (Section 3.4.2).
p.Inspection Reports; G, 30 CES/CEIE (Section 3.4.2)
q.Noncompliance Reports; G, 30 CES/CEIE (Section 3.4.2)
r.Aboveground Storage Tank (AST) technical information; G, 30 CES/CEIE (Section 3.15.b)
s.30 SW Form 160 – Air Quality Recordkeeping Form Fuel Storage Tanks; G, 30 CES/CEIE
1.4ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

The Contractor may be required to promptly conduct tests and procedures for the purpose of assessing whether construction operations are in compliance with Applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

1.4.1 Conformance with the Environmental Management System

The Contractor shall perform work under this contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to objectives and targets, environmental programs and operational controls identified by the EMS. The Contractor will provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, the Contractor shall take corrective and/or preventative actions. In addition, the Contractor shall ensure that its employees are aware of their roles and responsibilities under the EMS and how these EMS roles and responsibilities affect work performed under the contract. The Contractor is responsible for ensuring that their employees receive applicable environmental and occupational health and safety training, and keep up to date on regulatory required specific training for the type of work to be conducted onsite. All on-site Contractor personnel, and their subcontractor personnel, performing tasks that have the potential to cause a significant environmental impact shall be competent on the basis of appropriate education, training or experience. Upon contract award, the Contracting Officer's Representative will notify the installation's EMS coordinator to arrange EMS training. Refer to the Installation’s EMS Coordinator for additional site specific EMS requirements related to construction. The installation's EMS coordinator shall identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. The Contractor shall provide training documentation to the Contracting Officer. The EMS coordinator shall retain associated records.

1.5QUALITY ASSURANCE
1.5.1Preconstruction Survey

Not used unless directed by the Contracting Officer. Environmental Impact Analysis is conducted via AF Form 813 for all construction activities.

1.5.2 Regulatory Notifications

The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Air Force must also provide public notification (such as storm water permitting), the Contractor must coordinate with the Contracting Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer prior to commencement of work activities. Typically, regulatory notifications must be provided for the following (this listing is not all inclusive): demolition, renovation, NPDES defined site work, remediation of controlled substances (asbestos, hazardous waste, lead paint).

1.5.3 Environmental Brief

Attend an environmental brief to be included in the preconstruction meeting. Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the activity; types and quantities of solid wastes and/or wastewater that may be generated during the contract. Discuss the results of the Environmental Impact Analysis at this time. Prior to initiating any work on site, meet with the Contracting Officer and activity environmental staff to discuss the proposed Environmental Management Plan. Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, required permits, permit requirements, and other measures to be taken.

1.5.4 Environmental Manager

Appoint in writing an Environmental Manager for the project site. The Environmental Manager will be directly responsible for coordinating contractor compliance with Federal, State, local, and station requirements. The Environmental Manager will ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal are all conducted in accordance with installation requirements and applicable laws and regulations); implement the Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials (authorizations, storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however the person in this position must be trained to adequately accomplish the following duties: ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

1.5.5 Contractor 40 CFR Employee Training Records

Prepare and maintain employee training records throughout the term of the contract meeting applicable 40 CFR requirements. [The Contractor will ensure every employee completes a program of classroom instruction or on-the-job training that teaches them to perform their duties in a way that ensures compliance with Federal, State and local regulatory requirements for RCRA Large Quantity Generator. The Contractor will provide a Position Description for each employee, by subcontractor, based on the Davis-Bacon Wage Rate designation or other equivalent method, evaluating the employee's association with hazardous and regulated wastes. This Position Description will include training requirements as defined in 40 CFR 265 for a Large Quantity Generator facility.] Submit these training records to the Contracting Officer at the conclusion of the project, unless otherwise directed.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 ENVIRONMENTAL COMPLIANCE REQUIREMENTS

a.General: Vandenberg Air Force Base (VAFB) Contractors, and their subcontractors, shallcomply with the most stringent federal, state, and local environmental laws, regulations,and Air Force policies, instructions, and plans. The federal government is not exemptfrom compliance with environmental regulations. The Contractor shall maintain anawareness of changing environmental regulatory requirements to avoid environmentaldeficiencies for activities on VAFB.
b.Environmental Coordination: The 30th Civil Engineer Squadron, Installation Management Flight (30 CES/CEIE) is the single point of contact for coordination with all environmental regulatory agencies. Prior to coordinating with any environmental regulatory agency, the contractor shall obtain approval from 30 CES/CEIE. The Contractor shall provide copies of any regulatory agency notification, report, consultation, permit, and/or regulatory document to 30 CES/CEIE. Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility.
(1) The Contractor shall comply with all permit conditions and consultationrequirements.

(2) The Contractor shall provide all required testing analysis and monitoring.

(3) The contractor may obtain VAFB environmental documents and plans from 30CES/CEIE.
c.Environmental Planning: The Contractor shall comply with all testing, monitoring, recordkeeping, reporting, mitigation, and protection measure requirements resulting from theNational Environmental Policy Act (NEPA), the Environmental Impact Analysis Process(EIAP), and the VAFB 332 process. To initiate NEPA and EIAP, submit an AF Form 813 tothe Planning Office in 30 CES/CEAO. Completion of the NEPA and EIAP processes cantake between three weeks to one year to complete. Early coordination is highlyadvised.
d.Environmental Audits/Inspections: The Contractor shall support the government with allfederal, state, local, and Air Force environmental inspections, audits, or assessments.
e.Notices of Violations (NOV): The Contractor shall be liable for any Notices of Violation(NOV), enforcement action, fine, penalty, and/or corrective action imposed by federal,state, or local environmental regulatory agencies for activities under the Contractor’scontrol. The Contractor shall provide verbal notification to 30 CES/CEIE and theContracting Officer within 24-hours of receiving an NOV followed by written notificationwithin three (3) working days.
3.2ENVIRONMENTAL PROTECTION PLAN

Prior to initiating any work on site, the Contractor will meet with the Contracting Officer to discuss the proposed Environmental Protection Plan and develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, and other measures to be taken. The Contractor's Environmental Plan shall incorporate construction related objectives and targets from the installation's Environmental Management System. The Environmental Management Plan will be submitted in the following format and shall include the elements specified below.

a. Description of the Environmental Protection Plan The Contractor’s EPP shall include a Scope of Work, Environmental Impact Analysis document (Base Civil Engineer Work Request, AF Form 813 or Finding of No Significant Impact), Contractor contact information and shall describe how they will meet environmental compliance requirements and address their methods, procedures, and practices pertaining to: Air quality, to include a listing of all combustion source equipment with appropriate CARB registration and SBCAPCD permits, ozone depleting substances (ODS) and greenhouse gases (GHG); Hazardous waste management; Hazardous materials management, to include spill/release management; Lead-based paint management; Asbestos management; Green Procurement; Solid waste and construction debris management, to include recycled/recovered materials; Water quality to include waste water, drinking water and storm water; Cultural resources protection; Natural resources protection; PCBs; Underground storage tanks; and Contaminated Soils Management. The Contractor shall maintain a copy of the EPP on-site. The Contractor shall brief their personnel of the contents and procedures in the EPP and ensure pertinent information is disseminated to subcontractors in order to maintain compliance.

3.2.1 Environmental Protection Plan Review

Within thirty days after the Contract award date, submit the proposed Environmental Protection Plan for further discussion, review, and approval. Commencement of work will not begin until the Environmental Protection Plan has been approved.

3.2.2 Licenses and Permits

Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility.

The following existing permits will be followed by the Contractor:

a. State Water Resources Control Board National Pollutant Discharge Elimination System (NPDES) General Permit Water Quality Order No. 2009-0009-DWQ (Construction General Permit); Refer to Section 3.4.2.

b. NPDES General Permit Water Quality Order No. 2013-0001-DWQ, Municipal General Permit. Refer to Section 3.4.3.

c. VAFB Landfill Permit

d.Lompoc Publicly Owned Treatment Works (POTW) Permit (Permit # I004)
The following permits will be obtained by the contractor (if applicable):
a.California Air Resource Board (CARB) Registration and SBCAPCD Permits.
b.Clean Water Act 401/402/404 Permits

The Contractor is responsible for conforming to all permit requirements and performing all quality control inspections of the work in progress, and to submit notifications and certifications to the applicable regulatory agency via the Contracting Officer.

3.3 PROTECTION OF NATURAL RESOURCES

Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work.

a.General: The Contractor shall comply with, but not limited to: the National Environmental Policy Act (NEPA); the Endangered Species Act; the Marine Mammal Protection Act, the Migratory Bird Treaty Act, Executive Order 11990, Protection of Wetlands; Executive Order 13112, Executive Order 13186, California Coastal Act of 1976; AFI 32-7064, Conservation and Management of Natural Resources; and Vandenberg's Integrated Natural Resources Management Plan. If the work is near streams, lakes, or other waterways, conform to the national permitting requirements of the Clean Water Act. The Contractor shall keep activities under surveillance and control to minimize disturbances and damage to the natural resources on VAFB.
b.Notification: The Contractor shall immediately notify 30 CES/CEIE, Chief of Natural Resources, if the Contractor or their biological monitors suspect the presence and impacts to any federally listed endangered or threatened species or their habitat. Vandenberg currently manages for 18 threatened and endangered species, including but not limited to the California red-legged frog, unarmored three-spine stickleback, Western snowy plover, California least tern, Gaviota tarplant, Vernal Pool fairy shrimp, and El Segundo Blue Butterfly.
c.Encountering Natural Resources: The Contractor shall not feed wild animals or cause litter (especially from lunch activities). The Contractor shall not travel in unauthorized areas or off-road to avoid disturbing sensitive resources or potentially coming in contact with ticks, hantavirus, wild animals, unstable coastline areas, and unsafe water situations.

d. Nesting Sites: The Contractor shall immediately notify 30 CES/CEIE of any nesting sites for avian species, nesting sites containing eggs and/or chicks, or roosting birds.

e. Disturbance of Plants: Contractors shall adhere to requirements stated in the AF Form 332, AF Form 813 or Environmental Assessment with respect to disturbance or removal of all plants and trees on VAFB. Mitigation may be required, including restoration with native seed mixes.

f. Contractor Equipment/Vehicles: Contractor equipment vehicles shall be cleaned of weed seeds prior to use in the project area to prevent the introduction of weeds. If equipment vehicles move from one watershed to another on base, wheels, undercarriages, and bumpers will be cleaned prior to traveling. If no nearby wash facility or means to collect on site and dispose of rinse water to a sewer is available, Contractor may air blast equipment vehicles on site.

3.3.1 Erosion and Sediment Control Measures

When soil disturbance is one acre or more refer to Section 3.4.2 Construction General Permit Stormwater Requirements. Refer to Section 3.17, Landscaping.

3.3.1.1 Burnoff

Burnoff of the ground cover is not permitted.
3.3.1.2Protection of Erodible Soils and Sediment Control
a.Provide erosion control for side slopes and back slopes upon completion of final grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.
b.Refer to Section 3.17, Landscaping and Section 3.4.1, Storm Water Best Management Practices. If soil disturbance is one acre or more, refer to Section 3.4.2, Construction General Permit Stormwater Requirements.
3.4Storm Water Pollution Prevention, Construction General Permit and Post-Construction Requirements
3.4.1Storm Water Best Management Practices (BMPs)

The Contractor shall implement and maintain BMPs in or similar to the current California Stormwater BMP Manual (California Stormwater Quality Association) to effectively prevent sediment, chemicals, or other pollutants from migrating into the storm water system, Waters of the U.S. and surface waters via stormwater, non-stormwater or wind. The 2007 Off-Highway Vehicle BMP Manual for Erosion and Sediment Control (California Department of Parks and Recreation) may also be referenced for erosion and sediment control. BMPs will include erosion and sediment controls, tracking controls, vehicle and equipment fueling and maintenance, spill prevention and control, concrete waste management, solid waste management, liquid waste management and stockpile management.

a.Exposed soils remaining upon completion of construction shall be permanently stabilized with vegetation to prevent erosion due to wind and rain. Refer toSection 3.17, Landscaping. When the construction activity is covered by theConstruction General Permit refer to Section 4.3.2 and the Construction General Permit for Conditions for Termination of Coverage.
b.Netting of permanent fiber rolls (wattles) and erosion control blankets shall be ofbiodegradable material only.
c.Do not use sand bags as inlet and drainage protection. Use gravel bags, inletprotection devices, inlet covers or absorbents as applicable.
d.Do not use straw bales for sediment control.
3.4.2Storm Water Construction General Permit Requirements
a.The contractor shall obtain coverage under the State Water Resources Control Board NPDES General Permit Order No. 2009-0009-DWQ (Construction General Permit) for construction activities of one acre or greater of disturbed soil unless a permit exemption applies. Contact 30 CES/CEIE Water Resources one month prior to construction to begin the process.
b.A Storm Water Pollution Prevention Plan (SWPPP) and Risk Assessment or Erosivity Waiver documents shall be developed by a Qualified Developer per the Construction General Permit. The Contractor shall provide a draft and final copy of their SWPPP and Risk Assessment to 30 CES/CEIE Water Resources for review and certification by 30 CES/CC or CD.
c.The Contractor shall assist 30 CES/CEIE with electronic filing of Permit Registration Documents (NOI, Risk Assessment, SWPPP, and Signed Certification Statement) with the SWRCB. The Contractor shall file the associated annual fee with the SWRCB.
d.SWPPP Implementation

The Contractor shall implement a SWPPP, including but not limited to BMPs, inspections, reporting and Sampling and Analysis requirements, in accordance with the Construction General Permit.

Contractor personnel implementing SWPPPs shall meet Permit requirements for Qualified Stormwater Inspectors and shall have attended one storm water Construction General Permit compliance and BMP training within the last five years.

The Contractor shall maintain a current copy of their SWPPP at the construction site per the permit requirements and shall provide a copy of any amendments to 30 CES/CEIE Water Resources.

The Contractor shall provide copies of required inspection forms, Construction Site and Run-on Evaluations and effluent monitoring results (as applicable) to 30 CES/CEIE Water Resources.

e.Annual Report
The Contractor shall provide 30 CES/CEIE Water Resources, an unsigned Annual Report by 15 August every year that the permit is active (between 1 July of the current year and 30 June of the previous year and for which a Notice of Termination (NOT) has not been submitted). 30 CES/CEIE will obtain certification from 30 CES/CC or CD.
30 CES shall electronically file the Annual Report with the SWRCB by the due date of 1 September.
As part of the annual report, the Contractor shall electronically submit water quality sampling results to the SWRCB.
The Contractor shall pay their annual fee before the end of their billing month every year until the NOT has been approved. This requirement may be waived by the SWRCB upon 30 CES/CEIE request.
f.Notice of Termination of Coverage under the General Construction Storm Water Permit (NOT).
The Construction General Permits’ Conditions for Termination of Coverage shall be met prior to NOT submittal. Vegetation shall cover 70 percent of 100 percent of the disturbed soil area or it must be demonstrated that the site will not pose any additional sediment discharge risk per the Construction General Permit Conditions. Refer to Section 3.17, Landscaping.
The Contractor shall submit the unsigned NOT and photos of the entire stabilized disturbed soil area to 30 CES/CEIE Water Resources. 30 CES/CEIE will obtain the required certification signature from 30 CES/CC or CD. 30 CES shall electronically file the NOT with the SWRCB.
It may take several months before a NOT can be approved by the SWRCB. Permit requirements are still enforceable until the NOT is approved by the Regional Water Quality Control Board. Once construction is completed, the Contractor will be required to perform storm water inspection monitoring, water quality sampling, BMP maintenance and may be required to repair erosion, reseed, mulch and provide irrigation to ensure seeded or planted areas achieve 70 percent soil coverage.
3.4.3Post-Construction Storm Water
a.All projects that create and/or replace 2,500 square feet or more square feet of impervious surface will implement one or more of the following site design measures to reduce project site runoff: Preservation of existing vegetation to the extent feasible, Stream Setbacks and vegetated buffers (30-foot minimum); Improvement and maintenance of soil through soil amendments; Tree planting and preservation; Rooftop and Impervious Area Disconnection; Vegetated Swales; Porous Pavement; Green Roofs; or equivalent measures. Use the California State Water Resources Control Board SMARTS Post-Construction Calculator or equivalent to quantify the runoff reduction resulting from implementation of site design measures.
b.All projects that create and/or replace 5,000 square feet or more of impervious surface will implement additional measures for source control, runoff reduction and storm water treatment to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the drainage area or areas with regard to the temperature, rate, volume, and duration of flow. Provide Maximum Extent Technically Feasible Determination to 30 CES/CEIE Water Resources. Refer to DoD Manual 3-210-10, Low Impact Development, for methods.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .