This is an Addendum to a Scope of Work for a door system maintenance and repair project at Building 6050 under solicitation FA460826QS005.
The scope encompasses six primary work tasks. Task 1 requires replacement of the crank limit switch on Door #1 to ensure proper operation and safety compliance. Task 2 mandates replacement of all limit switch assemblies and plungers for Doors 1 through 5, addressing a critical safety deficiency where current manual operation bypasses all safety mechanisms. Task 3 calls for replacement of all lifting belts on Doors 1 through 5 to restore operational integrity. Task 4 specifies comprehensive repair of Door #2's solid bottom panel, including replacement of upper and lower safety arrestors, rod assemblies, end plates, guide rail, and CLS limit switch, with fabric repair rather than complete replacement. Task 5 requires a complete factory-certified preventative maintenance service to ensure all doors operate in accordance with original equipment manufacturer (OEM) specifications. Task 6 involves replacement of the mandoor limit. The work emphasizes safety compliance and restoration of proper door system functionality across multiple units.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum: Scope of Work
This addendum details the scope of work for the door system maintenance and repair project at Building 6050.
1. Door #1 Crank Limit Switch Replacement
The crank limit switch on Door #1 will be replaced to ensure proper operation and safety compliance.
2. Limit Switch Assemblies Replacement (Doors 1-5)
All limit switch assemblies, including plungers, for Doors 1 through 5 will be replaced. This is a critical update as the current manual operation of the system bypasses all safety mechanisms.
3. Lifting Belts Replacement (Doors 1-5)
All lifting belts on Doors 1 through 5 will be replaced to restore the operational integrity of the entire door system.
4. Door #2 Solid Bottom Panel Repair
The solid bottom panel of Door #2 will be repaired. This work includes the following:
• Replacement of the upper and lower safety arrestors
• Replacement of rod assemblies
• Replacement of end plates
• Fabric repair that will not require a complete replacement
• Replacement of the damaged guide rail
• CLS limit switch
5. Comprehensive Preventative Maintenance Service
Attachment 5
FA460826QS005
A complete factory-certified preventative maintenance service will be performed to ensure all doors at Building 6050 operate in accordance with OEM specifications.
6. Mandoor Limit Replacement
The mandoor limit will be replaced.