This Performance Work Statement (PWS) dated 05 January 2025 details repair and calibration work for Hangar Door #2 at the B-52 Weapons Training Facility located at Barksdale Air Force Base in Louisiana. The project involves repairing a vertical lifting fabric hangar door (VLFHD) system, with specific requirements including full inspection, testing, repair, and certification of the entire 5-door hangar system to ensure safe and continuous operation. The contractor must provide all management, tools, supplies, equipment, and labor necessary to complete the work, adhering to local, state, federal laws, OSHA regulations, and Unified Facilities Guide Specifications (UFGS) 08 34 16.20.

Key work conditions include performing tasks between 07:30 a.m. and 4:30 p.m., excluding federal holidays and weekends, with the 2d Civil Engineer Squadron providing an 80' articulating lift and 100' electrical bucket truck for inspections. Contractors must be escorted while working, as the facility is located on the flight line, and must provide vehicle registration, insurance, and license plate information to Airfield Base Operations. Additional requirements include protecting building property, managing hazardous materials documentation, maintaining clear access for building occupants, and cleaning up the work site daily. The service request number is 5366199, and the contract number is FA460826QS005.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement, Dated 05 January 2025 Repair Hangar Door #2 and

Associated Mullion, Guiderails, and Calibration of Doors/Limits on

Entire 5-door Aircraft Hangar System at Bldg. 6050 B-52 Weapons Training Facility Service Request # 5366199

BACKGROUND: Repair door #2 of 5-door system to full operation, inspection and calibration of entire door system to ensure full/Safe functionality.

DESCRIPTION OF WORK: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair door #2 of the 5-door Vertical Lifting Fabric Hangar Doors (VLFHD) to full operation located at Barksdale Air Force Base Louisiana. The scope of performance includes, but is not limited to:

the inspection / testing, repair, and certification of vertical lifting fabric hangar doors listed on Appendix A In Accordance With (IAW) all local, state, federal laws / regulations, manufacturer’s requirements, Occupational Safety and Health Act (OSHA), and Unified Facilities Guide Specifications (UFGS) 08 34 16.20, in a manner that shall ensure continuous and safe operation.

A. FIELD CONDITIONS: The contractor shall be responsible for all field measurements to accomplish work. Quantity and sizes of materials shall be determined from site visits and drawings. The contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents. Furthermore, contractors should provide their own special equipment needed to fulfill the achievement of work and obey any safety regulations while on Barksdale AFB. **The 2d Civil Engineer Squadron will provide an 80’ articulating lift and 100’ Electrical Bucket truck to provide access for inspections.

B. ACCOMPLISHMENT OF WORK: The contractor must ensure all access to the existing building always remains clear for occupants and emergency egress during the construction period. All temporary closures, barriers , and protective procedures shall be coordinated with the Contracting Officer or representative. All work shall be accomplished between the hours of 07:30 a.m. and 4:30 p.m. to exclude federal holidays and weekends.

C. WORK CONDITIONS: The contractor shall coordinate work with the Contracting Officer or representative. The contractor shall notify 2 CES/CEOFE Electrical section point of contact the day he/she moves onto the work site to commence work. The contractor shall again provide notification the day he/she moves back to the work site after an interruption

Attachment 2

FA460826QS005

of work schedule and updates if required . This schedule shall describe major work items and projected completion dates.

D. HAZARDOUS MATERIAL: All documents related to the handling/disposal of h azard ous m aterial must be supplied to the Material Acquisition 2CES/CEOEM, ext. 456-8566. The contractor must obtain the proper documen ts from 2 CES/CEOEM to ensure all materi a l s e n te r i ng / l e av in g Barksdale AFB can be tracked and accou n ted for, in accordance wi th all governing laws.

E. PROTECTION OF BUILDING PROPERTY AND PERSONNEL: The contractor shall protect all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building property includes, but is not limited to, furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with certain construction operations, to prevent hazards or illnesses to base and contractor personnel.

F. CLEAN UP: The contractor shall clean up each work site at the end of each workday to the satisfaction of the POC. Upon completion of the work, all demolished equipment and debris shall be removed from the site, and the area shall be left in a neat and completely acceptable condition.

G. GENERAL NOTES: This facility/door is on the flight line. Contractors must be escorted for the duration of work. Contracting Representative must provide copies of vehicle registration, insurance and license plate number for all contract vehicles to Airfield Base Operations.

Attachment 2

FA460826QS005