Response to Question 1.docx

DOCX document 12 KB Posted

Attached to
Design and Construct an 14, 025 SF NAF Child Development Center (CDC) at Barksdale AFB, Louisiana
Solicitation number
FA4608-09-R-0027
Issued by

View the file

Other files

File Type Posted
CDC QUESTIONS.docx DOCX document
CDC QUESTIONS.docx DOCX document
CDC QUESTIONS.docx DOCX document
Appendix to Child Development Center BAFB.doc DOC document
Response to Question 2.docx DOCX document
Amendment 0002.doc DOC document
Barksdale AFB_Design Compatibility Guidelines_March 2006.pdf PDF
Correction to - Response to Question 1.docx DOCX document
P3.01.pdf PDF
M2.02.pdf PDF
bafb tblk24x36-1-B afjmc.dwg DWG drawing
E3.01.pdf PDF
E7.02.dwg DWG drawing
A1.06.dwg DWG drawing
M3.03.dwg DWG drawing
C1.01.dwg DWG drawing
S3-01.dwg DWG drawing
Site photo Child Development Center RFP.pdf PDF
XSITE.dwg DWG drawing
S2-01.pdf PDF
E2.01.dwg DWG drawing
M3.04.pdf PDF
A0.01 Cover.dwg DWG drawing
A1.08.pdf PDF
M2.01.pdf PDF
A1.07.pdf PDF
A1.03.pdf PDF
C1.00.dwg DWG drawing
M3.02.dwg DWG drawing
DEMOPLAN.pdf PDF
Design Build RFP Iindex.doc DOC document
Booklet Section 1 Meeting Minutes 03.24.09.pdf PDF
S1-01.dwg DWG drawing
S2-01.dwg DWG drawing
A1.02.pdf PDF
P2.02.dwg DWG drawing
E7.02.pdf PDF
Standard Template CDC 5-28-09.pdf PDF
S1-02.pdf PDF
M3.01.pdf PDF
A1.04.pdf PDF
S1-02.dwg DWG drawing
E7.01.dwg DWG drawing
P1.01.dwg DWG drawing
M1.01.dwg DWG drawing
E4.01.dwg DWG drawing
M3.03.pdf PDF
A1.08.dwg DWG drawing
A1.06.pdf PDF
A0.01 Cover.pdf PDF
Show 40 more

Latest 50 of 110 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

At the site visit/pre-proposal conference held on August 26th, 2009, it was stated the documents/files on the CD issued to attendees were at 35% completion. After review of the drawings the Breck Construction/Architecture+ team consider the documents to be far more advanced than 35%, which leads to the question:

"With this being a Full and Open Request for Proposal for Design-Build of the proposed new Child Development Center at Barksdale AFB, are Contractors required to work with the Consultants who prepared the Design and Design Development Documents that were issued to attendees and available on the FBO Site, or are the electronic documents now released, without Copy Right violation, for over-writing, modifications, notes, details and development into a full set of Construction Documents on Drawing Sheets bearing the names of Architects, Engineers and Consultants, other than those on the Preliminary Documents? "

· The government furnished a 35% design to all interested parties. The requirement calls for the awardee to complete the design up to 100% either with their own A&E firm or continued use of the exisitng consultant. The documents are not copyright violated. Upon award any changes and submittals will be reviewed and will have to be accepted by the government.

File details come from the government source that posted it. Updated .