Combined diagrams_FA460025Q0030.pdf
PDF 5 MB Posted
- Attached to
- Fire Alarm Maintenance
- Solicitation number
- FA460025Q0030
About this file
These technical drawings are comprehensive architectural and engineering plans for a renovation project at Offutt Air Force Base, specifically for repairing the HVAC system in Building 123. The documents include detailed schematics for demolition, mechanical, electrical, and HVAC systems across multiple building levels, with a focus on the following key aspects:
The project involves a complete HVAC system overhaul, including demolition of existing mechanical infrastructure, electrical systems, and asbestos removal. The plans cover both lower and upper levels of the building, detailing precise modifications to mechanical rooms, auditorium spaces, and support areas. Specific elements include new ductwork, electrical wiring, temperature control systems, power and auxiliary systems, and comprehensive architectural modifications. The drawings are marked as "As-Built" plans, indicating they represent the final, completed design after implementation, and are part of project number SGBP 94-0005 A1 for the Offutt Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A0.1 Vicinity Map
| A0.2 Index |
| A0.3 Std Symbols & Abbreviations |
| A1.1 Lower Level Demo Plan |
| A1.2 1st Flr Demo Plan |
| A1.3 2nd Flr Demo Plan |
| A1.4 Lower Level Flr Plan |
| A1.5 1st Flr Plan Wall Types |
| A1.6 1st Level Reflected Clg Plan |
| A1.7 2nd Level Flr Plan |
| A2.2 Ext Elevs |
| A4.1 Stair & Ramp Sections |
| E0.1 Elec Symb Legend, Abbrevs, Gen Notes |
| E0.2 Site Elec Utility Plan |
| E0.3 Lower Level Elec Demo Plan |
| E1.1 Lower Level Lighting Plan |
| E3.1 One Line Diagram |
| E3.2 Riser Diagrams |
| E4.1 Elec Sched |
| H1.1 1st Flr Asbestos Removal Plan |
| H1.2 2nd Flr Asbestos Removal Plan |
| M0.0 Mech Symbols, Abbrevs & Notes |
| M0.1 Lower Level Mech Rm Demo Plan |
| M0.2 1st Level Mech Demo Plan |
| M0.3 2nd Level Mech Demo Plan |
| M1.1 1st Level HVAC Plan |
| M1.2 2nd Level HVAC Plan |
| M2.1 1st Level Piping Plan |
| M2.1 Lower Levels Pwr & Aux Sys Plan |
| M3.1 Lower Mech Rm Piping |
| M5.1 Mech Details |
| M6.1 Mech Sched |
| M6.2 Mech Sched |
File details come from the government source that posted it. Updated .