RTEP: FA4600-XX-X-XXXX-0001
PERFORMANCE WORK STATEMENT
SHAPE \* MERGEFORMAT
C2 Software Sustainment
RTEP: FA4600-XX-X-XXXX-0001
1 September 2017 11.
Description of Service/General Information
11.1.
Description of Services
11.2.
Background
11.3.
Scope of Work
11.4.
Period of Performance
22.
Requirements
22.1.
Description of requirements
22.2.
Deliverables
22.2.1.
Documents/reports/studies/software
22.2.2.
Milestones/reviews
22.3.
Travel
22.4.
Mission Essential Service
33.
Government Furnished Property and Services
33.1.
Government Furnished Property
33.1.1.
Government-Furnished Materials/Equipment:
33.1.2.
Facilities
33.1.3.
Supplies
33.1.4.
Contractor Acquired Equipment
44.
Applicable Documents
44.1.
Government Documents
44.2.
Non-Government Documents
44.3.
Standards
44.4.
Contracting
55.
Acronyms
1. Description of Service/General Information
1.1. Description of Services
The purpose of this Command and Control System Engineering Support III (C2SES III) effort is to utilize contractor expertise to ensure the proper development, testing, delivery, installation, and sustainment of C2SES III capability. The office of primary functional responsibility for C2SES III activities, USSTRATCOM/J864, oversees all activity related to this Performance Work Statement (PWS).
1.2. Background
USSTRATCOM requires software maintenance and system engineering support to perform the specific tasks identified in this PWS to meet the mission requirements as identified in the Joint Strategic Capabilities Plan (JSCP), CJCSI 3110.04A (Nuclear Supplement to JSCP), Emergency Action Procedures (EAP)-CJCS Vols IR, VII, & VIII, the C2 Modernization ORD, the NPES ORD, and the USSTRATCOM UCP, none of which are releasable to the contractor.
1.3. Scope of Work
This task order establishes the performance for providing software and system engineering support for the following systems/applications included in C2SES III:
· Force Status and Readiness (FSR)
· Force Survivability, Analysis, and Management (FSAM)
· Global Information Grid (GIG)/ Area of Responsibility (AOR) Decision Support System (GADSS)
· Nuclear Planning and Execution System (NPES)
· NPES Strategic Data Loader (NSDL)
· Low to High (L2H)
The contractor shall provide the requirements outlined in this PWS IAW the C2SESIII PWS. NPES and NSDL support will be managed as separate WBSs under a combine CLIN within the overall task effort. FSR, GADSS, and L2H support will be managed as separate WBSs under a combine CLIN within the overall task effort. FSAM support will be managed as a separate WBS project, under a separate CLIN, within the overall task effort.
1.4. Period of Performance
The Period of Performance will be one base year, four option years, and a six month extension.
2. Requirements
2.1. Description of requirements
The Contractor shall:
a) Coordinate software change requests, deficiency reports, and projects into scheduled releases in coordination with the Government.
b) Support up to two major releases per year and up to four minor releases per year for each application/system.
c) Support patches as required to address issues identified in the field or to support security findings.
d) Provide system engineering and support services for all software releases as required and for requirements identified by the Government.
e) Maintain utilities and tools required to support the current suite of software.
2.2. Deliverables
2.2.1. Documents/reports/studies/software
a) The contractor shall deliver all software documentation IAW the C2SES III PWS paragraph 3.1 and 3.4.
b) The contractor shall deliver all system engineering and support services documentation IAW the C2SES III PWS paragraph 4.
2.2.2. Milestones/reviews
The contractor shall identify all milestones and reviews for all software releases in the IMS for Government approval.
2.3. Travel
Travel will be conducted on a cost reimbursable basis in accordance with (IAW) the Joint Federal Travel Regulations. The contractor shall provide all associated costs for conducting the travel.
2.4. Mission Essential Service
None
3. Government Furnished Property and Services
3.1. Government Furnished Property
3.1.1. Government-Furnished Materials/Equipment:
No unique requirements
3.1.2. Facilities
All work will be conducted as USSTRATCOM.
3.1.3. Supplies
None
3.1.4. Contractor Acquired Equipment
None
4. Applicable Documents The following documents shall form a part of this specification to the extent specified herein. In the event of conflict between the documents referenced and the contents of this specification, the contents of this specification shall be considered a superseding requirement.
4.1. Government Documents
Performance Work Statement for the USSTRATCOM Command and Control Software Engineering and Support III
4.2. Non-Government Documents
No special guidance
4.3. Standards
No special guidance
4.4. Contracting
No special guidance
5. Acronyms
TO
Task Order
NPES
Nuclear Planning and Execution System
PMO
Program Management Office
PWS
Performance Work Statement
USSTRATCOM
United States Strategic Command
Section J, Attachment 15
PAGE
File details come from the government source that posted it. Updated .