Section_J _Attachment_13 _C2SES_III_CostPriceModel.xlsx
XLSX spreadsheet 696 KB Posted
- Attached to
- C2SES III
- Solicitation number
- FA4600-16-R-0007
About this file
Draft C2SESIII Cost/Price Model - Section J Attachment 13
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Directions
| COST MODEL DIRECTIONS FOR | |||
| RFP FA4600-16-R-0007 | |||
| C2SES III Cost Model, Ver. 1.0 Dated 07/25/2016 | |||
| Assumptions: | |||
| 1. | This cost model is used to derive the Total Evaluated Price, which is based off the cost/price of Task Order 0001 and the sum of the Future Growth (FFP) labor categories. | ||
| 2. | The Fringe Benefit allocation base is total labor dollars. | ||
| 3. | The Labor Overhead allocation base is total direct labor dollars PLUS associated fringe benefit. | ||
| 4. | The G&A allocation base is total cost input. | ||
| 5. | DCAA audited Facilities Capital Cost of Money (FCCoM), is incorporated in TAB "Loading Factors". Must submit DD 1861. | ||
| Overtime for exempt personnel is based on a total time accounting concept. (Annual salary divided by | |||
| 7. | total hours worked, equals the hourly rate). Overtime for labor category rates is 1.5 times the straight time rate. | ||
| 8. | The Government will rely on Offerors to tell us in the TAB "Loading Factors" what their annual Full Time Equivalent (FTE) is per year. | ||
| 9. | Fixed Fee is not applied to government directed (pre-populated) ODCs Travel and Materials. | ||
| 10. | Client site refers to work done at Government locations. | ||
| 11. | All Government populated costs (Travel and government directed ODC costs) includes all burdens. | ||
| Directions for PRIME: | (ONLY FILL IN AREAS HIGHLIGHTED IN YELLOW) | ||
| 1. | Primes will bid government directed ODC Travel & Material/Equipment costs at the prepopulated dollar amount provided. The total amount includes all burdens. | ||
| 2. | Primes must explain any ODC costs (i.e. computer services) and provide it within the summary tab. These costs cannot be used within the ODC Travel & Material/Equipment cost that is prepopulated by the government | ||
| Directions for both PRIME & SUB(s): | |||
| 1. | If the assumptions are valid, fill in only the cells that are highlighted in yellow, beginning with the company name at the top of TAB Loading Factors. | ||
| 2. | If the assumptions are not valid, modify appropriate loaded rates in the Loading factors TAB, and if needed throughout the TABs. Identify changes by | ||
| highlighting the cells with changed formulas in Green and describe the changes as well as the reasons for those changes in the space provided at the | |||
| bottom of the Loading Factors TAB. | |||
| 3. | Complete all TO 0001 tabs and the Future Growth tab. Once you input the Labor Categories, direct rates, and hours the remaining TAB columns and rows will automatically fill in. | ||
| 4. | The labor rates will automatically be adjusted based on Offerors inputs in the Loading Factors TAB. | ||
| 7. | Complete TAB Benefit Summary for the employee compensation plan. Completion of this TAB is mandatory and staisfies the | ||
| requirement for the 52.222-46 clause for Employee Compensation Plan. No additional information is required, but supplementary data may be provided. | |||
| 8. | Shall have no more than two rounding places. We understand minor rounding errors. (Amounts in TAB Grand Total will be to the nearest whole dollar.) | ||
| 9. | If applicable provide your proprietary statement in the footer of each TAB. | ||
| `10. | Subcontractors that have a cost plus arrangement with the prime must submit a cost proposal if they have a Basis Of Estimate of 10% or more of the | ||
| Prime contractors total proposed cost. (If you have Subs that will be submitting a cost proposal, ensure they have an approved accounting system.) | |||
| Directions for SUBs: | |||
| 1 | Subcontractors must submit to 55th Contracting the following tabs: Loading factors, and all TO 0001 tabs. | ||
| (Only if Subs have a Basis Of Estimate of 10% or more of the Primes total proposed cost for TO 0001 efforts) | |||
| 2 | Subcontractors must submit a tab equivalent to a TO 0001 tab if they are a subcontractor for the FFP Future Growth Effort. | ||
| (Only if Subs have a Basis Of Estimate of 10% or more of the Primes total proposed cost for FFP Future Growth efforts) | |||
| 3 | Subcontractors must submit to their PRIMES their fully burden rates by Labor Category and hours for all CLINs so that the PRIMES can fill in the | ||
| TAB called SUB Labor Prime Fills in. | |||
| Helpful Hints and Reminders: | (Please keep in mind that we had to create this cost model with more labor categories rows than will most likely be needed) | ||
| 1. | For approved DCAA loaded rates not identified in the Loading Factors TAB you can include these changes by inserting or deleting new rows or columns | ||
| in the middle of ranges, the applicable formulas and references for computational cells can be input using the "click and drag" technique. | |||
| 2. | Use the checklist provided below to ensure your proposal is complete. |
| Pricing Model Checklist | ||
| √ | Have the following been completed? | |
| Subs were sent the Pricing Model with the following TABs: Directions, Loading Factors, all TO 0001 tabs, the FFP Future Growth Tab, & Benefit Summary | ||
| Prime / Sub company names are entered on the Loading Factors TAB. (Company names automatically populate to the rest of the TABs) | ||
| Input your Indirect rates into the Loading Factors TAB. | ||
| If the pricing model formulas for applying the indirect rates are not consistent with company accounting practices, | ||
| the appropriate formulas have been modified, | ||
| the changed cells are highlighted in Green, and | ||
| the changes are explained at the bottom of the Loading Factors TAB. | ||
| Listed cognizant DCAA and DCMA representatives in the Loading Factors TAB. | ||
| If rates/categories differ from the model, the differences are explained at the bottom of the Loading Factors TAB. | ||
| Base year direct rates and hours are entered into TO 0001 tabs and loaded in the Cost Model II - Tech Risk | ||
| Prime has manually filled in the SUB Labor in each TO 0001 tab | ||
| If applicable, supporting information for labor, indriect rates and or ODCs are provided in your Cost Volume Narrative. (Example: FCCoM DD Form 1861) | ||
| Supporting information for labor and indirect rates is provided in your Cost Volume narrative. | ||
| Ensure the Target, Adj, Final Cost in TAB CPIF SHAREs agrees with what you intended to submit for a Total Final Price | ||
| Benefits Summary TAB completed. | ||
| The Prime has indicated (in the summary tab) if there are any ODCs not included in the government provided cost model | ||
| F |
FA4600-16-R-0007 Section J, Attachment 13
Page &P
Loading Factors
| LOADING FACTORS MPACS | |||||||
| Prime Name: | PRIME | ||||||
| Subcontractor Name: | SUB | ||||||
| Base Year | 6 Month | ||||||
| Extension | |||||||
| LOADING FACTORS: | Opt 1 | Opt 2 | Opt 3 | Opt 4 | Opt 5 | Opt 6 | |
| CONTRACTOR SITE: | |||||||
| Fringe - Contractor Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Overhead - Contractor Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| FCCoM - Contractor Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| GOVERNMENT SITE: | |||||||
| Fringe - Client (Government) Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Overhead-Client (Government) Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| FCCoM - Client (Government) Site | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| OTHER LOADING FACTORS: | |||||||
| IT (Computing) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| If you pool FCCom as 1 pool: FCCoM, Direct Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| If you pool FCCom as 1 pool: FCCoM, G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| General and Administrative (G&A) Rate | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Material & Handeling (Burden on ODC &/or Subs) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Target Fee | 9.00% | 9.00% | 9.00% | 9.00% | 9.00% | 9.00% | 9.00% |
| Max Fee | 9.50% | 9.50% | 9.50% | 9.50% | 9.50% | 9.50% | 9.50% |
| Min Fee | 2.00% | 2.00% | 2.00% | 2.00% | 2.00% | 2.00% | 2.00% |
| Profit on Sub Labor (Only Prime fills this in) | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Profit | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Annual salary is divided by 1860 for direct labor* | 1860 | 1860 | 1860 | 1860 | 1860 | 1860 | 1860 |
| Wrap Rate W/O fee Contractor Site (Auto calculated) | - | - | - | - | - | - | - |
| Wrap Rate W/O fee Client Site (Auto calculated) | - | - | - | - | - | - | - |
| *All offerors will use 1860 unless they have identified Uncompensated Overtime. (See FAR 52.237-10) | |||||||
| YES | NO | ||||||
| Do you have a Forward Pricing Rate Agreement? | |||||||
| If Cost Plus agreement with Sub(s) do they have a DCAA deemed adequate accting sys. | |||||||
| Identify your company's Full Time Equivalent (FTE) hours. | 0 | ||||||
| Subcontractor identify the type of contract you have with the Prime? | Drop Down Menu |
| DCAA, DCMA & CHANGES TO PRICE MODEL | |
| Prime Name: | PRIME |
| Subcontractor Name: | SUB |
| List your Cognizant DCAA and DCMA Representative or Branch: | |
| Utilize the DCAA website to locate your audit office number at http://www.dcaa.mil/ | |
| The DCAA office listed below will be the same office the offeror sent their cost proposal to | |
| Name & or Branch (If Branch, include Branch #): | |
| Address: |
| Phone Number & Fax Number: | Phone: | Fax: |
| E-mail: | ||
| E-mail for DCAA is first name, a period, Last Name, @dcaa.mil OR you can use the DCAA branch number | ||
| dcaa-fao, Last 4 of the branch #@dcaa.mil Example: stanley.stearns@dcaa.mil OR dcaa-fao1621@dcaa.mil |
DCAA, DCMA & CHANGES TO PRICE MODEL, Cont.
| Defense Contract Management Agency (DCMA) Cognizant office: |
| Name & or Location: |
| Address: |
| Phone Number & Fax Number | Phone: | Fax: |
| E-mail: |
CHANGES TO PRICING MODEL (ie.. Additional approved DCAA Loading Rates):
FA4600-16-R-0007
Section J, Attachment 13
NPES - Hours
| Prime Name: | PRIME | |||||||||||
| Sub Name: | SUB | |||||||||||
| Task Order 0001 - NPES: | TRANSITION PERIOD | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | Administration | Software Development | Systems Engineering | Configuration Management | Database Management | Quality Assurance | Testing | Communications | Other | Other | Other | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Contractor - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
TRANSITION PERIOD TOTALS = 0
| Task Order 0001 - NPES: | BASE PERIOD | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Contractor - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
BASE PERIOD TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 1 | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | TOTAL | |||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 1 TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 2 | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 2 TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 3 | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 3 TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 4 | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 4 TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 5 | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 5 TOTALS = 0
| Task Order 0001 - NPES: | OPTION PERIOD 6 (six month extension)_ | |||||||||||
| Government Site - Prime | TECHNICAL | |||||||||||
| Labor Category | System Engineering | Database | Detailed Design | Code | Unit Test | Code Review | Defective Workoff | Information Assurance | Data/CDRLS | Config Mgt/Data Mgt | Quality Assurance | TOTAL HOURS |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | ||||||||||||
| Government Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Government Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
| Contractor Site - Prime | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site - Subcontractor | ||||||||||||
| Labor Category | TOTAL | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 0 | ||||||||||||
| Contractor Site TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 |
OPTION PERIOD 6 TOTALS = 0
FA4600-16-R-0007 Section J, Attachment 13
NPES - Cost
| Prime Name: | PRIME | |||
| Sub Name: | SUB | |||
| Task Order 0001 - NPES: | TRANSITION PERIOD (FFP) | |||
| Government Site - Prime | Fully Burdened | |||
| Labor Category | Rate | HOURS | TOTAL | |
| 0 | $ - 0 | |||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0.00 | 0 | $ - 0 | ||
| 0 | $ - 0 | |||
| Government Site - Subcontractor | Fully Burdened | |||
| Labor Category | Rate | HOURS | TOTAL | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | 0.00 | 0 | $ - 0 | |
| 0 | $ - 0 | |||
| Government Site TOTAL | 0 | $ - 0 |
| Contractor Site - Prime | Fully Burdened | ||||
| Labor Category | Rate | HOURS | TOTAL | ||
| 0.00 | 0 | $ - 0 | |||
| 0.00 | 0 | $ - 0 | |||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | $ - 0 | ||||
| Contractor - Subcontractor | Fully Burdened | ||||
| Labor Category | Rate | HOURS | TOTAL | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | 0.00 | 0 | $ - 0 | ||
| 0 | $ - 0 | ||||
| Contractor Site TOTAL | 0 | $ - 0 | |||
| FTEs | |||||
| TRANSITION PERIOD TOTALS = | ERROR:#REF! | 0 | $ - 0 |
| Task Order 0001 - NPES: | BASE PERIOD (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Government Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Government Site TOTAL | 0 | $ - 0 | $ - 0 |
| Contractor Site - Prime | Direct | Fringe | OH | IT | G&A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Contractor - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Contractor Site TOTAL | 0 | $ - 0 | $ - 0 | |||||||||
| FTEs | ||||||||||||
| BASE PERIOD TOTALS = | ERROR:#DIV/0! | 0 | $ - 0 | $ - 0 |
| Task Order 0001 - NPES: | OPTION PERIOD 1 (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Government Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Government Site TOTAL | 0 | $ - 0 | $ - 0 |
| Contractor Site - Prime | Direct | Fringe | OH | IT | G&A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Contractor Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Contractor Site TOTAL | 0 | $ - 0 | $ - 0 | |||||||||
| FTEs | ||||||||||||
| OPTION PERIOD 1 TOTALS = | ERROR:#DIV/0! | 0 | $ - 0 | $ - 0 |
| Task Order 0001 - NPES: | OPTION PERIOD 2 (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Government Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Government Site TOTAL | 0 | $ - 0 | $ - 0 |
| Contractor Site - Prime | Direct | Fringe | OH | IT | G&A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Contractor Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Contractor Site TOTAL | 0 | $ - 0 | $ - 0 | |||||||||
| FTEs | ||||||||||||
| OPTION PERIOD 2 TOTALS = | ERROR:#DIV/0! | 0 | $ - 0 | $ - 0 |
| Task Order 0001 - NPES: | OPTION PERIOD 3 (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Government Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Government Site TOTAL | 0 | $ - 0 | $ - 0 |
| Contractor Site - Prime | Direct | Fringe | OH | IT | G&A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Contractor Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Contractor Site TOTAL | 0 | $ - 0 | $ - 0 | |||||||||
| FTEs | ||||||||||||
| OPTION PERIOD 3 TOTALS = | ERROR:#DIV/0! | 0 | $ - 0 | $ - 0 |
| Task Order 0001 - NPES: | OPTION PERIOD 4 (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Government Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Government Site TOTAL | 0 | $ - 0 | $ - 0 |
| Contractor Site - Prime | Direct | Fringe | OH | IT | G&A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | $ - 0 | $ - 0 | ||||||||||
| Contractor Site - Subcontractor | Fully Burdened | |||||||||||
| Labor Category | Rate | HOURS | TOTAL | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | 0.00 | 0 | $ - 0 | |||||||||
| 0 | $ - 0 | |||||||||||
| Contractor Site TOTAL | 0 | $ - 0 | $ - 0 | |||||||||
| FTEs | ||||||||||||
| OPTION PERIOD 4 TOTALS = | ERROR:#DIV/0! | 0 | $ - 0 | $ - 0 |
| Task Order 0001 - NPES: | OPTION PERIOD 5 (CPIF) | |||||||||||
| Government Site - Prime | Direct | Fringe | OH | IT | G & A | FCCoM | FCCoM | FCCoM | TOTAL | TOTAL | TOTAL | |
| Labor Category | Rate | Cost | Cost | Cost | Cost | CC | DL | G&A | RATE | HOURS | W/Out FCCoM | With FCCoM |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 | |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .