Section 1B Master Copy Dec 2007.pdf

PDF 80 KB Posted

Attached to
RECOVERY - SGBP080045 - Repair Txy Lights A & B
Solicitation number
FA4600-09-B-0008
Issued by

About this file

Section 1B

View the file

Other files

File Type Posted
Taxiway Lights QA.doc DOC document
FA4600-09-B-0008-0003 Amendment to Change Wage Determination.doc DOC document
Wage Rate Attachment Heavy and Highway.doc DOC document
Taxiway Lights QA.doc DOC document
FA4600-09-B-0008-0002 Amendment to Extend Bid Opening Date.doc DOC document
Taxiway Site Visit Information.doc DOC document
FA4600-09-B-0008-0001 Amendment to Change Site Visit Date.doc DOC document
TOC Final.pdf PDF
16511 Final Airfield Lighting.pdf PDF
100 Spec Cover.pdf PDF
Sheet 3.dwf DWF file
Seal Page Repair Taxiway.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 8.dwf DWF file
Sheet 10.dwf DWF file
NCIC.doc DOC document
Sheet 7.dwf DWF file
01732 Final Selective Demolition.pdf PDF
16110 Final Raceways.pdf PDF
02920 Final Lawns and Grasses.pdf PDF
16452 Final Grounding.pdf PDF
02741 Final Asphalt Paving.pdf PDF
16195 Final Electrical Identification.pdf PDF
Sheet 9.dwf DWF file
02584 Final Underground Ducts and Utility Structures.pdf PDF
Sheet 5.dwf DWF file
Sheet 6.dwf DWF file
Wage Rate Attachment.doc DOC document
FA4600-09-B-0008.doc DOC document
Sheet 2.dwf DWF file
Bidders Checklist.doc DOC document
Section 1A Master Copy June 2008.pdf PDF
Sheet 4.dwf DWF file
03301 Final Miscellaneous Cast-In-Place Concrete.pdf PDF
Sheet 1.dwf DWF file
02300 Final Earthwork.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT PROJECT NO: SGBP 08-0045 DEC 2007

TITLE: REPAIR TAXIWAY CIRCUITS A & B

1B - 1

SECTION 1B

GENERAL CONDITIONS - SHOP DRAWINGS/SUBMITTALS

INDEX

1. Shop Drawings 5. Record Shop Drawings/Guarantees

2. Deviations 6. Transfer and Acceptance of Military Real

3. Submittals Property DD Form 1354

4. As-Constructed Drawings 7. Contractor Provided Specifications

1. SHOP DRAWINGS: In accordance with the CONTRACT PROVISIONS, and within 30 days after

Notice to Proceed, the Contractor shall submit to the Contracting Officer for approval, in the quantities indicated on AF Form 66 Schedule of Material of Submittals, complete shop drawings of materials and equipment to be incorporated in the work. Shop drawings shall include catalog number, cuts, diagrams, drawings and such other descriptive data as may be required by the Contracting Officer. Shop drawings on component items forming a system, or that are interrelated, shall be submitted at one time as a single submittal in order to demonstrate the items have been properly coordinated and will function properly as a system. A notation shall be made on each shop drawing submitted as to the item's specific use, either by the particular type number reference on the drawings; or in the specifications: by a reference to the applicable paragraph of the specifications, or by a description of its specific location.

2. DEVIATIONS: Shop drawings shall represent the equipment and material requirements as specified herein and on the drawings. Where shop drawings deviate from the specifications or drawings, the

Contractor shall inform the Contracting Officer in writing and clearly indicate the deviations and the reasons therefore. Such deviations shall be evaluated and, if accepted, will be processed as a modification to the contract. The contract specifications and drawings shall govern over shop drawings, even though approved by the Government, where the Contractor has not identified a deviation to the Contracting

Officer. In such cases, the Contractor will be required to comply with the contract specifications and drawings at no additional cost to the Government.

3. SUBMITTALS: Shop drawings, samples, letters, certificates, etc., shall be submitted for, but not limited to the items listed in each section of the specifications. Submittals in addition to those listed, may be required by the Contracting Officer. The AF form 66 summarizes contained within the construction documents summarizes the required project submittal items, but may not be complete.

4. AS-CONSTRUCTED DRAWINGS: The contractor shall maintain, and have on site for review at all times, a separate set of full-scale Contract Drawings marked-up to fully indicate as-constructed conditions. All variations from the Contract Drawings, for whatever reason, including those resulting from the use of optional materials, shall be indicated. These variations shall be shown in the same general detail utilized in the initial Contract Drawings. The marked-up drawings shall be furnished to the government not later than 10 calendar days after the work is completed. Government personnel shall review the as-constructed drawings to determine whether they are correct and complete. If not, they shall be returned to the contractor for additional updating until they are satisfactory to the government. Final payment shall not be made prior to satisfactory completion.

OFFUTT PROJECT NO: SGBP 08-0045 DEC 2007

TITLE: REPAIR TAXIWAY CIRCUITS A & B

1B - 2

5. RECORD SHOP DRAWINGS/GUARANTEES: Record shop drawings submitted upon completion of the work under this contract shall be suitably bound and labeled with project name and number. Include therein a list of all equipment items specified to be guaranteed or which have separate manufacturer's guarantees accompanied by a copy of each specific guarantee and the name, address and telephone number for the manufacturer, supplier/distributor and installer.

6. TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY DD FORM 1354: The contractor shall accurately complete and provide a DD Form1354 current edition for the project. A draft copy shall be submitted for review 30 days prior to project completion. After review, a copy will be returned to the contractor to incorporate any comments and to produce the Interim 1354. The Interim

1354 must be complete to schedule the final inspection and the Government shall receive a copy at the conclusion of the final inspection. The contractor has 30 days after the final inspection to complete the final 1354 and submit it to the government. He shall do this both electronically and in hard copy. The

DD Form 1354 is a form to document quantities and transfer military real property from contractor control to the government control. The 55CES/CEC Project Manager can provide a sample of a previously completed form upon request.

7. CONTRACTOR PROVIDED SPECIFICATIONS: In the event that there is a disagreement regarding referenced specifications (such as by ASTM, AWWA, AASHTO, NSF, ANSI, UBC, etc.) it shall be the responsibility of the contractor to purchase and submit copies of the specifications over which there is disagreement.

8. CONTRACTOR PROVIDED DOCUMENTS for LBP AND ASBESTOS: Contractor will be required to submit all relative documents for corrective action when Lead Base Paint or Asbestos is scheduled to be removed from the respective project.