Bidders Checklist.doc

DOC document 29 KB Posted

Attached to
RECOVERY - SGBP080045 - Repair Txy Lights A & B
Solicitation number
FA4600-09-B-0008
Issued by

About this file

Bidders' Checklist

View the file

Other files

File Type Posted
Taxiway Lights QA.doc DOC document
FA4600-09-B-0008-0003 Amendment to Change Wage Determination.doc DOC document
Wage Rate Attachment Heavy and Highway.doc DOC document
Taxiway Lights QA.doc DOC document
FA4600-09-B-0008-0002 Amendment to Extend Bid Opening Date.doc DOC document
Taxiway Site Visit Information.doc DOC document
FA4600-09-B-0008-0001 Amendment to Change Site Visit Date.doc DOC document
TOC Final.pdf PDF
16511 Final Airfield Lighting.pdf PDF
100 Spec Cover.pdf PDF
Sheet 3.dwf DWF file
Seal Page Repair Taxiway.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 8.dwf DWF file
Sheet 10.dwf DWF file
NCIC.doc DOC document
Sheet 7.dwf DWF file
01732 Final Selective Demolition.pdf PDF
16110 Final Raceways.pdf PDF
02920 Final Lawns and Grasses.pdf PDF
16452 Final Grounding.pdf PDF
02741 Final Asphalt Paving.pdf PDF
16195 Final Electrical Identification.pdf PDF
Sheet 9.dwf DWF file
02584 Final Underground Ducts and Utility Structures.pdf PDF
Sheet 5.dwf DWF file
Sheet 6.dwf DWF file
Wage Rate Attachment.doc DOC document
FA4600-09-B-0008.doc DOC document
Sheet 2.dwf DWF file
Section 1A Master Copy June 2008.pdf PDF
Sheet 4.dwf DWF file
03301 Final Miscellaneous Cast-In-Place Concrete.pdf PDF
Section 1B Master Copy Dec 2007.pdf PDF
Sheet 1.dwf DWF file
02300 Final Earthwork.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA4600-09-B-0008

BIDDERS’ CHECKLIST

The following is a list of actions that should be used to preclude irregularities. Offerors are encouraged to use this checklist when preparing their solicitation package.

_________ Have blocks 14, 15, 16, 17, 19, 21a, 21b, 21c of the SF 1442 been completed?

_________ Has the bid schedule been completed? Did you include a paper copy and an electronic copy with your offer?

_________ Are decimal points in the proper place?

_________ Have you checked the unit prices, extended prices and total price?

_________ Have all amendments (if any have been issued) to the IFB been acknowledged by completing blocks 8 & 15 of the SF 30 (amendment) and returning it with your offer?

_________Have you completed online representations and certifications via ORCA at www.bpn.gov?

_________ Are you registered with the Central Contractor Register (CCR) located at www.bpn.gov? Is your registration current? To include the applicable NAICS 238990 _________ Did you provide the information required under Solicitation Section L, entitled “Preparation of Bids-Construction”?

THIS LIST MAY NOT BE ALL-INCLUSIVE. IT IS THE OFFERORS’ RESPONSIBILITY THAT THEY COMPLETE AND PROVIDE ALL REQUIRED INFORMATION/DOCUMENTATION WITH THEIR OFFER. FAILURE TO PROVIDE ALL REQUIRED INFORMATION MAY RESULT IN THE OFFER BEING CONSIDERED NON-RESPONSIVE, RECEIVING A NEUTRAL RATING, OR EXCLUSION FROM THE COMPETITIVE RANGE.

File details come from the government source that posted it. Updated .