2. Bid Schedule - FY26 Airfield Preventative Maintenance.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- FY26 Airfield Pavement Preventative Maintenance
- Solicitation number
- FA449726R0003
About this file
This document is a Bid Schedule Excel spreadsheet for the FY26 Airfield Preventative Maintenance project at Dover Air Force Base. The spreadsheet is a detailed cost estimation tool using Construction Specifications Institute (CSI) format, requiring contractors to complete cost estimates across multiple divisions, with flexibility to add or modify line items. Key project details include a small business set-aside contract with a project magnitude between $250,000 and $500,000, a 365-calendar day performance period, and a Firm Fixed Price (FFP) contract type.
The bid schedule focuses on exterior improvements, specifically airfield pavement maintenance activities such as removing existing asphalt, saw cutting, spall repair, joint sealing, crack sealing, and bituminous concrete pavement work. Contractors must complete the spreadsheet's "Fill Here" sections, including overhead, profit, and risk/bonding percentages. The solicitation, issued by the Department of the Air Force Air Mobility Command, requires proposal submission by 1:00pm EST on January 16, 2026, with proposals remaining valid through March 31, 2026. Point of contact is Sgt Mariah Thompson, with the NAICS code 237310 and a size standard of $45,000,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.
The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
* CSI = Construction Specifications Institute
&"Verdana,Bold"Construction Cost Estimate
&P of &N
Summary
| Bid Schedule | |
| 6-Aug-24 | |
| COMPANY | |
| 436th Civil Engineering |
| PROJECT | ||||
| FY26 Airfield Preventative Maintenance | ||||
| LOCATION | PROJECT NO. | FJXT 220014 | ||
| DOVER AIR FORCE BASE, DE | ||||
| DIVISION | DESCRIPTION | % by | ||
| Division | Division Total |
| DIVISION 1 | General Requirements | ERROR:#DIV/0! | $0.00 | |
| DIVISION 32 | Exterior Improvements | ERROR:#DIV/0! | $0.00 | |
| FILL IN AS REQUIRED (this will link to the entire document) |
davisjam: davisjam:
Percentages listed are place fillers. Please complete as required
| GC Overhead |
| GC Profit |
| Risk/Bonding |
| Design |
| This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas |
| 2 |
| 2 |
Select Area Cost Factor Type:
| DIVISION 36 | RESERVED |
| DIVISION 37 | RESERVED |
| DIVISION 38 | RESERVED |
| DIVISION 39 | RESERVED |
| DIVISION 46 | RESERVED |
| DIVISION 47 | RESERVED |
HARD COST TOTAL ERROR:#DIV/0! $0.00
| PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | $0.00 |
| SUBTOTAL | $0.00 | |
| 0 | $0.00 | |
| SUBTOTAL | $0.00 | |
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0.0% | $0.00 |
| CONTRACT TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Sustainment Repair/Const ACF Already Factored
Div1
| Bid Schedule | DATE | |||
| July 29, 2025 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY26 Airfield Preventative Maintenance | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT 220014 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | EQUIPMENT | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| Site Superintendent | HR | - 0 | - 0 | - 0 | |||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | ||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| - 0 | |||||||
| - 0 | |||||||
| - 0 | |||||||
| TOTAL | $ - 0 |
&"Verdana,Bold"Construction Cost Estimate
Div32
| Bid Schedule | DATE | |||
| July 29, 2025 | ||||
| PROJECT | BASIS FOR ESTIMATE | |||
| FY26 Airfield Preventative Maintenance | CODE A (No design completed) | |||
| LOCATION | CODE B (Preliminary design) | |||
| DOVER AIR FORCE BASE, DE | CODE C (Final design) | |||
| COMPANY | PROJECT NO. | OTHER (Specify) | ||
| 436th Civil Engineering | FJXT 210077 | |||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| Remove Existing Asphalt, Full Depth | 100 | SY-IN | $0.00 | $0.00 | |||
| Saw Cutting, Asphalt Pavement | 200 | LF-IN | $0.00 | $0.00 | |||
| Spall Repair, Concrete | 1000 | SF-IN | $0.00 | $0.00 | $0.00 | ||
| Preformed Elastomeric Joint Seal | 4116 | LF | $0.00 | $0.00 | $0.00 | ||
| Crack Sealing Bituminous Pavement | 30000 | LF | $0.00 | $0.00 | $0.00 | ||
| Bituminous Concrete Pavement | 5 | TN | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |
| TOTAL LABOR/MATERIALS | $0.00 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| TOTAL | $0.00 |
&"Verdana,Bold"Construction Cost Estimate
File details come from the government source that posted it. Updated .