Performance Requirements--Attch 8.pdf
PDF 12 KB Posted
- Attached to
- Asbestos Abatement Requirements Contract Federal contract opportunity
- Solicitation number
- FA4497-11-R-0009
About this file
Performance Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WAGEBUILDING 1 Jul 2011.pdf | ||
| Amendment 001 FA4497-11-R-0009.pdf | ||
| SampleQuestionnaireLtr Attch 6.pdf | ||
| Monthly Mean No of Days Precip--Attch 3.pdf | ||
| Mandatory Verification Schedule--Attch 5.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE Attch 7.pdf | ||
| Climatic Data--Attch 2.pdf | ||
| Specifications Asbestos Abatement.pdf | ||
| Submittal Schedule--Attch 4.pdf | ||
| WAGEBUILDING 8 Apr 2011 attch1.pdf | ||
| FA4497-11-R-0009 ASBESTOS.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. FA4497-11-R-0009
CONTRACT NO.
Attachment 8
PERFORMANCE REQUIREMENTS
PROJECT NUMBER: 101038
3 Feb 2010
1. The drawings are not provided with solicitation, but will be provided with each delivery order issued.
The drawings indicate the construction areas. The work area numbers are designations only and do not imply any specific sequence for the performance of the work.
2. The Government reserves the right to issue as many requests as it requires. The Government also reserves the right to reschedule delivery orders based on changing requirements or priorities of the Government.
3. Power outages and unlimited utility interruptions for hookups will be permitted in accordance with a previously arranged schedule. The Contractor is responsible for notifying and coordinating all outages with the Civil Engineering Squadron, Environmental Flight at least five (5) working days in advance of the intended outage.
4. The number of work days required to complete a facility under a given delivery orders will be negotiated. The quantities of asbestos containing materials (ACM) to be removed and disposed of and the methods used to remove these materials will be determined by the Government and will form the basis of computing the number of work days.
TOTAL ALLOWABLE PERFORMANCE
DOLLAR VALUE OF DELIVERY ORDER PERIOD OF PERFORMANCE
$1 $2,500 5 Calendar Days $2,501 $5,000 10 Calendar Days $5,001 $50, 000 15 Calendar Days $50,001 $100,000 30 Calendar Days $100,001 $250,000 60 Calendar Days $250,001 $500,000 90 Calendar Days $500,001 $750,000 120 Calendar Days $750,001 $1Million 150 Calendar Days