FA4497-11-R-0009 ASBESTOS.pdf
PDF 1 MB Posted
- Attached to
- Asbestos Abatement Requirements Contract Federal contract opportunity
- Solicitation number
- FA4497-11-R-0009
About this file
FA4497-11-R-0009 Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WAGEBUILDING 1 Jul 2011.pdf | ||
| Amendment 001 FA4497-11-R-0009.pdf | ||
| SampleQuestionnaireLtr Attch 6.pdf | ||
| Monthly Mean No of Days Precip--Attch 3.pdf | ||
| Mandatory Verification Schedule--Attch 5.pdf | ||
| Performance Requirements--Attch 8.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE Attch 7.pdf | ||
| Climatic Data--Attch 2.pdf | ||
| Specifications Asbestos Abatement.pdf | ||
| Submittal Schedule--Attch 4.pdf | ||
| WAGEBUILDING 8 Apr 2011 attch1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS TO PROSPECTIVE OFFERORS
1. Attached is Request for Proposal FA4497-11-R-0009
2. The following items represent the "Proposal Package" that should be returned in response to this solicitation:
PART I - PRICE PROPOSAL:
(a) SF 1442, Solicitation, Offer, and Award
(b) The Schedule, Section B
(c) RFP Sections G and I (If applicable for fill ins), Section K in its entirety
(d) SF 30, Amendment of Solicitation/Modification of Contract (applicable if amendments are not acknowledged on reverse of SF 1442)
PART II - PAST PERFORMANCE INFORMATION:
(a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years
(b) Past Performance Surveys (Furnish the following information for each contract referenced):
(i) Company/Division name
(ii) Product/Service
(iii) Contracting Agency/Customer
(iv) Contract Number
(v) Contract Dollar Value
(vi) Period of Performance
(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer
(viii) Comments regarding compliance with contract terms and conditions
(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.
3.
Affixing Contractor’s Signature:
a. Individuals. A contract with an individual shall be signed by that individual. A contract with an individual doing business as a firm shall be signed by that individual, and the signature shall be followed by the individual’s typed, stamped, or printed name and the words, “ an individual doing business as _____________________________________ ” (insert name of firm).
b. Partnerships. A contract with a partnership shall be signed in the partnership name. Before signing for the Government, the Contracting Officer shall obtain a list of all partners and ensure that the individual(s) signing for the partnership have authority to bind the partnership.
c. Corporations. A contract with a corporation shall be signed in the corporate name, followed by the word “by” and the signature and title of the person authorized to sign. The Contracting Officer shall ensure that the person signing for the corporation has authority to bind the corporation.
d. Joint Ventures. A contract with joint ventures may involve any combination of individuals, partnerships, or corporations. The contract shall be signed by each participant in the joint venture in the manner prescribed in paragraphs (a) through (c) above for each type of participant. When a corporation is participating, the contracting officer shall obtain from the corporation secretary a certificate stating the corporation is authorized to participate in the joint venture.
e. Agents. When an agent is to sign the contract, other than as stated in paragraphs (a) through
(d) above, the agent’s authorization to bind the principal must be established by evidence satisfactory to the Contracting Officer.
4. Scheduled Site Visits: See Section L FAR Clause 52.236-27 Site Visit (Construction) and Section I FAR Clause 52.236-3 Site Investigations and Conditions.
F1Q3CV1069A001
THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
(Title, identifying no., date):
a. This solicitation will result in a firm fixed price contract. Only one award will be made as a result of this solicitation.
b. Prime contractor(s) must be certified to perform asbestos abatement in the State of Delaware. Proof of Certification is required with the propsal.
c. The resultant cotract will consist of an initial contract period and four 12-month option periods that may be exercised by the government.
d. This acquisition is a small business set-aside.
e. Enter prices in Section B using a typewritter or print legibly using black ink.
f. The Notice to Proceed will be as stated in the individual delivery orders written against the basic contract (see section H, paragraph H-006 entitled Notice to Proceed).
g. See Section L, FAR 52.236-27 entitled "Site Visit (Construction)" for details and requirements.
h. Electronic or facsmile proposal submissions are not authorized. Mail or Hand deliver only.
i. NAICS 562910 Size Standard
SEQUOYAH GUINN 302-677-5214
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Jun-2011
(RFP)
(IFB)
X
CALL:
Asbestos Abatement
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 01 Aug 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
436 CONTRACTING SQUADRON
BLDG 639 ATLANTIC ST
DOVER AFB DE 19902-5639
FA4497
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
FJXT101038
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
FA4497-11-R-0009 190
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4497-11-R-0009
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Asbestos Abatement Base
FFP
BASE PERIOD 1 Sep 2011 or DATE of Award - 31 May 2012 FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 500 Square Foot
Removal of steel or wood stud walls
FFP
Removal of steel or wood stud walls FOB: Destination
MILSTRIP: F1Q3CV1069A001
PURCHASE REQUEST NUMBER: F1Q3CV1069A001
SIGNAL CODE: A
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB 25,000 Square
Removal of gypsum board materials
Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 5,000 Square
Removal of Non-Asbestos Carpet
Removal of Non-Asbestos Carpet FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 2,000 Square
Removal of non-asbestos flooring
Removal of non-asbestos flooring FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 7,000 Square
Removal of asbestos containing mastic
Removal of asbestos containing mastic FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AF 10,000 Square
Removal of Vinyl asbestos floor tile
Removal of Vinyl asbestos floor tile FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AG 5,000 Square
Removal of additional layer of vinyl
Removal of additional layer of vinyl asbestos floor tile FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AH 500 Square
Removal of Asbestos Sheet Flooring
Removal of Asbestos Sheet Flooring FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AJ 20 Each Removal of non asbestos bathroom fixture
FFP
Removal of non asbestos bathroom fixtures when abatement required FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AK 500 Square
Removal of asbestos containing suspended
Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AL 1,500 Linear
Removal of asbestos pipe and fitting ins
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AM 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AN 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AP 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AQ 250 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,
3.5 inch pipes or less FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AR 100 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AS 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AT 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AU 250 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AV 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AW 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AX 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AY 100 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AZ 50 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BA 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BB 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BC 25 Square
Removal of insulation from equipment or
Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BD 10 Square
Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BE 100 Square
Removal of asbestos cement panels (trans
Removal of asbestos cement panels (transite) FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BF 200 Square
Removal of asbestos shingles from roofin
Removal of asbestos shingles from roofing FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BG 2,000 Square
Removal of asbestos containing built up
Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BH 250 Square
Removal of acoustic tile and asbestos ma
Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BJ 50 Each Removal of asbestos containing gaskets f
FFP
Removal of asbestos containing gaskets from mechanical rooms FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BK 500 Cubic Feet
Removal of asbestos contaminated soil in
Removal of asbestos contaminated soil in open areas FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BL 500 Cubic
Removal of asbestos contaminated soil in confined spaces FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BM 5 Each Removal of asbestos containing doors fro
FFP
Removal of asbestos containing doors from the building FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BN 5 Each Removal of window systems from building
FFP
Removal of window systems from building to include glazing and caulking FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BP 1,000 Square
Decontamination of all interior surfaces
Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BQ 250 Square
Decontamination of interior goods and pr
Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BR 500 Cubic
Removal of asbestos contaiminated debris
Removal of asbestos contaiminated debris FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BS 750 Square
Removal of non asbestos cinder block wal
Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BT 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BU 50 Linear
Removal of asbestos containing duct expa
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BV 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BW 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BX 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BY 500 Linear
Removal of asbestos containing cement wa
Removal of asbestos containing cement water pipe.
FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BZ 5 Each 4 hour respone to asbestos abatement eme
FFP
4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination
MILSTRIP: F1Q3CV1069A001
Asbestos Abatement Base
FFP
Option Year 1 1 Jun 2012- 31 May 2013
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AA 500 Square
Removal of steel or wood stud walls FOB: Destination
MILSTRIP: F1Q3CV1069A001
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AB 25,000 Square
Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AC 5,000 Square
Removal of Non-Asbestos Carpet FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AD 2,000 Square
Removal of non-asbestos flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AE 7,000 Square
Removal of asbestos containing mastic FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AF 10,000 Square
Removal of Vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AG 5,000 Square
Removal of additional layer of vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AH 500 Square
Removal of Asbestos Sheet Flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AJ 20 Each Removal of non asbestos bathroom fixture
FFP
Removal of non asbestos bathroom fixtures when abatement required FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AK 500 Square
Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AL 1,500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AM 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AN 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AP 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AQ 250 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,
3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AR 100 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AS 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AT 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AU 250 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AV 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AW 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AX 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AY 100 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AZ 50 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BA 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BB 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BC 25 Square
Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BD 10 Square
Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BE 100 Square
Removal of asbestos cement panels (transite) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BF 200 Square
Removal of asbestos shingles from roofing FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BG 2,000 Square
Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BH 250 Square
Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BJ 50 Each Removal of asbestos containing gaskets f
FFP
Removal of asbestos containing gaskets from mechanical rooms FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BK 500 Cubic
Removal of asbestos contaminated soil in open areas FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BL 500 Cubic
Removal of asbestos contaminated soil in confined spaces FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BM 5 Each Removal of asbestos containing doors fro
FFP
Removal of asbestos containing doors from the building FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BN 5 Each Removal of window systems from building
FFP
Removal of window systems from building to include glazing and caulking FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BP 1,000 Square
Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BQ 250 Square
Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BR 500 Cubic
Removal of asbestos contaiminated debris FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BS 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BT 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BU 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BV 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BW 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BX 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BY 500 Linear
Removal of asbestos containing cement water pipe.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BZ 5 Each 4 hour respone to asbestos abatement eme
FFP
4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination
Asbestos Abatement Base
FFP
Option Year Two 1 June 2013 thur 31 May 2014
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AA 500 Square
Removal of steel or wood stud walls FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AB 25,000 Square
Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AC 5,000 Square
Removal of Non-Asbestos Carpet FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AD 2,000 Square
Removal of non-asbestos flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AE 7,000 Square
Removal of asbestos containing mastic FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AF 10,000 Square
Removal of Vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AG 5,000 Square
Removal of additional layer of vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AH 500 Square
Removal of Asbestos Sheet Flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AJ 20 Each Removal of non asbestos bathroom fixture
FFP
Removal of non asbestos bathroom fixtures when abatement required FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AK 500 Square
Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AL 1,500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AM 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AN 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AP 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AQ 250 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,
3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AR 100 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AS 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AT 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AU 250 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AV 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AW 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AX 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AY 100 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AZ 50 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BA 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BB 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BC 25 Square
Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BD 10 Square
Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BE 100 Square
Removal of asbestos cement panels (transite) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BF 200 Square
Removal of asbestos shingles from roofing FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BG 2,000 Square
Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BH 250 Square
Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BJ 50 Each Removal of asbestos containing gaskets f
FFP
Removal of asbestos containing gaskets from mechanical rooms FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BK 500 Cubic
Removal of asbestos contaminated soil in open areas FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BL 500 Cubic
Removal of asbestos contaminated soil in confined spaces FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BM 5 Each Removal of asbestos containing doors fro
FFP
Removal of asbestos containing doors from the building FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BN 5 Each Removal of window systems from building
FFP
Removal of window systems from building to include glazing and caulking FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BP 1,000 Square
Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BQ 250 Square
Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BR 500 Cubic
Removal of asbestos contaiminated debris FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BS 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BT 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BU 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BV 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BW 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BX 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BY 500 Linear
Removal of asbestos containing cement water pipe.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BZ 5 Each 4 hour respone to asbestos abatement eme
FFP
4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination
Asbestos Abatement Base
FFP
Option Year Three 1 June 2014 thur 31 May 2015
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AA 500 Square
Removal of steel or wood stud walls FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AB 25,000 Square
Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AC 5,000 Square
Removal of Non-Asbestos Carpet FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AD 2,000 Square
Removal of non-asbestos flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AE 7,000 Square
Removal of asbestos containing mastic FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AF 10,000 Square
Removal of Vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AG 5,000 Square
Removal of additional layer of vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AH 500 Square
Removal of Asbestos Sheet Flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AJ 20 Each Removal of non asbestos bathroom fixture
FFP
Removal of non asbestos bathroom fixtures when abatement required FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AK 500 Square
Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AL 1,500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AM 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AN 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AP 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AQ 250 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,
3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AR 100 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AS 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AT 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AU 250 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AV 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AW 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AX 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AY 100 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001AZ 50 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BA 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BB 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BC 25 Square
Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BD 10 Square
Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BE 100 Square
Removal of asbestos cement panels (transite) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BF 200 Square
Removal of asbestos shingles from roofing FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BG 2,000 Square
Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BH 250 Square
Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BJ 50 Each Removal of asbestos containing gaskets f
FFP
Removal of asbestos containing gaskets from mechanical rooms FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BK 500 Cubic
Removal of asbestos contaminated soil in open areas FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BL 500 Cubic
Removal of asbestos contaminated soil in confined spaces FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BM 5 Each Removal of asbestos containing doors fro
FFP
Removal of asbestos containing doors from the building FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BN 5 Each Removal of window systems from building
FFP
Removal of window systems from building to include glazing and caulking FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BP 1,000 Square
Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BQ 250 Square
Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BR 500 Cubic
Removal of asbestos contaiminated debris FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BS 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BT 750 Square
Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BU 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BV 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BW 50 Linear
Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BX 50 Linear
Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BY 500 Linear
Removal of asbestos containing cement water pipe.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
3001BZ 5 Each 4 hour respone to asbestos abatement eme
FFP
4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination
Asbestos Abatement Base
FFP
Option Year Four 1 Jun 2015 thru 31 May 2016
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AA 500 Square
Removal of steel or wood stud walls FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AB 25,000 Square
Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AC 5,000 Square
Removal of Non-Asbestos Carpet FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AD 2,000 Square
Removal of non-asbestos flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AE 7,000 Square
Removal of asbestos containing mastic FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AF 10,000 Square
Removal of Vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AG 5,000 Square
Removal of additional layer of vinyl asbestos floor tile FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AH 500 Square
Removal of Asbestos Sheet Flooring FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AJ 20 Each Removal of non asbestos bathroom fixture
FFP
Removal of non asbestos bathroom fixtures when abatement required FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AK 500 Square
Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AL 1,500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AM 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AN 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AP 500 Linear
Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AQ 250 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,
3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AR 100 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AS 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AT 10 Linear
Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AU 250 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AV 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AW 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AX 50 Linear
Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AY 100 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001AZ 50 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BA 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BB 10 Linear
Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BC 25 Square
Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
4001BD 10 Square
Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination
I
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .