FA4497-11-R-0009 ASBESTOS.pdf

PDF 1 MB Posted

Attached to
Asbestos Abatement Requirements Contract Federal contract opportunity
Solicitation number
FA4497-11-R-0009
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4497-11-R-0009 Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos Abatement Requirements Contract, newest first.
File Type Posted
WAGEBUILDING 1 Jul 2011.pdf PDF
Amendment 001 FA4497-11-R-0009.pdf PDF
SampleQuestionnaireLtr Attch 6.pdf PDF
Monthly Mean No of Days Precip--Attch 3.pdf PDF
Mandatory Verification Schedule--Attch 5.pdf PDF
Performance Requirements--Attch 8.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE Attch 7.pdf PDF
Climatic Data--Attch 2.pdf PDF
Specifications Asbestos Abatement.pdf PDF
Submittal Schedule--Attch 4.pdf PDF
WAGEBUILDING 8 Apr 2011 attch1.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS TO PROSPECTIVE OFFERORS

1. Attached is Request for Proposal FA4497-11-R-0009

2. The following items represent the "Proposal Package" that should be returned in response to this solicitation:

PART I - PRICE PROPOSAL:

(a) SF 1442, Solicitation, Offer, and Award

(b) The Schedule, Section B

(c) RFP Sections G and I (If applicable for fill ins), Section K in its entirety

(d) SF 30, Amendment of Solicitation/Modification of Contract (applicable if amendments are not acknowledged on reverse of SF 1442)

PART II - PAST PERFORMANCE INFORMATION:

(a) Quality and Satisfaction Rating for Contracts Completed in the Past Three Years

(b) Past Performance Surveys (Furnish the following information for each contract referenced):

(i) Company/Division name

(ii) Product/Service

(iii) Contracting Agency/Customer

(iv) Contract Number

(v) Contract Dollar Value

(vi) Period of Performance

(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer

(viii) Comments regarding compliance with contract terms and conditions

(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

3.

Affixing Contractor’s Signature:

a. Individuals. A contract with an individual shall be signed by that individual. A contract with an individual doing business as a firm shall be signed by that individual, and the signature shall be followed by the individual’s typed, stamped, or printed name and the words, “ an individual doing business as _____________________________________ ” (insert name of firm).

b. Partnerships. A contract with a partnership shall be signed in the partnership name. Before signing for the Government, the Contracting Officer shall obtain a list of all partners and ensure that the individual(s) signing for the partnership have authority to bind the partnership.

c. Corporations. A contract with a corporation shall be signed in the corporate name, followed by the word “by” and the signature and title of the person authorized to sign. The Contracting Officer shall ensure that the person signing for the corporation has authority to bind the corporation.

d. Joint Ventures. A contract with joint ventures may involve any combination of individuals, partnerships, or corporations. The contract shall be signed by each participant in the joint venture in the manner prescribed in paragraphs (a) through (c) above for each type of participant. When a corporation is participating, the contracting officer shall obtain from the corporation secretary a certificate stating the corporation is authorized to participate in the joint venture.

e. Agents. When an agent is to sign the contract, other than as stated in paragraphs (a) through

(d) above, the agent’s authorization to bind the principal must be established by evidence satisfactory to the Contracting Officer.

4. Scheduled Site Visits: See Section L FAR Clause 52.236-27 Site Visit (Construction) and Section I FAR Clause 52.236-3 Site Investigations and Conditions.

F1Q3CV1069A001

THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

(Title, identifying no., date):

a. This solicitation will result in a firm fixed price contract. Only one award will be made as a result of this solicitation.

b. Prime contractor(s) must be certified to perform asbestos abatement in the State of Delaware. Proof of Certification is required with the propsal.

c. The resultant cotract will consist of an initial contract period and four 12-month option periods that may be exercised by the government.

d. This acquisition is a small business set-aside.

e. Enter prices in Section B using a typewritter or print legibly using black ink.

f. The Notice to Proceed will be as stated in the individual delivery orders written against the basic contract (see section H, paragraph H-006 entitled Notice to Proceed).

g. See Section L, FAR 52.236-27 entitled "Site Visit (Construction)" for details and requirements.

h. Electronic or facsmile proposal submissions are not authorized. Mail or Hand deliver only.

i. NAICS 562910 Size Standard

SEQUOYAH GUINN 302-677-5214

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30-Jun-2011

(RFP)

(IFB)

X

CALL:

Asbestos Abatement

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ calendar days and complete it within ________ calendar days after receiving award, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________ 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 01 Aug 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

436 CONTRACTING SQUADRON

BLDG 639 ATLANTIC ST

DOVER AFB DE 19902-5639

FA4497

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

04:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

FJXT101038

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

FA4497-11-R-0009 190

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4497-11-R-0009

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Asbestos Abatement Base

FFP

BASE PERIOD 1 Sep 2011 or DATE of Award - 31 May 2012 FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 500 Square Foot

Removal of steel or wood stud walls

FFP

Removal of steel or wood stud walls FOB: Destination

MILSTRIP: F1Q3CV1069A001

PURCHASE REQUEST NUMBER: F1Q3CV1069A001

SIGNAL CODE: A

ESTIMATED

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 25,000 Square

Removal of gypsum board materials

Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 5,000 Square

Removal of Non-Asbestos Carpet

Removal of Non-Asbestos Carpet FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AD 2,000 Square

Removal of non-asbestos flooring

Removal of non-asbestos flooring FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AE 7,000 Square

Removal of asbestos containing mastic

Removal of asbestos containing mastic FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AF 10,000 Square

Removal of Vinyl asbestos floor tile

Removal of Vinyl asbestos floor tile FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AG 5,000 Square

Removal of additional layer of vinyl

Removal of additional layer of vinyl asbestos floor tile FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AH 500 Square

Removal of Asbestos Sheet Flooring

Removal of Asbestos Sheet Flooring FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AJ 20 Each Removal of non asbestos bathroom fixture

FFP

Removal of non asbestos bathroom fixtures when abatement required FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AK 500 Square

Removal of asbestos containing suspended

Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AL 1,500 Linear

Removal of asbestos pipe and fitting ins

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AM 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AN 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AP 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AQ 250 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,

3.5 inch pipes or less FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AR 100 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AS 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AT 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AU 250 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AV 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AW 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AX 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AY 100 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AZ 50 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BA 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BB 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BC 25 Square

Removal of insulation from equipment or

Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BD 10 Square

Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BE 100 Square

Removal of asbestos cement panels (trans

Removal of asbestos cement panels (transite) FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BF 200 Square

Removal of asbestos shingles from roofin

Removal of asbestos shingles from roofing FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BG 2,000 Square

Removal of asbestos containing built up

Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BH 250 Square

Removal of acoustic tile and asbestos ma

Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BJ 50 Each Removal of asbestos containing gaskets f

FFP

Removal of asbestos containing gaskets from mechanical rooms FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BK 500 Cubic Feet

Removal of asbestos contaminated soil in

Removal of asbestos contaminated soil in open areas FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BL 500 Cubic

Removal of asbestos contaminated soil in confined spaces FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BM 5 Each Removal of asbestos containing doors fro

FFP

Removal of asbestos containing doors from the building FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BN 5 Each Removal of window systems from building

FFP

Removal of window systems from building to include glazing and caulking FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BP 1,000 Square

Decontamination of all interior surfaces

Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BQ 250 Square

Decontamination of interior goods and pr

Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BR 500 Cubic

Removal of asbestos contaiminated debris

Removal of asbestos contaiminated debris FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BS 750 Square

Removal of non asbestos cinder block wal

Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BT 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BU 50 Linear

Removal of asbestos containing duct expa

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BV 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BW 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BX 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BY 500 Linear

Removal of asbestos containing cement wa

Removal of asbestos containing cement water pipe.

FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

0001BZ 5 Each 4 hour respone to asbestos abatement eme

FFP

4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination

MILSTRIP: F1Q3CV1069A001

Asbestos Abatement Base

FFP

Option Year 1 1 Jun 2012- 31 May 2013

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AA 500 Square

Removal of steel or wood stud walls FOB: Destination

MILSTRIP: F1Q3CV1069A001

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AB 25,000 Square

Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AC 5,000 Square

Removal of Non-Asbestos Carpet FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AD 2,000 Square

Removal of non-asbestos flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AE 7,000 Square

Removal of asbestos containing mastic FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AF 10,000 Square

Removal of Vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AG 5,000 Square

Removal of additional layer of vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AH 500 Square

Removal of Asbestos Sheet Flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AJ 20 Each Removal of non asbestos bathroom fixture

FFP

Removal of non asbestos bathroom fixtures when abatement required FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AK 500 Square

Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AL 1,500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AM 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AN 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AP 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AQ 250 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,

3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AR 100 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AS 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AT 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AU 250 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AV 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AW 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AX 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AY 100 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AZ 50 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BA 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BB 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BC 25 Square

Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BD 10 Square

Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BE 100 Square

Removal of asbestos cement panels (transite) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BF 200 Square

Removal of asbestos shingles from roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BG 2,000 Square

Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BH 250 Square

Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BJ 50 Each Removal of asbestos containing gaskets f

FFP

Removal of asbestos containing gaskets from mechanical rooms FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BK 500 Cubic

Removal of asbestos contaminated soil in open areas FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BL 500 Cubic

Removal of asbestos contaminated soil in confined spaces FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BM 5 Each Removal of asbestos containing doors fro

FFP

Removal of asbestos containing doors from the building FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BN 5 Each Removal of window systems from building

FFP

Removal of window systems from building to include glazing and caulking FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BP 1,000 Square

Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BQ 250 Square

Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BR 500 Cubic

Removal of asbestos contaiminated debris FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BS 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BT 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BU 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BV 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BW 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BX 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BY 500 Linear

Removal of asbestos containing cement water pipe.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

1001BZ 5 Each 4 hour respone to asbestos abatement eme

FFP

4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination

Asbestos Abatement Base

FFP

Option Year Two 1 June 2013 thur 31 May 2014

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AA 500 Square

Removal of steel or wood stud walls FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AB 25,000 Square

Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AC 5,000 Square

Removal of Non-Asbestos Carpet FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AD 2,000 Square

Removal of non-asbestos flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AE 7,000 Square

Removal of asbestos containing mastic FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AF 10,000 Square

Removal of Vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AG 5,000 Square

Removal of additional layer of vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AH 500 Square

Removal of Asbestos Sheet Flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AJ 20 Each Removal of non asbestos bathroom fixture

FFP

Removal of non asbestos bathroom fixtures when abatement required FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AK 500 Square

Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AL 1,500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AM 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AN 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AP 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AQ 250 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,

3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AR 100 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AS 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AT 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AU 250 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AV 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AW 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AX 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AY 100 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AZ 50 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BA 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BB 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BC 25 Square

Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BD 10 Square

Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BE 100 Square

Removal of asbestos cement panels (transite) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BF 200 Square

Removal of asbestos shingles from roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BG 2,000 Square

Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BH 250 Square

Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BJ 50 Each Removal of asbestos containing gaskets f

FFP

Removal of asbestos containing gaskets from mechanical rooms FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BK 500 Cubic

Removal of asbestos contaminated soil in open areas FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BL 500 Cubic

Removal of asbestos contaminated soil in confined spaces FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BM 5 Each Removal of asbestos containing doors fro

FFP

Removal of asbestos containing doors from the building FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BN 5 Each Removal of window systems from building

FFP

Removal of window systems from building to include glazing and caulking FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BP 1,000 Square

Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BQ 250 Square

Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BR 500 Cubic

Removal of asbestos contaiminated debris FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BS 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BT 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BU 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BV 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BW 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BX 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BY 500 Linear

Removal of asbestos containing cement water pipe.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

2001BZ 5 Each 4 hour respone to asbestos abatement eme

FFP

4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination

Asbestos Abatement Base

FFP

Option Year Three 1 June 2014 thur 31 May 2015

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AA 500 Square

Removal of steel or wood stud walls FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AB 25,000 Square

Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AC 5,000 Square

Removal of Non-Asbestos Carpet FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AD 2,000 Square

Removal of non-asbestos flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AE 7,000 Square

Removal of asbestos containing mastic FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AF 10,000 Square

Removal of Vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AG 5,000 Square

Removal of additional layer of vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AH 500 Square

Removal of Asbestos Sheet Flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AJ 20 Each Removal of non asbestos bathroom fixture

FFP

Removal of non asbestos bathroom fixtures when abatement required FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AK 500 Square

Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AL 1,500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AM 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AN 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AP 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AQ 250 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,

3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AR 100 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AS 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AT 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AU 250 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AV 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AW 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AX 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AY 100 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001AZ 50 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BA 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BB 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BC 25 Square

Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BD 10 Square

Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BE 100 Square

Removal of asbestos cement panels (transite) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BF 200 Square

Removal of asbestos shingles from roofing FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BG 2,000 Square

Removal of asbestos containing built up roofing from deck to include flashing, tar and coatings FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BH 250 Square

Removal of acoustic tile and asbestos mastic from ceiling and wall and other mastic applications FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BJ 50 Each Removal of asbestos containing gaskets f

FFP

Removal of asbestos containing gaskets from mechanical rooms FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BK 500 Cubic

Removal of asbestos contaminated soil in open areas FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BL 500 Cubic

Removal of asbestos contaminated soil in confined spaces FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BM 5 Each Removal of asbestos containing doors fro

FFP

Removal of asbestos containing doors from the building FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BN 5 Each Removal of window systems from building

FFP

Removal of window systems from building to include glazing and caulking FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BP 1,000 Square

Decontamination of all interior surfaces using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BQ 250 Square

Decontamination of interior goods and products using HEPA vacuum and wet wiping methods FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BR 500 Cubic

Removal of asbestos contaiminated debris FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BS 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 4 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BT 750 Square

Removal of non asbestos cinder block wall to access asbestos material, 8 inch wall FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BU 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) up to 25' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BV 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) up to 25' above the floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BW 50 Linear

Removal of asbestos containing duct expansion joints from ducts (0 to 36 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BX 50 Linear

Removal of asbestos containing duct expansion joints from ducts (36 to 72 inches) from 25' to 75' above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BY 500 Linear

Removal of asbestos containing cement water pipe.

FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

3001BZ 5 Each 4 hour respone to asbestos abatement eme

FFP

4 hour respone to asbestos abatement emergency request (mobilization costs) FOB: Destination

Asbestos Abatement Base

FFP

Option Year Four 1 Jun 2015 thru 31 May 2016

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AA 500 Square

Removal of steel or wood stud walls FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AB 25,000 Square

Removal of gypsum board materials from wall and ceiling including asbestos containing joint compound FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AC 5,000 Square

Removal of Non-Asbestos Carpet FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AD 2,000 Square

Removal of non-asbestos flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AE 7,000 Square

Removal of asbestos containing mastic FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AF 10,000 Square

Removal of Vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AG 5,000 Square

Removal of additional layer of vinyl asbestos floor tile FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AH 500 Square

Removal of Asbestos Sheet Flooring FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AJ 20 Each Removal of non asbestos bathroom fixture

FFP

Removal of non asbestos bathroom fixtures when abatement required FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AK 500 Square

Removal of asbestos containing suspended ceilings (drop lay in panel spine) FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AL 1,500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AM 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 4 to 8 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AN 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AP 500 Linear

Removal of asbestos pipe and fitting insulation up to 15 feet above floor (enclosure) for 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AQ 250 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor,

3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AR 100 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15" above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AS 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AT 10 Linear

Removal of asbestos pipe and fitting insulation by glove bag up to 15' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AU 250 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AV 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AW 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15" to 75" above floor (enclosure), 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AX 50 Linear

Removal of asbestos pipe and fitting insulation for pipes 15' to 75' above floor (enclosure) 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AY 100 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 3.5 inch pipes or less FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001AZ 50 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 4 to 8 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001BA 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 9 to 12 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001BB 10 Linear

Removal of asbestos pipe and fitting insulation by glovebag for pipes 15' to 75' above floor, 13 to 18 inch pipes FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001BC 25 Square

Removal of insulation from equipment or pipes greater than 18" diameter and up to 15 feet above floor FOB: Destination

UNIT UNIT PRICE ESTIMATED AMOUNT

4001BD 10 Square

Removal of insulation from equipment or pipes greater than 18" diameters and 15 to 75 feet above floor FOB: Destination

I

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .