Mandatory Verification Schedule--Attch 5.pdf
PDF 10 KB Posted
- Attached to
- Asbestos Abatement Requirements Contract Federal contract opportunity
- Solicitation number
- FA4497-11-R-0009
About this file
Mandatory Verification Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WAGEBUILDING 1 Jul 2011.pdf | ||
| Amendment 001 FA4497-11-R-0009.pdf | ||
| SampleQuestionnaireLtr Attch 6.pdf | ||
| Performance Requirements--Attch 8.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE Attch 7.pdf | ||
| Monthly Mean No of Days Precip--Attch 3.pdf | ||
| Climatic Data--Attch 2.pdf | ||
| Specifications Asbestos Abatement.pdf | ||
| Submittal Schedule--Attch 4.pdf | ||
| WAGEBUILDING 8 Apr 2011 attch1.pdf | ||
| FA4497-11-R-0009 ASBESTOS.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. FA4497-11-R-0009
CONTRACT NO.
Attachment 5
MANDATORY VERIFICATION SCHEDULE
PROJECT NUMBER: 101038
3 Feb 10
The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor's inspection program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification according to the schedule below:
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED
INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION
COMPLETED
Requirement to Specs 02080 5 work days Shut down utilities
Start of asbestos Abatement Specs 02080 10 work days