Material Sub_UW Statue.xls

XLS spreadsheet 31 KB Posted

Attached to
Refurbish Ultimate Warrior Statue Joint Base McGuire-Dix-Lakehurst
Solicitation number
FA448424Q0046
Issued by

About this file

This is a material submittal schedule spreadsheet for the refurbishment of the Ultimate Warrior Statue at Building 5483. The form outlines required contractor submissions including conservation credentials, insurance coverage documentation, paint specifications, and structural repair material details. Each item requires specific types of submittals such as certifications of compliance, shop drawings, samples, or manufacturer recommendations.

The associated solicitation (FA448424Q0046) from the Department of the Air Force Air Mobility Command outlines a 120-day performance period for moving, refurbishing, and replacing the statue at Joint Base McGuire-Dix-Lakehurst, NJ. This is a small business set-aside under NAICS 238990 ($19M size standard). A site visit is scheduled for February 18, 2025, at 10:00 EST at Building 5418, with required visitor information due by February 13, 2025. Questions are due by February 21, 2025, at 12:00 PM EST. The contract will be awarded using lowest price technically acceptable evaluation criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSBldg 5483, Ultimate Warrior StatueRefurbish Ultimate Warrior StatueSOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEERS RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Conservation Credentialsx
2Insurance Coveragex
3Paintxx
4Structural Repair Materialxx
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Sheet2

Sheet3

File details come from the government source that posted it. Updated .