SF_30_Amendment.docx
DOCX document 32 KB Posted
- Attached to
- ROLL UP DOOR INSTALLATION
- Solicitation number
- FA4484-16-R-0037
About this file
SF 30 Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roll_Up_Doors_Q A.docx | DOCX document | |
| J1-Wage_Determination.pdf | ||
| J3-Past_Performance.pdf | ||
| J5-Construction_Cost_Breakdown_Template.xls | XLS spreadsheet | |
| J2-Submittal_Schedule.xlsx | XLSX spreadsheet | |
| SF_1442_Solicitation.docx | DOCX document | |
| J4-Security_Forces_Appendix.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4484-16-R-0037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Sep-2016 02:00 PM to 16-Sep-2016 02:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK
FOR
ALTERATIONS TO BUILDING 3210 AND 1809
AT
McGUIRE AFB, JOINT BASE M-D-L, NEW JERSEY
DESCRIPTION OF SERVICES.
Building 1809
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to procure and install a new roll-up door at Building 1809 at McGuire Air Force Base, Joint Base M-D-L, New Jersey, as directed by the Contracting Officer’s Representative (COR).
The alterations to this area shall include, but may not be limited to: Removal of the existing accordion door and the existing accordion door hardware, including guiderails, motor, and other associated equipment, and; Installation of a new motorized roll-up door and roll-up door hardware, sized to effectively close the vacated clear opening, 14.0 feet high, 12.0 feet wide. Door hardware shall include motorized and manual operation capability, guide rails, door-bottom safety-sensing and travel-limiting devices, a 3-position (up, down, stop) wall-mounted operating switch, wiring, and other materials as required for a complete installation, in order to provide a functional roll-up door. The new roll-up door shall be Bronze color, PPG #5MN53079. All removed materials shall become the property of the Contractor, and shall be disposed of off-Base.
Building 3210
The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to procure and install a motorized roll-up door by increasing the existing clear opening from 20 ft-2 in. wide x 11-ft-4-in. high, to a clear opening 20 ft-2 in. wide x approximately18-ft high. The exact location will be as directed by the Contracting Officer’s Representative (COR).
The alterations to this area shall include, but may not be limited to: Removal of the existing roll-up door, and the existing roll-up door hardware, including guiderails, electrical and manual controls, and other associated equipment and hardware; Make alterations to Building 3210 structure as required, to provide a 20 ft-2 in. wide x approximately18-ft high clear opening; Install the new motorized roll-up door, including motor operator, guide rails, manual operation capability, safety devices, controls, switches, wiring, and other materials as required for a complete installation, in order to provide a functional, approximately 18-foot high, roll-up door. The roll-up door shall have a Tudor Brown color, powder-coated finish; Replace or alter the vertical metal components adjacent to the clear opening, up to the approximately 18-foot height; Remove, and replace or relocate above the new clear opening, the horizontal metal components above the existing roll-up door, and; Restore the building exterior and interior wall surfaces adjacent to the new door, to match the surrounding walls, so as to provide a finished and presentable appearance.
Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired or restored by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off-Base by the contractor. The contractor or his Contractor Quality Control (CQC) representative shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
SPECIAL REQUIREMENTS. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.
SITE VISIT. A site visit was conducted on 6 September 2016 at 1:30 PM EST.
SUBMITTALS. The Contractor shall provide specifications and other relevant information on the roll-up door to be installed to the Contracting Officer for approval. See attached register and complete an AF3000 submittal register with the materials.
POINTS OF CONTACT:
Contracting Specialist: TSgt Bo Im, 609-754-5146, bo.im@us.af.mil Contracting Officer: Melody Ciulo, 609-754-4951, melody.ciulo@us.af.mil
Please copy POC’s listed with all correspondences
The Contractor Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours, 7:30am to 4:15pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Personnel (QAP) with phone number for contacting purposes.
BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into McGuire Air Force Base and Fort Dix for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the Base. Base passes can be obtained at the Visitor’s Center, located at the Main Gate, just off of Wrightstown / Cookstown Rd. The commercial vehicle entry point is at Gate 9, Fort Dix, on Saylors Pond Road (State Road 670), Wrightstown, NJ.
SECURITY FORCE AND FIRE PROTECTION: The Base Security Police telephone number is 609-754-2001 and the Base Fire Department telephone number is 911 for reporting a fire. General information telephone number is 609-754-3326.
PERFORMANCE PERIOD: All work shall be completed within a forty-five (45) calendar day period upon the start of the project excluding holidays after notice to proceed. Contractor shall coordinate all dates of work with all Government POC’s prior to starting.
INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: A final inspection will be scheduled upon completion of all work. Contact the Quality Assurance Evaluator one (1) day prior to completion for a site visit.
END OF STATEMENT OF WORK