J2-Submittal_Schedule.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
ROLL UP DOOR INSTALLATION
Solicitation number
FA4484-16-R-0037
Issued by

About this file

J2-Submittal Schedule

View the file

Other files

File Type Posted
Roll_Up_Doors_Q A.docx DOCX document
SF_30_Amendment.docx DOCX document
J4-Security_Forces_Appendix.PDF PDF
J5-Construction_Cost_Breakdown_Template.xls XLS spreadsheet
SF_1442_Solicitation.docx DOCX document
J1-Wage_Determination.pdf PDF
J3-Past_Performance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B1809 SCHEDULE OF MATERIAL SUBMITTALS WO 46383, Bldg 1809 Replace accordian door with new roll-up door. SOLICITATION/CONTRACT NUMBER FA4484-

TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEERS RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1New Roll-up Door (Approx. 12.5' x 14.5')XXXXX10 days after AWD

6 Dielectric Unions X X 10 days after AWD

SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEERS RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED

B3210 SCHEDULE OF MATERIAL SUBMITTALS WO 46095 Bldg. 3210 Replace Roll-up Door with a Larger One. SOLICITATION/CONTRACT NUMBER FA4484-

TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEERS RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Roll-up DoorXXXXX10 days after AWD
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required)TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN

CONTRACTING DATE TO

CIVIL

ENGINEERS RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIEDCONTRACTOR
RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED