J2-Submittal_Schedule.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- ROLL UP DOOR INSTALLATION
- Solicitation number
- FA4484-16-R-0037
About this file
J2-Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roll_Up_Doors_Q A.docx | DOCX document | |
| SF_30_Amendment.docx | DOCX document | |
| J4-Security_Forces_Appendix.PDF | ||
| J5-Construction_Cost_Breakdown_Template.xls | XLS spreadsheet | |
| SF_1442_Solicitation.docx | DOCX document | |
| J1-Wage_Determination.pdf | ||
| J3-Past_Performance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1809 SCHEDULE OF MATERIAL SUBMITTALS WO 46383, Bldg 1809 Replace accordian door with new roll-up door. SOLICITATION/CONTRACT NUMBER FA4484-
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||||||||
| RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | |||||||||
| APPROVED | DISAPPROVED | |||||||||
| 1 | New Roll-up Door (Approx. 12.5' x 14.5') | X | X | X | X | X | 10 days after AWD |
6 Dielectric Unions X X 10 days after AWD
| SCHEDULE OF MATERIAL SUBMITTALS | ||
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | |||
| APPROVED | DISAPPROVED |
B3210 SCHEDULE OF MATERIAL SUBMITTALS WO 46095 Bldg. 3210 Replace Roll-up Door with a Larger One. SOLICITATION/CONTRACT NUMBER FA4484-
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||||||||
| RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | |||||||||
| APPROVED | DISAPPROVED | |||||||||
| 1 | Roll-up Door | X | X | X | X | X | 10 days after AWD |
| SCHEDULE OF MATERIAL SUBMITTALS | ||
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||
| RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | |||
| APPROVED | DISAPPROVED |