J5-Construction_Cost_Breakdown_Template.xls

XLS spreadsheet 55 KB Posted

Attached to
ROLL UP DOOR INSTALLATION
Solicitation number
FA4484-16-R-0037
Issued by

About this file

J5-Construction Cost Breakdown Template

View the file

Other files

File Type Posted
Roll_Up_Doors_Q A.docx DOCX document
SF_30_Amendment.docx DOCX document
J4-Security_Forces_Appendix.PDF PDF
J2-Submittal_Schedule.xlsx XLSX spreadsheet
SF_1442_Solicitation.docx DOCX document
J1-Wage_Determination.pdf PDF
J3-Past_Performance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Contract

CONSTRUCTION PROPOSAL BREAK DOWNDATEInstructions: Fill in everything in RED
ADD as many CSI Divisions as Required - Tailor the form as needed to add lines,etc.
PROJECTBASIS FOR PROPOSALNOTE: Overhead rates include labor burden. Labor hourly rates should be unburdened.
Install Fire Alarm DevicePut in the proposed O/H and profit rates; this is just an example.
LOCATIONNOTE: This project does not require bonding!
B5359/5360 JBMDL, Fort Dix, NJ
COMPANYRFP#
ABC CompanyF3A3Q55124AW02
QUANTITYLABORMATERIAL/EQUIPMENT
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
Enter the Construction Specifications Institute (CSI) Division
Subcontracting - Subcontractor Name- 0- 0- 0
example: Type of Material OR Equipment2EA- 010.0020.0020.00
example: Labor Category Priced3HRS10.0030.00- 030.00
example: Labor Category Priced3HRS10.0030.00- 030.00
- 0- 0- 0
SUBTOTAL80.00
Sub-Contractor's Overhead3.00%2.40
Sub-Contractor's Profit1.00%0.82
- 0- 0- 0
Enter the Construction Specifications Institute (CSI) Division- 0- 0- 0
Prime Contractor- 0- 0- 0
example: Type of Material2EA- 010.0020.0020.00
example: Labor Category Priced3HRS20.0060.00- 060.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS83.22
PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)3.00%2.50
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)1.00%0.86
PERFORMANCE and PAYMENT BONDS (Fill in%) N/A for this project0.00%- 0
TOTAL$ 86.58

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

File details come from the government source that posted it. Updated .