D0MESTIC WATER PIPE BURSTING/TRENCHING
BID SCHEDULE
BASIC CONTRACT
PERFORMANCE PERIOD ______ - ______
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and or replace domestic water piping and equipment at various locations throughout Joint Base McGuire-Dix-Lakehurst (JB M-D-L).
Item No.
Supplies/Service
EST
QTY
Unit Unit Price Total Amount
| 0000 |
| NONPERSONAL SERVICES: |
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to repair / upgrade, by pipe bursting / trenching method, sections of the domestic water pipes, including shop drawings, scheduling work, demolition and installation of piping, valves, fittings, accessories and pavement and provide temporary bypass support as listed at J B M-D-L, from the period of ______ to ______ in accordance with the Statement of Work.
| 0001 |
| Provide Design and Layout for Water Pipe |
Replacement of up to 600 LF of underground cement-asbestos, old cast, new ductile iron, or plastic pipe with SDR.
EA
| 0002 |
| Perform Sonar Ground Imaging to verify |
Obstructions or other comparable method.
1,150
LF
| 0004 |
| Provide and Install Temporary Bypass Piping |
| 0005 |
| Site Demolishing – Concrete Curbing and |
Dispose
| 0006 |
| Site Demolishing – Concrete Sidewalk and |
SY
| 0007 |
| Site Demolishing – Asphalt Pavement and |
Coordinate Pipe Section Area Shutdown with Water and Waste Shop and Isolate Section and Affected Building Systems/ Facilitate all Digging permits.
| 0009 |
| Excavation/Trenching |
| 0010 |
| Excavate Pipe Areas for Bursting |
Equipment and Lateral Connections
CY
| 0011 |
| Shoring for Trenching/Pipe Bursting |
| 0014 |
| Provide and Install Polyethylene SDR |
Pipe – 12” Bursting Method
| 0015 |
| Provide and Install Polyethylene SDR |
Pipe – 10” Bursting Method
| 0016 |
| Provide and Install Polyethylene SDR |
Pipe – 8” Bursting Method
| 0017 |
| Provide and Install Polyethylene SDR |
Pipe – 6”, 5” Bursting Method
| 0018 |
| Provide and Install Polyethylene SDR |
Pipe – 4”, 3” Bursting Method
| 0019 |
| Provide and Install Polyethylene SDR |
Pipe – 2-1/2”, 2”, 1-1/2” Bursting Method
| 0020 |
| Provide and Install Polyethylene SDR |
Pipe – 1-1/4”, 1”, ¾” Bursting
| 0021 |
| Provide and Install Location Wire |
And Warning Tape
4,725
| 0022 |
| Provide and Install Polyethylene Pipe |
Saddle Tap – 12” or Tee
| 0023 |
| Provide and Install Polyethylene Pipe |
Saddle Tap – 10” or Tee
| 0024 |
| Provide and Install Polyethylene Pipe |
Saddle Tap – 8” or Tee
| 0025 |
| Provide and Install Polyethylene Pipe |
Saddle Tap – 6”, 5” or Tee
Provide and Install Polyethylene Pipe Saddle Tap – 4” or Tee
| 0027 |
| Provide and Install Polyethylene Pipe |
Saddle Lateral Connection 3”, 2-1/2”
| 0028 |
| Provide and Install Polyethylene Pipe |
Saddle Lateral Connection 2”, 1-1/2”
| 0029 |
| Provide and Install Polyethylene Pipe |
Saddle Lateral Connection 1-1/4”, 1”, ¾”
| 0030 |
| Provide and Install Steel Fire Post |
Indicator Valve – 6” Underground & Surface Flush Box
| 0031 |
| Provide and Install Fire Hydrant 6” |
| 0032 |
| Provide and Install Fire Hydrant |
Shut-off Valve and Valve Box
| 0033 |
| Provide and Install Valve Curb Box |
And Cover to Grade
| 0034 |
| Provide & Install Fire Hydrant Thrust |
Block approx. 1/2CY reinforced Hydrant Elbow or approx 1/2CY reinforced main Pipe
| 0035 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 12”
| 0036 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 10”
| 0037 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 8”
| 0038 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 6”, 5”
| 0039 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 4”, 3”
| 0040 |
| Provide and Install Termination Fitting |
Polyethylene Pipe to Steel 2”, 1”
| 0041 |
| Provide and Install Fitting Ductile Iron |
12” Tee or 90 Degree Elbow
| 0042 |
| Provide and Install Fitting Ductile Iron |
10” Tee or 90 Degree Elbow
Provide and Install Fitting Ductile Iron 8” Tee or 90 Degree Elbow
| 0044 |
| Provide and Install Fitting Ductile Iron |
6”, 5” Tee or 90 Degree Elbow
| 0045 |
| P3rovide and Install Fitting Ductile Iron |
4”5, 3, 2-1/2” Tee or 90 Degree Elbow
| 0046 |
| P6rovide and Install Fitting Ductile Iron |
2”, 1” Tee or 90 Degree Elbow
| 0047 |
| Provide and Install Valve 12” Mechanical Joint |
| 0048 |
| Provide and Install Valve 10” Mechanical Joint |
| 0049 |
| Provide and Install Valve 8” Mechanical Joint |
| 0050 |
| Provide and Install Valve 6”,5” Mechanical Joint |
| 0051 |
| Provide and Install Valve 4”,3 Mechanical Joint |
| 0052 |
| Provide and Install Valve 2”,1” Mechanical Joint |
| 0053 |
| Provide and Install Ductile Iron Pipe 12” |
Excavation not included
| 0054 |
| Provide and Install Ductile Iron Pipe 10” |
| 0055 |
| Provide and Install Ductile Iron Pipe 8” |
| 0056 |
| Provide and Install Ductile Iron Pipe 6”, 5” |
| 0057 |
| Provide and Install Ductile Iron Pipe 4”, 3” |
| 0058 |
| Provide and Install Ductile Iron Pipe 2”, 1” |
| 0059 |
| Provide and Install Polyethylene Pipe 12” |
| 0060 |
| Provide and Install Polyethylene Pipe 10” |
| 0061 |
| Provide and Install Polyethylene Pipe 8” |
| 0062 |
| Provide and Install Polyethylene Pipe 6”, 5” |
Provide and Install Polyethylene Pipe 4”, 3”
| 0064 |
| Provide and Install Polyethylene Pipe 2”, 1” |
| 0065 |
| Pneumatic Leak Check – Pipe & Valves |
| 0066 |
| Replace Sidewalk to Match Existing |
| 0067 |
| Replace Roadway to Match Existing |
| 0068 |
| Replace curbing to Match Existing |
| 0069 |
| Hypo-chlorinate disinfect pipe section |
| 0070 |
| Water Test NJ State Cert. Lab |
For PH, CL2, bacteria, E. Coli, asbestos
| 0071 |
| Dispose of Hypo-chlorinated Water |
| 0072 |
| Water fill new pipe section |
| 0073 |
| Provide Potable Water Tanker Truck 3500 Gallons |
| 0074 |
| Replace Sidewalk to Match Existing, For |
Congruent Sidewalks more than 20LF
TOTAL AMOUNT FOR PERFORMANCE PERIOD OF ______ THRU ______ ___________
FIRST OPTION YEAR
PERFORMANCE PERIOD ______ - ______
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and or replace domestic water piping and equipment at various locations throughout Joint Base McGuire-Dix-Lakehurst (JB M-D-L).
EST
QTY
Unit Unit Price Total Amount
| 1000 |
| NONPERSONAL SERVICES: |
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to repair / upgrade, by pipe bursting / trenching method, sections of the domestic water pipes, including shop drawings, scheduling work, demolition and installation pavement and provide temporary bypass support as listed at JB M-D-L from the period of ______ to ______ in accordance with the Statement of Work.
| 1001 |
| Provide Design and Layout for Water Pipe |
Replacement of up to 600 LF of underground
| 1002 |
| Perform Sonar Ground Imaging to verify |
| 1004 |
| Provide and Install Temporary Bypass Piping |
| 1005 |
| Site Demolishing – Concrete Curbing and |
| 1006 |
| Site Demolishing – Concrete Sidewalk and |
| 1007 |
| Site Demolishing – Asphalt Pavement and |
Coordinate Pipe Section Area Shutdown with Water and Waste Shop and Isolate
| 1009 |
| Excavation/Trenching |
| 1010 |
| Excavate Pipe Areas for Bursting |
| 1011 |
| Shoring for Trenching/Pipe Bursting |
| 1014 |
| Provide and Install Polyethylene SDR |
| 1015 |
| Provide and Install Polyethylene SDR |
| 1016 |
| Provide and Install Polyethylene SDR |
| 1017 |
| Provide and Install Polyethylene SDR |
| 1018 |
| Provide and Install Polyethylene SDR |
| 1019 |
| Provide and Install Polyethylene SDR |
| 1020 |
| Provide and Install Polyethylene SDR |
| 1021 |
| Provide and Install Location Wire |
| 1022 |
| Provide and Install Polyethylene Pipe |
| 1023 |
| Provide and Install Polyethylene Pipe |
| 1024 |
| Provide and Install Polyethylene Pipe |
| 1025 |
| Provide and Install Polyethylene Pipe |
Provide and Install Polyethylene Pipe
| 1027 |
| Provide and Install Polyethylene Pipe |
| 1028 |
| Provide and Install Polyethylene Pipe |
| 1029 |
| Provide and Install Polyethylene Pipe |
| 1030 |
| Provide and Install Steel Fire Post |
| 1031 |
| Provide and Install Fire Hydrant 6” |
| 1032 |
| Provide and Install Fire Hydrant |
| 1033 |
| Provide and Install Valve Curb Box |
| 1034 |
| Provide & Install Fire Hydrant Thrust |
Block approx. 1/2CY reinforced Hydrant
| 1035 |
| Provide and Install Termination Fitting |
| 1036 |
| Provide and Install Termination Fitting |
| 1037 |
| Provide and Install Termination Fitting |
| 1038 |
| Provide and Install Termination Fitting |
| 1039 |
| Provide and Install Termination Fitting |
| 1040 |
| Provide and Install Termination Fitting |
| 1041 |
| Provide and Install Fitting Ductile Iron |
| 1042 |
| Provide and Install Fitting Ductile Iron |
Provide and Install Fitting Ductile Iron
| 1044 |
| Provide and Install Fitting Ductile Iron |
| 1045 |
| P3rovide and Install Fitting Ductile Iron |
| 1046 |
| P6rovide and Install Fitting Ductile Iron |
| 1047 |
| Provide and Install Valve 12” Mechanical Joint |
| 1048 |
| Provide and Install Valve 10” Mechanical Joint |
| 1049 |
| Provide and Install Valve 8” Mechanical Joint |
| 1050 |
| Provide and Install Valve 6”,5” Mechanical Joint |
| 1051 |
| Provide and Install Valve 4”,3 Mechanical Joint |
| 1052 |
| Provide and Install Valve 2”,1” Mechanical Joint |
| 1053 |
| Provide and Install Ductile Iron Pipe 12” |
| 1054 |
| Provide and Install Ductile Iron Pipe 10” |
| 1055 |
| Provide and Install Ductile Iron Pipe 8” |
| 1056 |
| Provide and Install Ductile Iron Pipe 6”, 5” |
| 1057 |
| Provide and Install Ductile Iron Pipe 4”, 3” |
| 1058 |
| Provide and Install Ductile Iron Pipe 2”, 1” |
| 1059 |
| Provide and Install Polyethylene Pipe 12” |
| 1060 |
| Provide and Install Polyethylene Pipe 10” |
| 1061 |
| Provide and Install Polyethylene Pipe 8” |
| 1062 |
| Provide and Install Polyethylene Pipe 6”, 5” |
Provide and Install Polyethylene Pipe 4”, 3”
| 1064 |
| Provide and Install Polyethylene Pipe 2”, 1” |
| 1065 |
| Pneumatic Leak Check – Pipe & Valves |
| 1066 |
| Replace Sidewalk to Match Existing |
| 1067 |
| Replace Roadway to Match Existing |
| 1068 |
| Replace curbing to Match Existing |
| 1069 |
| Hypo-chlorinate disinfect pipe section |
| 1070 |
| Water Test NJ State Cert. Lab |
| 1071 |
| Dispose of Hypo-chlorinated Water |
| 1072 |
| Water fill new pipe section |
| 1073 |
| Provide Potable Water Tanker Truck 3500 Gallons |
| 1074 |
| Replace Sidewalk to Match Existing, For |
TOTAL AMOUNT FOR PERFORMANCE PERIOD OF ______ THRU ______ __________
SECOND OPTION YEAR
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and or replace domestic water piping and equipment at various locations throughout Joint Base McGuire-Dix-Lakehurst (JB M-D-L).
EST
QTY
Unit Unit Price Total Amount
| 2000 |
| NONPERSONAL SERVICES: |
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to repair / upgrade, by pipe bursting / trenching method, sections of the domestic water pipes, including shop drawings, scheduling work, demolition and installation pavement and provide temporary bypass support as listed at JB M-D-L, from the period of ______ to ______ in accordance with the Statement of Work.
| 2001 |
| Provide Design and Layout for Water Pipe |
Replacement of up to 600 LF of underground
| 2002 |
| Perform Sonar Ground Imaging to verify |
| 2004 |
| Provide and Install Temporary Bypass Piping |
| 2005 |
| Site Demolishing – Concrete Curbing and |
| 2006 |
| Site Demolishing – Concrete Sidewalk and |
| 2007 |
| Site Demolishing – Asphalt Pavement and |
Coordinate Pipe Section Area Shutdown with Water and Waste Shop and Isolate
| 2009 |
| Excavation/Trenching |
| 2010 |
| Excavate Pipe Areas for Bursting |
| 2011 |
| Shoring for Trenching/Pipe Bursting |
| 2014 |
| Provide and Install Polyethylene SDR |
| 2015 |
| Provide and Install Polyethylene SDR |
| 2016 |
| Provide and Install Polyethylene SDR |
| 2017 |
| Provide and Install Polyethylene SDR |
| 2018 |
| Provide and Install Polyethylene SDR |
| 2019 |
| Provide and Install Polyethylene SDR |
| 2020 |
| Provide and Install Polyethylene SDR |
| 2021 |
| Provide and Install Location Wire |
| 2022 |
| Provide and Install Polyethylene Pipe |
| 2023 |
| Provide and Install Polyethylene Pipe |
| 2024 |
| Provide and Install Polyethylene Pipe |
| 2025 |
| Provide and Install Polyethylene Pipe |
| 2026 |
| Provide and Install Polyethylene Pipe |
| 2027 |
| Provide and Install Polyethylene Pipe |
| 2028 |
| Provide and Install Polyethylene Pipe |
| 2029 |
| Provide and Install Polyethylene Pipe |
| 2030 |
| Provide and Install Steel Fire Post |
| 2031 |
| Provide and Install Fire Hydrant 6” |
| 2032 |
| Provide and Install Fire Hydrant |
| 2033 |
| Provide and Install Valve Curb Box |
| 2034 |
| Provide & Install Fire Hydrant Thrust |
Block approx. 1/2CY reinforced Hydrant
| 2035 |
| Provide and Install Termination Fitting |
| 2036 |
| Provide and Install Termination Fitting |
| \2037 |
| Provide and Install Termination Fitting |
| 2038 |
| Provide and Install Termination Fitting |
| 2039 |
| Provide and Install Termination Fitting |
| 2040 |
| Provide and Install Termination Fitting |
| 2041 |
| Provide and Install Fitting Ductile Iron |
| 2042 |
| Provide and Install Fitting Ductile Iron |
| 2043 |
| Provide and Install Fitting Ductile Iron |
| 2044 |
| Provide and Install Fitting Ductile Iron |
| 2045 |
| P3rovide and Install Fitting Ductile Iron |
| 2046 |
| P6rovide and Install Fitting Ductile Iron |
| 2047 |
| Provide and Install Valve 12” Mechanical Joint |
| 2048 |
| Provide and Install Valve 10” Mechanical Joint |
| 2049 |
| Provide and Install Valve 8” Mechanical Joint |
| 2050 |
| Provide and Install Valve 6”,5” Mechanical Joint |
| 2051 |
| Provide and Install Valve 4”,3 Mechanical Joint |
| 2052 |
| Provide and Install Valve 2”,1” Mechanical Joint |
| 2053 |
| Provide and Install Ductile Iron Pipe 12” |
| 2054 |
| Provide and Install Ductile Iron Pipe 10” |
| 2055 |
| Provide and Install Ductile Iron Pipe 8” |
| 2056 |
| Provide and Install Ductile Iron Pipe 6”, 5” |
| 2057 |
| Provide and Install Ductile Iron Pipe 4”, 3” |
| 2058 |
| Provide and Install Ductile Iron Pipe 2”, 1” |
| 2059 |
| Provide and Install Polyethylene Pipe 12” |
| 2060 |
| Provide and Install Polyethylene Pipe 10” |
| 2061 |
| Provide and Install Polyethylene Pipe 8” |
| 2062 |
| Provide and Install Polyethylene Pipe 6”, 5” |
| 2063 |
| Provide and Install Polyethylene Pipe 4”, 3” |
| 2064 |
| Provide and Install Polyethylene Pipe 2”, 1” |
| 2065 |
| Pneumatic Leak Check – Pipe & Valves |
| 2066 |
| Replace Sidewalk to Match Existing |
| 2067 |
| Replace Roadway to Match Existing |
| 2068 |
| Replace curbing to Match Existing |
| 2069 |
| Hypo-chlorinate disinfect pipe section |
| 2070 |
| Water Test NJ State Cert. Lab |
| 2071 |
| Dispose of Hypo-chlorinated Water |
| 2072 |
| Water fill new pipe section |
| 2073 |
| Provide Potable Water Tanker Truck 3500 Gallons |
| 2074 |
| Replace Sidewalk to Match Existing, For |
TOTAL AMOUNT FOR PERFORMANCE PERIOD OF ______ THRU ______ __________
THIRD OPTION YEAR
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and or replace domestic water piping and equipment at various locations throughout Joint Base McGuire-Dix-Lakehurst (JB M-D-L).
EST
QTY
Unit Unit Price Total Amount
| 3000 |
| NONPERSONAL SERVICES: |
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to repair / upgrade, by pipe bursting / trenching method, sections of the domestic water pipes, including shop drawings, scheduling work, demolition and installation pavement and provide temporary bypass support as listed at JB M-D-L, from the period of ______to ______ in accordance with the Statement of Work.
| 3001 |
| Provide Design and Layout for Water Pipe |
Replacement of up to 600 LF of underground
| 3002 |
| Perform Sonar Ground Imaging to verify |
| 3004 |
| Provide and Install Temporary Bypass Piping |
| 3005 |
| Site Demolishing – Concrete Curbing and |
| 3006 |
| Site Demolishing – Concrete Sidewalk and |
| 3007 |
| Site Demolishing – Asphalt Pavement and |
Coordinate Pipe Section Area Shutdown with Water and Waste Shop and Isolate
| 3009 |
| Excavation/Trenching |
| 3010 |
| Excavate Pipe Areas for Bursting |
| 3011 |
| Shoring for Trenching/Pipe Bursting |
| 3014 |
| Provide and Install Polyethylene SDR |
| 3015 |
| Provide and Install Polyethylene SDR |
| 3016 |
| Provide and Install Polyethylene SDR |
| 3017 |
| Provide and Install Polyethylene SDR |
| 3018 |
| Provide and Install Polyethylene SDR |
| 3019 |
| Provide and Install Polyethylene SDR |
| 3020 |
| Provide and Install Polyethylene SDR |
| 3021 |
| Provide and Install Location Wire |
| 3022 |
| Provide and Install Polyethylene Pipe |
| 3023 |
| Provide and Install Polyethylene Pipe |
| 3024 |
| Provide and Install Polyethylene Pipe |
| 3025 |
| Provide and Install Polyethylene Pipe |
| 3026 |
| Provide and Install Polyethylene Pipe |
| 3027 |
| Provide and Install Polyethylene Pipe |
| 3028 |
| Provide and Install Polyethylene Pipe |
| 3029 |
| Provide and Install Polyethylene Pipe |
| 3030 |
| Provide and Install Steel Fire Post |
| 3031 |
| Provide and Install Fire Hydrant 6” |
| 3032 |
| Provide and Install Fire Hydrant |
| 3033 |
| Provide and Install Valve Curb Box |
| 3034 |
| Provide & Install Fire Hydrant Thrust |
Block approx. 1/2CY reinforced Hydrant
| 3035 |
| Provide and Install Termination Fitting |
| 3036 |
| Provide and Install Termination Fitting |
| 3037 |
| Provide and Install Termination Fitting |
| 3038 |
| Provide and Install Termination Fitting |
| 3039 |
| Provide and Install Termination Fitting |
| 3040 |
| Provide and Install Termination Fitting |
| 3041 |
| Provide and Install Fitting Ductile Iron |
| 3042 |
| Provide and Install Fitting Ductile Iron |
| 3043 |
| Provide and Install Fitting Ductile Iron |
| 3044 |
| Provide and Install Fitting Ductile Iron |
| 3045 |
| P3rovide and Install Fitting Ductile Iron |
| 3046 |
| P6rovide and Install Fitting Ductile Iron |
| 3047 |
| Provide and Install Valve 12” Mechanical Joint |
| 3048 |
| Provide and Install Valve 10” Mechanical Joint |
| 3049 |
| Provide and Install Valve 8” Mechanical Joint |
| 3050 |
| Provide and Install Valve 6”,5” Mechanical Joint |
| 3051 |
| Provide and Install Valve 4”,3 Mechanical Joint |
| 3052 |
| Provide and Install Valve 2”,1” Mechanical Joint |
| 3053 |
| Provide and Install Ductile Iron Pipe 12” |
| 3054 |
| Provide and Install Ductile Iron Pipe 10” |
| 3055 |
| Provide and Install Ductile Iron Pipe 8” |
| 3056 |
| Provide and Install Ductile Iron Pipe 6”, 5” |
| 3057 |
| Provide and Install Ductile Iron Pipe 4”, 3” |
| 3058 |
| Provide and Install Ductile Iron Pipe 2”, 1” |
| 3059 |
| Provide and Install Polyethylene Pipe 12” |
| 3060 |
| Provide and Install Polyethylene Pipe 10” |
| 3061 |
| Provide and Install Polyethylene Pipe 8” |
| 3062 |
| Provide and Install Polyethylene Pipe 6”, 5” |
| 3063 |
| Provide and Install Polyethylene Pipe 4”, 3” |
| 3064 |
| Provide and Install Polyethylene Pipe 2”, 1” |
| 3065 |
| Pneumatic Leak Check – Pipe & Valves |
| 3066 |
| Replace Sidewalk to Match Existing |
| 3067 |
| Replace Roadway to Match Existing |
| 3068 |
| Replace curbing to Match Existing |
| 3069 |
| Hypo-chlorinate disinfect pipe section |
| 3070 |
| Water Test NJ State Cert. Lab |
| 3071 |
| Dispose of Hypo-chlorinated Water |
| 3072 |
| Water fill new pipe section |
| 3073 |
| Provide Potable Water Tanker Truck 3500 Gallons |
| 3074 |
| Replace Sidewalk to Match Existing, For |
TOTAL AMOUNT FOR PERFORMANCE PERIOD OF ______ THRU ______ __________
FOURTH OPTION YEAR
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and or replace domestic water piping and equipment at various locations throughout Joint Base McGuire-Dix-Lakehurst (JB M-D-L).
EST
QTY
Unit Unit Price Total Amount
| 4000 |
| NONPERSONAL SERVICES: |
Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to repair / upgrade, by pipe bursting / trenching method, sections of the domestic water pipes, including shop drawings, scheduling work, demolition and installation pavement and provide temporary bypass support as listed at JB M-D-L, from the period of ______ to ______ in accordance with the Statement of Work.
| 4001 |
| Provide Design and Layout for Water Pipe |
Replacement of up to 600 LF of underground
| 4002 |
| Perform Sonar Ground Imaging to verify |
| 4004 |
| Provide and Install Temporary Bypass Piping |
| 4005 |
| Site Demolishing – Concrete Curbing and Dispose |
| 4006 |
| Site Demolishing – Concrete Sidewalk and Dispose |
| 4007 |
| Site Demolishing – Asphalt Pavement and |
| 4008 |
| Coordinate Pipe Section Area Shutdown |
with Water and Waste Shop and Isolate
| 4009 |
| Excavation/Trenching |
| 4010 |
| Excavate Pipe Areas for Bursting |
| 4011 |
| Shoring for Trenching/Pipe Bursting |
| 4014 |
| Provide and Install Polyethylene SDR |
| 4015 |
| Provide and Install Polyethylene SDR |
| 4016 |
| Provide and Install Polyethylene SDR |
| 4017 |
| Provide and Install Polyethylene SDR |
| 4018 |
| Provide and Install Polyethylene SDR |
| 4019 |
| Provide and Install Polyethylene SDR |
| 4020 |
| Provide and Install Polyethylene SDR |
| 4021 |
| Provide and Install Location Wire |
| 4022 |
| Provide and Install Polyethylene Pipe |
| 4023 |
| Provide and Install Polyethylene Pipe |
| 4024 |
| Provide and Install Polyethylene Pipe |
| 4025 |
| Provide and Install Polyethylene Pipe |
| 4026 |
| Provide and Install Polyethylene Pipe |
| 4027 |
| Provide and Install Polyethylene Pipe |
| 4028 |
| Provide and Install Polyethylene Pipe |
| 4029 |
| Provide and Install Polyethylene Pipe |
| 4030 |
| Provide and Install Steel Fire Post |
| 4031 |
| Provide and Install Fire Hydrant 6” |
| 4032 |
| Provide and Install Fire Hydrant |
| 4033 |
| Provide and Install Valve Curb Box |
| 4034 |
| Provide & Install Fire Hydrant Thrust |
Block approx. 1/2CY reinforced Hydrant
| 4035 |
| Provide and Install Termination Fitting |
| 4036 |
| Provide and Install Termination Fitting |
| 4037 |
| Provide and Install Termination Fitting |
| 4038 |
| Provide and Install Termination Fitting |
| 4039 |
| Provide and Install Termination Fitting |
| 4040 |
| Provide and Install Termination Fitting |
| 4041 |
| Provide and Install Fitting Ductile Iron |
| 4042 |
| Provide and Install Fitting Ductile Iron |
| 4043 |
| Provide and Install Fitting Ductile Iron |
| 4044 |
| Provide and Install Fitting Ductile Iron |
| 4045 |
| P3rovide and Install Fitting Ductile Iron |
| 4046 |
| P6rovide and Install Fitting Ductile Iron |
| 4047 |
| Provide and Install Valve 12” Mechanical Joint |
| 4048 |
| Provide and Install Valve 10” Mechanical Joint |
| 4049 |
| Provide and Install Valve 8” Mechanical Joint |
| 4050 |
| Provide and Install Valve 6”,5” Mechanical Joint |
| 4051 |
| Provide and Install Valve 4”,3 Mechanical Joint |
| 4052 |
| Provide and Install Valve 2”,1” Mechanical Joint |
| 4053 |
| Provide and Install Ductile Iron Pipe 12” |
| 4054 |
| Provide and Install Ductile Iron Pipe 10” |
| 4055 |
| Provide and Install Ductile Iron Pipe 8” |
| 4056 |
| Provide and Install Ductile Iron Pipe 6”, 5” |
| 4057 |
| Provide and Install Ductile Iron Pipe 4”, 3” |
| 4058 |
| Provide and Install Ductile Iron Pipe 2”, 1” |
| 4059 |
| Provide and Install Polyethylene Pipe 12” |
| 4060 |
| Provide and Install Polyethylene Pipe 10” |
| 4061 |
| Provide and Install Polyethylene Pipe 8” |
| 4062 |
| Provide and Install Polyethylene Pipe 6”, 5” |
| 4063 |
| Provide and Install Polyethylene Pipe 4”, 3” |
| 4064 |
| Provide and Install Polyethylene Pipe 2”, 1” |
| 4065 |
| Pneumatic Leak Check – Pipe & Valves |
| 4066 |
| Replace Sidewalk to Match Existing |
| 4067 |
| Replace Roadway to Match Existing |
| 4068 |
| Replace curbing to Match Existing |
| 4069 |
| Hypo-chlorinate disinfect pipe section |
| 4070 |
| Water Test NJ State Cert. Lab |
| 4071 |
| Dispose of Hypo-chlorinated Water |
| 4072 |
| Water fill new pipe section |
| 4073 |
| Provide Potable Water Tanker Truck 3500 Gallons |
| 4074 |
| Replace Sidewalk to Match Existing, For |
TOTAL AMOUNT FOR PERFORMANCE PERIOD OF ______ THRU ______ __________