Attachment 8 Material Submittal Schedule Seed Project

View the file

Other files for this federal contract opportunity

Other files attached to LRAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Amendment 0001 FA4460-11-R-0008.pdf PDF
LRAFB MACC Questions and Answers.pdf PDF
Q and A Info Attendance Rosters.pdf PDF
Attach 3 C D Report.pdf PDF
NKAK_09-1037_Specifications —
Attach 4 LRAFB MACC Past Performance Package.pdf PDF
Attach 7 Seed Project RFP Package.pdf PDF
Attach 2 environmental moa.pdf PDF
Attach 6 SURETY REFERENCE SHEET.pdf PDF
Attach 1 EMIS Contractor Instruction Guide.pdf PDF
Attach 5 Financial Institution Ref Sheet.pdf PDF
FA446011R0008 Solicitation.pdf PDF
MACC Div 1 8 june.pdf PDF
NKAK 09-1037 Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DISAPPROVED

1 SEC 01 11 00 - SUMMARY - Record Drawings 4

SEC 01 14 16 - OCCUPANCY - Phasing Plan

SEC 01 14 19 - COORDINATION

Welding Plan 4

SEC 01 14 19 - COORDINATION

Sketch of found utility locations 4

SEC 01 14 19 - COORDINATION

EPA registration of the Refrigerant Recovery

Equipment

SEC 01 14 19 - COORDINATION

CFC Certification for Personnel Removing

Refrigerant; SEC 01 14 19

SEC 01 14 19 - COORDINATION

Written plan prepared by a competent person detailing demolition removal, disposal and clean-up processes and procedures to be followed

SEC 01 14 19 - COORDINATION

Radioactive Equipment Plan 4

SEC 01 14 19 - COORDINATION

AF Form 3000 for Radioactive Materials; Soils

Density, and Soils Moisture Testing I 4

SEC 01 14 19 - COORDINATION

Demolition, Removal, Disposal, Clean-up plan 4

SEC 01 14 19 - COORDINATION

AF Form 3000 for Radioactive Materials, Soils

Density, and Soils Moisture Testing Equipment 4

SEC 01 33 00 SUBMITTAL PROCEDURES

Catalog cut sheets, MSDS sheets, brochures, Shop Drawings,and/or samples for items scheduled in drawings and specifications 4 4 4 4 4 4 4 4

LRAFB B-259 AF66

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E

N U

M B

E R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

Attachment 8

LRAFB B-259 AF66

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E

N U

M B

E R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

SEC 01 45 00 QUALITY CONTROL and SEC 02 42

00 CONSTRUCTION & DEMOLITION WASTE

MANAGEMENT

Demolition Debris Reports

SEC 01 45 00 QUALITY CONTROL

Selected Land Barrow Area Certification free of cultural, historic and prehistoric resources 4

SEC 01 45 00 - QUALITY CONTROL

Storm Water Pollution Prevention Plan 4

SEC 01 45 00 - QUALITY CONTROL

ADEQ Form NOI for SWPPP 4

SEC 01 45 00 - QUALITY CONTROL

Receipt for ADEQ NOI and Payment 4

SEC 01 45 00 - QUALITY CONTROL

Drawings of the SWPPP and Temporary Erosion

Control Measures

SEC 01 45 00 - QUALITY CONTROL

SWPPP Termination Notice 4

SEC 01 50 00 -CONSTRUCTION FACILITIES &

TEMPORARY CONTROLS

Temporary Heating Appliances

SEC 01 50 00 -CONSTRUCTION FACILITIES &

TEMPORARY CONTROLS

Work Sequence Schedule

SEC 01 62 35 - RECYCLED / RECOVERED

MATERIALS Product data, samples, misc.

submittals

4 4 4

SEC 01 69 99 -REAL PROPERTY RECORDS Real

Property Checklist (DD Form 1354) 4

SEC 02 42 13 - RECLAMATION OF ACOUSTICAL

CEILING PANELS - Certi-fication all removed ceiling tiles is recycled and not placed in a landfill

4 4

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E N

U M

B E

R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

SEC 05 50 23 -MISCELLANEOUS METAL

FABRICATIONS

1. Product Data

2. Welding Procedure Qualifications

3. Welder, Welding Operator, and Tacker

Qualification

4. Inspector Qualification

5. Previous Qualifications

6. Prequalified Procedures

4 4

SEC 05 05 23 -MISCELLANEOUS METAL

FABRICATIONS

Welding Log 4

SEC 07 60 00 FLASHING AND SHEET METAL -

Covering on flat, sloped or curved surfaces;

flashing at roof penetrations; drip edge 4 4

SEC 07 84 00 - FIRESTOPPING

1. Shop Drawings

2. Certificates 4 4 4

SEC 09 51 00 – ACOUSTICAL CEILINGS

1. Shop Drawings

2. Product Data and % recycled material

3. Samples

4. Test Reports

5. Certificates

4 4 4 4 4

SEC 09 51 00 – ACOUSTICAL CEILINGS

Affirmative Procurement Submit recycled material content

4 4

SEC 09 51 00 – ACOUSTICAL CEILINGS

Weight and volume of acoustic ceiling tiles with recycle material

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E

N U

M B

E R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

SEC 23 00 00 - AIR SUPPLY, DISTRIBUTATION,

VENTILATION

1. Shop Drawings

2. Product Data

3. Delegated Design Submittal

4. Qualification and Test Data

5. Piping Drawings

6. Welding Certificates

7. Field Test Reports and Certificates

8. Field Quality Control Reports

9. Operation and Maintenance Manuals.

10. Equipment diagrams in each Mechanical

Room

4 6 4 4 4 4

COMMON PIPING FOR HVAC

4 4 4 4 4 4 6 4 4 4

SEC 23 05 48 – VIBRATION AND SEISMIC

CONTROLS FOR HVAC PIPING AND EQUIPMENT

1. Shop Drawings

2. Product Data

3. Welding Certificates

4 4 4 4 4

SEC 23 07 00 – INSULATION FOR MECHANICAL

SYSTEMS

1. Test Reports

2. Certificates4

3. Pipe, Duct, and Equipment Insulation Systems

4 4 4 4 4

SEC 23 08 00 - TESTING, ADJUSTING,

BALANCING FOR HVAC

1. Pre-Field TAB and DALT Engineering Report

2 TAB Personnel Qualification Requirements

3. TAB and DALT Reports at Closeout

3. Certificates

4 4 4 4 4

SEC 23 08 00.00 10 - COMMISSIONING OF HVAC

SYSTEMS 1. Commissioning Plan 2.

Performance Test Checklists 3. Commissioning

Report 4. Commissioning Specialist/Firm 4 4 4 4

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E

N U

M B

E R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

SEC 23 09 23 - DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER LOCAL BUILDING SYSTEMS

1. Material, Equipment, and Fixture lists for controls and instrumentation.

2. Records of Existing Conditions.

3. Fabrication Drawings for Control and

Instrumentation.

4. Preconstruction Submittals

5. Shop Drawings

6. Product Data

7. Project Sequencing

8. Test Reports

9. Certificates

10. Appendix A

11. As-Built

4 4 4 4 4 4 4 4 4 4

23 11 25 - FACILITY GAS PIPING 1. Welding and

Welder Qualifications 4 4 4 4 4

SECTION 23 31 13 – METAL DUCTS

1. Shop Drawings

a. Penetration Requirements.

b. Duct Accessories

DUCT ACCESSORIES - 23 33 00 1. Existing conditions 2. As Built Drawings 3. Materials, equipment, and fixtures List 4 4 6 4

SECTION 23 34 23 – HVAC POWER

VENTILATORS

1. Shop Drawings

2. Product Data

3. Operation and Maintenance Data

4 4 4

SEC 23 36 00 - AIR TERMINAL UNITS 1. Existing

Conditions 2. Record Drawings 4 6 4

SECTION 23 37 13 – DIFFUSERS, REGISTERS,

AND GRILLES

1. Product Data

REMARKS

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

SCHEDULE OF MATERIAL SUBMITTALS

L

IN

E N

U M

B E

R

D E

S

IG

N D

A T

A

O P

E R

A T

IN

G

A N

D M

A

IN

T E

N A

N C

E D

A T

A

C E

R T

IF

IC

A T

E S

S A

M P

L E

S

(To be completed by Contract Administrator)

S U

B M

IT

T

A L

N U

M B

E R

S

R E

T U

R N

S U

S P

E N

S E

D A

T E

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

F

IN

A L

A P

P R

O V

A L

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

NKAK 09-1037 SUSTAIN REPAIR

AERIAL DELIVERY AHU, B-259

DATE CONTRACTOR

NOTIFIED

M A

N U

F A

C T

U R

E R

S

I N

S T

R U

C T

IO

N

S

P R

E C

O N

S T

R U

C T

IO

N

M E

E T

IN

G

S H

O P

D R

A W

IN

G

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

M A

N U

F A

C T

U R

E R

'S F

IE

L

D R

E P

O R

T S

P R

O D

U C

T D

A T

A

T E

S T

R E

P O

R T

S

C L O

S E

O U

T

S C

H E

D U

L E

S

L

IS

T

IN

G S

R

E P

O R

T S

P

L A

N S

SECTION 23 52 00 - HEATING BOILERS 1. Piping

Installation 2. Spare Parts 3. Installer

Qualifications 4 4 4 4 6 4 4 4 4

SECTION 23 64 10 - VAPOR COMPRESSION

TYPE WATER CHILLERS 1. Refrigeration System

2. Sound Test 6 4 4 4

SEC 23 64 26 - CHILLED, CHILLED-HOT, AND

CONDENSER WATER PIPING SYSTEMS 1.

Welder Quafifications 6 4 4 4

SECTION 26 00 00 – ELECTRICAL

1. Shop Drawings

2. Product Installation

3. Operation and Maintenance Manuals 4 4 4 4

SECTION 26 20 00 – INTERIOR DISTRIBUTION

SYSTEM

1. Product Data

2. Installer

Qualifications

3. Reports – Field Quality Control

4. Operation and Maintenance Data

4 4 4 4 4 4 4