FA446011R0008 Solicitation.pdf
PDF 616 KB Posted
- Attached to
- LRAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4460-11-R-0008
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LRAFB MACC Questions and Answers.pdf | ||
| Amendment 0001 FA4460-11-R-0008.pdf | ||
| Q and A Info Attendance Rosters.pdf | ||
| NKAK 09-1037 Drawings.pdf | ||
| Attach 2 environmental moa.pdf | ||
| Attach 8 AF66 Seed Project.pdf | ||
| Attach 6 SURETY REFERENCE SHEET.pdf | ||
| Attach 1 EMIS Contractor Instruction Guide.pdf | ||
| Attach 3 C D Report.pdf | ||
| NKAK_09-1037_Specifications | — | |
| Attach 4 LRAFB MACC Past Performance Package.pdf | ||
| Attach 7 Seed Project RFP Package.pdf | ||
| Attach 5 Financial Institution Ref Sheet.pdf | ||
| MACC Div 1 8 june.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2S3CZ1146A001
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
THE TOTAL AGGREGATE AMOUNT EXPENDABLE UNDER ALL MACC CONTRACTS AWARDED SHALL NOT EXCEED $95 MILLION FOR BASE
PERIOD AND ALL OPTION PERIODS. SEED PROJECT MAGNITUDE IS BETWEEN $250,000 AND $500,000
A PRE-PROPOSAL CONFERENCE/SITE VISIT IS SCHEDULED AND WILL INCLUDE A VISIT TO THE SEED PROJECT LOCATION. SEE SECTION L, INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS FOR DATES/TIMES.
NOTICE TO OFFERORS: FUNDS ARE NOT PRESENTLY AVAILABLE FOR THE SEED PROJECT, BUT ARE RESERVED. NO AWARD WILL BE
MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS
SOLICITATION/RFP EITHER BEFORE OR AFTER THE CLOSING DATE.
THE GUARANTEED MINIMUM AMOUNT OVER THE LIFE OF THIS CONTRACT IS $2,000 PAYABLE FOLLOWING ATTENDANCE AT A
MANDATORY ORIENTATION CONFERENCE
CONTRACT PERFORMANCE PERIOD IS A BASE PERIOD PLUS FOUR (4) ONE-YEAR OPTION PERIODS. BASE PERIOD IS 30 SEP 11 (OR DATE
OF CONTRACT AWARD)-31 MAY 12
THIS ACQUISITION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE. GOVERNMENT ANTICIPATES AWARD OF UP TO 6
CONTRACTS. REFER TO SECTION I, 52.29-14 FOR LIMITATIONS ON SUBCONTRACTING.
LISA SMITH 501-987-6470
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Jun-2011
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________SECTION F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________01 Aug 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
19TH CONTRACTING SQUADRON - FA4460
642 THOMAS AVE
LITTLE ROCK AFB AR 72099
FA4460
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
501-987-8119FAX:TEL: 501-987-3303 TEL: FAX:
FA4460-11-R-0008 72
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4460-11-R-0008
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 19,000,000 Lump
Sum
IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
NSN: Z300-00-000-0000
PURCHASE REQUEST NUMBER: F2S3CZ1146A001
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 19,000,000 Lump
OPTION IDIQ MACC Option Year 1
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
NSN: Z300-00-000-0000
UNIT UNIT PRICE MAX AMOUNT
2001 19,000,000 Lump
OPTION IDIQ MACC Option Year 2
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3001 19,000,000 Lump
OPTION IDIQ MACC Option Year 3
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4001 19,000,000 Lump
OPTION IDIQ MACC Option Year 4
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,000.00 $95,000,000.00
Section E - Inspection and Acceptance
INSPECTION/ACCEPTANCE
19 CES/CEPM is designated as the office responsible for inspecting the work while the Contracting Officer is responsible for final acceptance of the work.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
1001 Destination Government Destination Government
2001 Destination Government Destination Government
3001 Destination Government Destination Government
4001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
252.246-7000 Material Inspection And Receiving Report MAR 2008
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 30-SEP-2011 TO
31-MAY-2012
N/A 19 CES/CERF - F2S3CZ
DIANNE PRIDDY
536 THOMAS AVENUE RM 600
LITTLE ROCK AFB AR 72099
501-987-3440
FOB: Destination
F2S3CZ
1001 POP 01-JUN-2012 TO
31-MAY-2013
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-JUN-2013 TO
31-MAY-2014
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-JUN-2014 TO
31-MAY-2015
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-JUN-2015 TO
31-MAY-2016
N/A (SAME AS PREVIOUS LOCATION)
52.211-13 Time Extensions SEP 2000
52.247-34 F.O.B. Destination NOV 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within * (See Note Below) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than * (See Note Below). The time stated for completion shall include final cleanup of the premises.
*Note: Performance period to be negotiated on individual task orders.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of *See Note Below for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
*Note: Liquidated Damages rate will be set on each individual Task Order.
Section G - Contract Administration Data
ADMINISTRATIVE MATTERS
1. ADMINISTRATIVE MATTERS
ADDRESS:
19th Contracting Squadron
19 CONS/LGCA
642 Thomas Avenue
Little Rock AFB, AR 72099-4971
CONTRACTOR’S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title:
Responsible Office:
Address:
Telephone Number:
Email:
Cage Code:
Duns Number:
Tax Identification Number:
INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary: Name of Alternate:
Address: Address:
Telephone #: Telephone #:
Alternate #: Alternate #:
Fax No: Fax No:
Email: Email:
WIDE AREA WORKFLOW RECEIPTS AND ACCEPTANCE (WAWF-RA)
Introduction
The Department of Defense (DoD) initiated WAWF-RA to eliminate paper transactions from the contracting process. The purpose of WAWF-RA is to enable vendors and government officials to electronically access and process the documentation needed to generate payment for goods and services. Once your computer is set-up, registration, and training are completed, invoices will be created and processed in WAWF-RA. WAWF-RA is mandated by DoD Federal Acquisition Regulation Supplement clause 252.232-7003 "Electronic Submission of
Payment Requests", dated March 2008, which is incorporated in this contract. The following information will help you get started.
Setting Up Your Computer
To set up your computer go to https://wawf.eb.mil and select the hyperlink on the left-hand side of the page entitled
―About WAWF-RA‖. An expanded list will appear. Select "Setting Up Your Machine". This page will list all computer, software, and security requirements. All necessary programs can be downloaded from this page. Your computer must be configured properly to use WAWF-RA. Once your computer is set up you may proceed to the registration process.
Registration
For help with the registration process go to https://wawf.eb.mil and select the hyperlink "Help with registration for access to WAWF-RA" in the center of your screen. On the next page go towards the bottom and select the hyperlink under the "Vendors" section. Be sure to list an Electronic Business Point of Contact in the Central Contractor
Registry. This information must be current to process an invoice in WAWF-RA and can be updated by going to www.ccr.gov. Once you are ready to register go to https://wawf.eb.mil and select the hyperlink "Self Register to use WAWF-RA (New users)*" then follow the directions. Upon activation of your account, usually within 2 business days, you will receive notification via email. Prior to logging on to WAWF-RA, users are strongly encouraged to complete the computer-based training.
Training
Training can be accessed by going to http://www.wawftraining.com/. Be sure that your computer meets the minimum requirements listed on this page. Users must register prior to starting the training. This registration is separate from the registration process for the WAWF-RA system. Be aware that this computer-based training is made for all users of WAWF-RA, not just vendors, so be sure to focus on the vendor portion of the training. Once training is completed users may begin to use the system.
Invoice Processing
When creating an invoice, be sure to select the ―Construction Payment Invoice‖ document type, not the ―Invoice‖ or
―Invoice as 2 in 1 (Services Only) type. For construction contract the following must be attached: Contract Progress report AF Form 3065, HAZMAT Usage Report and Construction Contract Debris Report. Once the proper document type is selected, you will be asked to indicate the location for inspection and acceptance. Both must be coded as ―Destination.‖
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL
EMAILS CORRECTLY THROUGH WAWF. CONTRACT NUMBER: See Block 4 of the Standard Form 1442.
If this is a delivery order, be sure to list the contract number from Block 1 and the order number from Block 2 of the
DD Form 1155 when creating the invoice document.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL
EMAILS CORRECTLY THROUGH WAWF.
PAY OFFICE DODAAC: F67100
ISSUE BY DODAAC: FA4460
ADMIN DODAAC: FA4460
SHIP TO CODE (BPN): FA4460
INVOICE DATE: Must be date input into WAWF
Assistance may be obtained from the Defense Information Systems Agency (WESTHEM) at:
Toll Free: 1-866-618-5988
Email: cscassig@ogden.disa.mil (be sure to reference "WAWF" in email subject line).
Should you need additional assistance, contact your point of contact at the 19 th
Contracting Squadron.
Section H - Special Contract Requirements
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUGUST 2007)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and a signed Base Entry Authorization letter from 19 Contracting Squadron.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101 Vol1, the Air Force Installation Security Program, and AFI 31-501, Personnel Security
Program management, as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
REQUIRED INSURANCE IAW FAR 28.306(b)
Reference FAR clause 52.228-5 entitled ―Insurance...‖ the Contractor shall maintain the minimum insurance limits stated in FAR 28.307-2, at its own expense. The following kinds of insurance with respect to performance under the contract are also required to be maintained by the contractor at all times..
a. Workmen’s Compensation and Employer’s Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000, per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
SPECIAL CONTRACT REQUIREMENTS
1. Installation Rules and Regulations
The rules and regulation of the installation where projects are being performed shall apply to the contractor, their employees, and their subcontractors while on the premises of such installation. The regulations included but are not limited to: presenting valid identification for base entrances, obtaining and using vehicle passes for all contractor-owned and/or privately owned vehicles, obeying all posted directives, and providing strict adherence to security forces direction in instances where security forces have been dispatched to particular locations.
Cell phone use while driving is prohibited unless a hands-free device is being used. Seatbelt use is mandatory.
During inclement weather, rain or fog, headlights will be on. Stop vehicle or cease work during playing of the national anthem/1630 daily.
2. Minimum/Maximum Contract Amounts
The contract minimum will be satisfied through the award of a task order issued for the seed project or attendance at a mandatory post-award orientation. The Government makes no representation as to the number of Task Orders or the actual amount of work to be ordered in excess of the minimum guarantee specified herein. The maximum aggregate amount of the Multiple Award Construction Contract (MACC), inclusive of all awarded task orders, including options, shall not exceed $95,000,000.
3. Place of Performance
Locations of work will be Little Rock AFB, AR (Pulaski County) and remote locations Blackjack Drop Zone near
Romance, AR (White County); All American Landing Zone Camp Robinson, AR (Pulaski County); and
Communication Site near Cabot, AR (Lonoke County).
4. Task Order Performance Period
Performance periods will be negotiated for each individual task order.
5. Davis-Bacon Act (DBA) Wage Determinations
Applicable Davis-Bacon wage determination(s) will be identified for all Task Orders issued under this contract current as of the time of solicitation of the Task Order. Applicable DBA wage determinations include Construction
Types: Building, Heavy, and Highway for Arkansas Counties Pulaski, White, and Lonoke. DBA Wage
Determinations may be accessed at: http://www.wdol.gov/dba.aspx#0 or http://www.gpo.gov/davisbacon/allstates.html.
6. Subcontracting Responsibilities
The prime contractor shall be responsible for the management and performance of all subcontractors. The prime contractor shall ensure Task Orders are completed within the stated requirements.
7. Notice of Constructive Changes
No order, statement, or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of their authority, or any other representatives of the Government, shall constitute a change order under the ―Changes‖ clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or task order schedule, unless such a change is issued in writing and signed by the
Contracting Officer.
8. Pre-Design and/or Preconstruction Conference
After award of each individual Task Order, but prior to commencement of any work, the contractor shall meet with the Contracting Officer and other designated technical personnel/users to discuss and develop a mutual understanding relative to the superintendence, administration of the value engineering and safety program, shop drawings, and other submittals, scheduling, and prosecution of the work. Major Subcontractors who will engage in the work may attend.
9. Performance Evaluations
At the conclusion of each Task Order that exceeds $650,000, the Contracting Officer will complete a contractor’s performance evaluation in the Construction Contractor Appraisal Support System (CCASS). The evaluation will take into account all aspects of the contractor’s performance. Performance evaluations may be completed at any time the Contractor’s performance is considered less than satisfactory. Contractors are required to obtain PKI certificates and register at the CCASS/ACCASS website (http://cpars.navy.mil). Performance evaluations will be provided electronically through CCASS and contractor will be afforded an opportunity to review and respond to performance evaluations through CCASS. After considering input from the contractor, the Contracting Officer makes the final determination on ratings for all performance evaluations. The performance evaluations may have an impact on the award of future Task Orders. For those Task Orders less than $650,000, the Contracting Officer will complete a non-CCASS performance evaluation on the contractor’s performance. Contractor will be given an opportunity to review this evaluation and provide comments prior to the evaluation being placed in the task order file.
10. Task Order Issuance Procedures
Work under this contract will be ordered by written task order orders using a Department of Defense (DD) Form
1155, Order for Supplies or Services. Task order numbers will consist of the basic contract number followed by a 4-digit supplemental task order number. The task order number must be reflected on all correspondence related to the task order.
The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders.
Task Orders will be firm-fixed price and clearly define the specific services to be performed or the performance desired. Each Task Order may contain additional site or project specific provisions. Any such additional provisions shall be a part of the Request For Proposal (RFP).
Task Order projects may be non-complex performance oriented tasks requiring minimal design, may be complex construction requiring design development for design-build construction, or any combination thereof. Any estimated quantities provided in project documents are considered informational only. Contractors must validate quantities and all features of work necessary to deliver a complete and functional project. The Task Order may or may not have traditional plans and specifications, but may include sketches, and requests for catalog cuts, and other submittals.
The following describes the procedures for each type of requirement the Task Order could present:
(a) Contractor-Provided Design/Design-Build: MACC Contractors shall provide an initial ―Concept‖ design consisting of drawings, sketches, outline specifications, design analysis, and/or other documentation required by the Task Order Statement Of Work (SOW). MACC Contractors shall also provide a price proposal and may be required to include a proposed performance period. The Government will evaluate submitted proposals in accordance with Task Order requirements. Only the successful offeror will be required to proceed with subsequent design effort (i.e. 35%, 65%, 95%, and/or 100% as stated in each Task Order) and execute construction.
(b) Government-Provided Design/Design-Build: MACC Contractors shall be provided a ―Concept‖ design, consisting of drawings, sketches, outline specifications, design analysis and/or other documentation as required by the Task Order SOW. Based on the ―Concept‖ design, MACC Contractors shall provide a price proposal and may be required to include a proposed performance period. The Government will evaluate the submitted proposals in accordance with the task order requirements. Only the successful offeror will be required to proceed with subsequent design effort (i.e. 35%, 65%, 95%, and/or 100% as stated in each Task Order) and execute construction.
(c) Construction Only: MACC Contractors shall be provided a previously accomplished design which may be representative of a 35%, 65%, 95%, or 100% design or a requirement package consisting of drawings, specifications, design analysis, and/or other documentation as required by the task order SOW. Based on the completed design/requirement package, MACC Contractors shall provide a price proposal and may be required to include a proposed performance period. The Government will evaluate submitted price proposals in accordance with the task order requirements. Only the successful offeror will proceed with construction/hazardous material waste removal.
(d) Construction/Hazardous Material Waste Removal: Contractor shall be required to remove only hazardous material waste in task order not associated with other awarded task orders. It is the intent of task orders for design-build or construction only to remove associated hazardous material within the task order.
Task Order solicitations will provide contractors with as much information as possible regarding the existing conditions of the site(s) and any pre-existing structures, but it is the responsibility of the Contractor to validate quantities and all features of work necessary to deliver a complete and functional project.
Time for submittal of the Contractor’s proposal for individual requirements will be as agreed upon by the
Government and the Contractor. However, at no time shall this period exceed ten (10) business days without prior approval of the Contracting Officer.
Upon award of the Task Order, the Contractor’s proposal becomes a firm fixed price task order/contract. Absent documented changes in requirements (necessitating increases in quantities), unforeseen site conditions, or evidence of gross mistakes, the underestimating of quantities of materials does not summarily entitle the Contractor to an upward adjustment of price. Nor is the Government entitled to a rebate of unused quantities in such orders unless specifically mentioned in the Task Order (i.e. order includes estimated quantity line items subject to a variation and for which the Government will only pay for the quantities actually installed. Task Orders may be modified by the
Contracting Officer. Modifications to task orders will be issued on a Standard Form (SF) 30 and cite the task order number.
Submission of proposals for Task Orders is not required; however Contractors are required to contact the
Contracting Officer within two days after receipt of Task Order RFP if a contractor will not participate in the walk through or submit a proposal on a Task Order. Failure by offerors to participate responsibly in site visits and submit proposals may result in the Government not exercising the option to extend the contract or exclusion of the
Contractor from further competition.
11. Competition
Only Contractors awarded contracts as a result of this RFP will compete for subsequent Task Orders. Contractors are encouraged to participate in all site visits and submit proposals.
Occasionally, the Government will request a proposal for projects for which funds are not certified or readily available. Air Mobility Command (AMC) refers to these acquisitions as ―Normal Straddle Bid Authority (NSB)‖, ―Reservation of Funds (ROF)‖, or ―Special Advance Authority (SAA)‖ projects. The Government is not obligated to award task orders for which pricing is obtained for NSB, ROF, or SAA projects. If funds do not become available or agreement on pricing cannot be reached for SAA and ROF projects, the RFP is cancelled and no award is made.
Under NSB, funds may become available in the current fiscal year or the next fiscal year. If a contract is not awarded in the current fiscal year, it will be awarded in the next fiscal year. Information specifically identifying these projects and the funding restriction will be included in the request for proposal. Submission of proposals for these acquisitions is discretionary and will have no negative impact on the contractor.
Unless the Contracting Officer applies the exceptions noted below, each Task Order will be awarded, as a result of competition to the Contractor who offers the best value to the Government considering Task Order evaluation criteria. The Contracting Officer’s decision as to the selection for award of a Task Order is not protestable unless the protest is on the grounds that the order increases the scope, period, or maximum value of the contract program.
The Contracting Officer reserves the right to award a Task Order without competition based upon a determination that:
(a) The agency need for the supplies or services are so urgent that providing a fair opportunity would result in unacceptable delays
(b) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services being ordered are unique or highly specialized
(c) The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order
12. Description of Subsequent Task Orders
Task Orders will range from $2,000 to $10,000,000. Task order projects may require either a single discipline or may be multi-disciplined. Projects may also require design services, to include comprehensive interior design, and incorporation of sustainable features. Additionally, projects may require hazardous material waste removal (i.e.
asbestos abatement, lead abatement etc.) as incidental to a project or may be wholly for hazardous material waste removal.
Technical narratives, if required, may address one or more of the following:
(a) Design
(b) The contractor’s technical understanding of the work
(c) The most efficient and effective plan to accomplish the work
(d) Rationale for proposed materials, type, and quantities
(e) Sustainable design features
13. Subsequent Task Order Evaluation Criteria
Subsequent Task Orders may be awarded on best value, either tradeoff process or low price technically acceptable.
If the Government decides to issue the Task Order as a best value using the tradeoff process, award factors will vary depending on the unique requirements of each Task Order. One or more of the following criteria in addition to Price or Cost may be considered:
(a) Past Performance- Task Order past performance of prior past performance on other contracts
(b) Quality of deliverables
(c) Ability to meet schedule requirements
(d) Relevant experience
(e) Cost control
(f) Potential impact on other orders placed with the Contractor
(g) Current workload
(h) Design
(i) The Contractor’s technical understanding of the work
(j) The most efficient and effective plan to accomplish the work
(k) Rationale for proposed materials, type, and quantities
(l) Sustainable design features
14. Performance and Payment bonds—Applicable To Task Orders
Contractor shall furnish Performance and Payment bonds (SF 25/25A) with good and sufficient surety or sureties, acceptable to the Government. A Notice To Proceed shall not be issued and no work shall begin until good and sufficient surety, as identified below, has been received and accepted by the Contracting Officer
Performance Bond: Unless Contracting Officer determines that a lesser amount is adequate for the protection of the
Government, the penal sum of the performance bonds shall equal one hundred percent (100%) of the contract price for each task order.
Payment Bond: Shall equal one hundred percent (100%) of the contract price for each Task Order.
One of following is required:
(a) Payment Bond
(b) An irrevocable letter of credit (ILC)
Bonds are due within ten (10) days of receipt of the Task Order
15. Environmental Compliance
Offerors are reminded of the environmental requirements contained in the solicitation to comply with all applicable federal, state, and local environmental statutes and regulations. In addition to the scrutiny of the civil environmental regulatory agencies, environmental compliance incidental to Air Force activities or on Air Force property is subject to Air Force scrutiny. The Air Force routinely investigates environmental violations and compliance. Contracts shall comply with the Affirmative Procurement Plan (APP) for proposal preparation and construction. Affirmative
Procurement (Recycled/Recovered Materials) is a mandatory component of the Air Force Pollution Prevention
Program.
16. Smoking in Air Force Facilities
Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in Air Force facilities. AFI 40-102, Tobacco Use in the Air Force outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.
17. Availability of Utilities Services
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor’s own expense.
18. Utilities Conservation
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, the government at no cost will furnish utilities such as water, electricity, etc., to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.
19. Special Utility Provision
The contractor shall not hold the Government responsible for interruptions of utility service nor liable for contractor delay, damages, or increased costs occasioned by any such interruption of service. Existing electrical service to the facility shall be maintained until new electrical service is in place and ready for operation. Utility interruptions shall be approved by the Contracting Officer and must be submitted in writing to the Contracting Officer at least two (2) weeks prior to such work. Electrical primary power outages will be performed by and shall be fully coordinated with the 19 th
Civil Engineering Squadron (CES). Water outages will be performed by and shall be fully coordinated with th
CES. Water outages also require a minimum 2-week request in writing to the Contracting Officer for review/approval.
Prior to the start of work, the Contractor shall identify and locate all valve or utility shut-off location for use in the event of accidental damage. To preclude accidental damage, the Contractor shall locate all known utilities (i.e., communication, natural gas, fuel supply, etc.) by hand digging prior to any excavation with power equipment. The
Contractor shall note all utilities discovered during excavations that are missing or incorrect on the contract drawings
(including any erroneous dimensions on Government record drawings), or those utilities staked by the user, and clearly identify those discoveries on the as-built drawings.
The Government does not guarantee the accuracy, availability, or adequacy of existing as-built/record drawings as pertaining to existing facilities and underground utilities. The Contractor is responsible to verify all dimensions and actual conditions when developing individual task order proposals. Failure to verify the dimensions and locations will be at the Contractor’s risk and shall not relieve the Contractor from accomplishing the work required by the contract at the price awarded by the Government. The Contractor shall immediately repair any utility line shown on a record drawing (or made known to the Contractor) and damaged during construction work, at no cost to the
Government.
20. Designation of Government Inspector
The Base Civil Engineer or his/her authorized representative is designated as the representative of the Contracting
Officer for the purpose of monitoring performance and inspection, which includes performing technical surveillance, including workmanship and compliance with the plans and specifications under this contract. This provision in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of this contract and subsequent Task Orders.
21. Preparation of Material Approval Submittal
The submittals contemplated by FAR 52.236-5, Material and Workmanship, in Section I shall be accomplished on and in accordance with the instruction pertaining to an AF Form 3000, Material Approval Submittal.
22. Preparation of Schedules for Construction Contracts
The reports contemplated by FAR 52.236-15, Schedules for Construction Contracts, in Section I shall be accomplished on and in accordance with the instruction pertaining to an AF Form 3064, Contract Progress Schedule, and an AF Form 3065, Contract Progress Report, unless otherwise designated by the Contracting Officer.
23. Payments for Stored Materials
The payment clause, FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, in construction contracts requires the Contracting Officer to make a case-by-case review of a contractor's need for progress payments for materials. Payment for materials will normally not be authorized. If they are authorized, they must be in accordance with paragraphs below.
It is not the policy of the Air Force to authorize payment for materials except when material represents a large, high cost, single line item(s) versus large quantities of small dollar materials. Examples of low dollar value materials are lumber, paint, miscellaneous electrical or plumbing supplies, etc. To illustrate, the Air Force may authorize a large transformer valued at $20,000 for payment, but will not authorize $17,000 worth of miscellaneous electrical components.
Payment for materials will be limited to major high cost items only. Work and materials must be stored on site and as such, become the property of the Government, but the contractor is responsible for all materials delivered and work performed until completion and acceptance of the entire construction work. Responsibility of safeguarding material until final inspection and acceptance rests with the contractor. Payment for materials in advance of installation must be made on a separate line item on the AF Form 3064, Progress Schedule.
Section I - Contract Clauses
52.202-1 Definitions JUL 2004
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees APR 1984
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures OCT 2010
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010
52.203-14 Display of Hotline Poster(s) DEC 2007
52.203-15 Whistleblower Protections Under the American Recovery and
Reinvestment Act of 2009
JUN 2010
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 Central Contractor Registration APR 2008
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2010
52.204-11 American Recovery and Reinvestment Act--Reporting
Requirements
JUL 2010
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
DEC 2010
52.211-18 Variation in Estimated Quantity APR 1984
52.215-2 Audit and Records--Negotiation OCT 2010
52.219-6 Notice Of Total Small Business Set-Aside JUN 2003
52.219-8 Utilization of Small Business Concerns JAN 2011
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005
52.222-7 Withholding of Funds FEB 1988
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) JUL 2005
52.222-12 Contract Termination-Debarment FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility FEB 1988
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-26 Equal Opportunity MAR 2007
52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately
Specified Method)
DEC 2001
52.222-35 Equal Opportunity for Veterans SEP 2010
52.222-36 Affirmative Action For Workers With Disabilities OCT 2010
52.222-37 Employment Reports on Veterans SEP 2010
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons FEB 2009
52.222-54 Employment Eligibility Verification JAN 2009
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
DEC 2007
52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.224-1 Privacy Act Notification APR 1984
52.224-2 Privacy Act APR 1984
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-11 Pledges Of Assets SEP 2009
52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
52.228-14 Irrevocable Letter of Credit DEC 1999
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-3 Federal, State And Local Taxes APR 2003
52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002
52.232-17 Interest OCT 2010
52.232-23 Assignment Of Claims JAN 1986
52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984
52.232-27 Prompt Payment for Construction Contracts OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-4 Physical Data APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-4 Changes JUN 2007
52.244-6 Subcontracts for Commercial Items DEC 2010
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2010
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
MAY 2004
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (May 2004) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
JAN 2009
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009
252.204-7000 Disclosure Of Information DEC 1991
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010
252.223-7004 Drug Free Work Force SEP 1988
252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
252.225-7012 Preference For Certain Domestic Commodities JUN 2010
252.227-7022 Government Rights (Unlimited) MAR 1979
252.227-7033 Rights in Shop Drawings APR 1966
252.231-7000 Supplemental Cost Principles DEC 1991
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment MAR 1998
252.244-7000 Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
NOV 2010
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (JAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .