This is a Memorandum for Record documenting Amendment 0002 to Request for Quotation FA445226R0012 for B753 Kitchen Renovation at Scott Air Force Base, Illinois, issued by the 763d Enterprise Sourcing Squadron on 29 July 2026. The amendment updates the Construction RFP Letter, Statement of Work for Kitchen Renovation, Record Drawings appendix, and Pictures of Kitchen appendix, while adding a new Electric Panels appendix. The proposal submission deadline has been extended to 10 August 2026 at 2:00 PM EST. Offerors must acknowledge receipt of this amendment with their quotation submission.
The memorandum addresses 18 questions from prospective contractors following a site visit. Key clarifications include: the refrigerator must be positioned within 15 feet of the sink; the scope includes only walls and ceiling work, not existing refrigerator space; design is not required, only a cabinet layout proposal; wall texture must be smooth and uniform; countertops must be solid surface acrylic; the existing light bar over the sink should be removed and replaced; the wider door may be used for material access; all work must utilize the existing electrical setup; and the current floor coating is to be removed with the manufacturer unknown. Working hours are referenced in the Statement of Work, and the hot water heater and power supply are located in the adjacent mechanical room. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
763D ENTERPRISE SOURCING SQUADRON
SCOTT AIR FORCE BASE ILLINOIS
Mission-focused leaders in agile acquisition…creating innovative, risk-based business solutions.
29 July 2026
MEMORANDUM FOR RECORD
FROM: 763d Enterprise Sourcing Squadron (ESS)/PKS SUBJECT: Amendment 0002 to Request for Quotation (RFQ) FA445226R0012, B753 Kitchen Reno REFERENCE: Request for Quotation (RFQ) FA445226R0012, B753 Kitchen Reno, dated 22 July 2026
1. PURPOSE: The purpose of this Memorandum for Record (MFR) is to document the details of Amendment 0002 to the subject solicitation. This amendment is being issued to:
• Update “FA445226R0012_ConstructionRFPLetter_Amendment 02” (see changes in Red)
• Update “FA445226R0012_SOW_KitchenReno_Amendment 02” (see changes in Red)
• Update “SOWAtch-Appendix A_Record Drawings_Ammendment 02”
• Update “SOWAtch-Appendix B_Pictures of Kitchen_Amendment 02”
• ADD SOWAtch-Appendix D_Electric Panels.
2. Address questions submitted by a prospective contractors from the site visit:
1. Where would you like the refrigerator to be set up since it requires a water line and currently the water line is by the sink?
Within 15 feet of sink.
2. Will this be a 35% design and 65% build?
No.
3. Are existing refrigerators staying?
That space will not be part of the work to be performed. Only the walls and ceiling.
4. Do the cabinets go on the side where the refrigerators currently are?
No.
5. Where is the exterior wall?
It is the Northeast wall.
6. Does design need to be a part of the proposal to be technically acceptable?
No, there will only be a cabinet layout proposed.
7. Can we extend the proposal date?
The proposal will be extended to 10 August 2026 at 2:00 PM EST.
8. Where is the hot water heater?
In the mechanical room, separate from the work space.
9. Where does the power supply come from?
The mechanical room adjacent to the water heater.
10. What texture should the walls be?
Smooth and uniform.
11. Can you elaborate on what counter top type?
Solid surface acrylic.
12. Can you include the amount of cabinets to be included in proposal?
Please see “SOWAtch-Appendix B_Pictures of Kitchen_Amendment 02”
13. Does the government want to keep the existing light bar that is over the sink?
Remove the light bar and replace with over the sink light.
14. Can we use the wider door for access?
Yes for bringing in materials.
15. What are the working hours?
Stated in SOW
16. Is the goal to utilize only the existing electric set up?
Yes.
17. Can we have the panel schedule or a photo?
Please see “SOWAtch-Appendix D_Electric Panels”
18. Who is the manufacturer of the current floor?
Unknown. Current coating is to be removed.
3. CONCLUSION: The amendment will be posted to the standard procurement portal, and all prospective offerors will be notified. All other terms and conditions of the solicitation remain unchanged. Offerors must acknowledge receipt of this amendment with their quotation submission.
AMBER CLIMACO
Contracting Officer
| 2026-07-29T13:56:43-0500 | |
| CLIMACO.AMBER.1402993983 |