FA445222Q0022 - QnR (rev 9-16-22).pdf

PDF 54 KB Posted

Attached to
Security System Installation Services Federal contract opportunity
Solicitation number
FA445222Q0022
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Security System Installation Services, newest first.
File Type Posted
FA445222Q0022 - QnR (rev 9-20-22).pdf PDF
Amendment 01.pdf PDF
Scope of Work - 21STS Security System Installation (rev 9-16-2022).pdf PDF
Front Left Cameras.jpg JPG image
Front Middle Camera.jpg JPG image
Back Left Cameras.jpg JPG image
FA445222Q0022 - QnR.pdf PDF
Back Middle Cameras.jpg JPG image
Back Right Cameras.jpg JPG image
Scope of Work - 21STS Security System Installation.pdf PDF
Combined Synopsis Solicitation- Security System Installation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA445222Q0022

21 STS Security System Installation Services

Questions and Responses

Q1) Are Scaled Drawings available, if so please post.

R1) Drawings are not available

Q2) Are Ceilings Suspended? Or Hard Lid?

R2) Suspended

Q3) Are there existing Cable Trays for wiring above ceilings?

R3) Yes

Q4) Can Existing Wiring be utilized?

R4) No, existing cables are Cat. 5 (Fifteen years old)

Q5) Is a “UPS” required? If so, What Time/Power Duration is required?

R5) Yes/3 hours, whatever your equipment requires

Q6) Are “Or Equal” Equipment substitutions allowed?

R6) Yes

Q7) Is “Plenum Wire” acceptable?

R7) Yes

Q8) Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?

R8) Yes

Q9) What is the height of Exterior Cameras (if any)?

R9) 12 feet or less

Q10) Please provide/post other “Q/A” requests.

R10) All questions received will be provided the Government response via SAM.gov, to ensure all interested parties receive the same information.

Q11) Please provide a list of equipment to be installed.

R11) Refer to the Scope of Work for equipment requiring installation

Q12) The PWS mentions additional conduit. If we are just replacing existing cameras, can we re-utilize the existing pathways?

R12) Yes, the existing pathway can be re-utilized

Q13) If possible, can pictures be posted of the camera locations so bidders can assess heights, obstructions, etc.?

R13) Pictures provided.

Q14) The SOW states, “The following recently procured government equipment is required to be installed:” Installation of the C2 computer must be completed by the vendor/integrator. Can the government confirm what system/manufacturer is being used for cameras and as the Video Management?

R14) The server is an Avigilon NVR4 Value 1U w/24TB of storage space.

Q15) Can the government confirm that there is no cable or equipment required to be procured by the contractor other than the power supply and all other is previously procured by the government?

R15) The Scope of Work has been revised to provide clarity on the Government property that will be required to be installed and is available to the Vendor. All other equipment/supplies required for the installation is the responsibility of the Vendor.

End of Questions and Responses