FA445222Q0022 - QnR.pdf
PDF 51 KB Posted
- Attached to
- Security System Installation Services Federal contract opportunity
- Solicitation number
- FA445222Q0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA445222Q0022 - QnR (rev 9-20-22).pdf | ||
| FA445222Q0022 - QnR (rev 9-16-22).pdf | ||
| Scope of Work - 21STS Security System Installation (rev 9-16-2022).pdf | ||
| Amendment 01.pdf | ||
| Back Right Cameras.jpg | JPG image | |
| Back Middle Cameras.jpg | JPG image | |
| Front Middle Camera.jpg | JPG image | |
| Back Left Cameras.jpg | JPG image | |
| Front Left Cameras.jpg | JPG image | |
| Combined Synopsis Solicitation- Security System Installation.pdf | ||
| Scope of Work - 21STS Security System Installation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA445222Q0022
21 STS Security System Installation Services
Questions and Responses
Q1) Are Scaled Drawings available, if so please post.
R1) Drawings are not available
Q2) Are Ceilings Suspended? Or Hard Lid?
R2) Suspended
Q3) Are there existing Cable Trays for wiring above ceilings?
R3) Yes
Q4) Can Existing Wiring be utilized?
R4) No, existing cables are Cat. 5 (Fifteen years old)
Q5) Is a “UPS” required? If so, What Time/Power Duration is required?
R5) Yes/3 hours, whatever your equipment requires
Q6) Are “Or Equal” Equipment substitutions allowed?
R6) Yes
Q7) Is “Plenum Wire” acceptable?
R7) Yes
Q8) Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?
R8) Yes
Q9) What is the height of Exterior Cameras (if any)?
R9) 12 feet or less
Q10) Please provide/post other “Q/A” requests.
R10) All questions received will be provided the Government response via SAM.gov, to ensure all interested parties receive the same information.
Q11) Please provide a list of equipment to be installed.
R11) Refer to the Scope of Work for equipment requiring installation
Q12) The PWS mentions additional conduit. If we are just replacing existing cameras, can we re-utilize the existing pathways?
R12) Yes, the existing pathway can be re-utilized
Q13) If possible, can pictures be posted of the camera locations so bidders can assess heights, obstructions, etc.?
R13) Pictures provided.
End of Questions and Responses