FA445222Q0022

21 STS Security System Installation Services

Questions and Responses

Q1) Are Scaled Drawings available, if so please post.

R1) Drawings are not available

Q2) Are Ceilings Suspended? Or Hard Lid?

R2) Suspended

Q3) Are there existing Cable Trays for wiring above ceilings?

R3) Yes

Q4) Can Existing Wiring be utilized?

R4) No, existing cables are Cat. 5 (Fifteen years old)

Q5) Is a “UPS” required? If so, What Time/Power Duration is required?

R5) Yes/3 hours, whatever your equipment requires

Q6) Are “Or Equal” Equipment substitutions allowed?

R6) Yes

Q7) Is “Plenum Wire” acceptable?

R7) Yes

Q8) Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?

R8) Yes

Q9) What is the height of Exterior Cameras (if any)?

R9) 12 feet or less

Q10) Please provide/post other “Q/A” requests.

R10) All questions received will be provided the Government response via SAM.gov, to ensure all interested parties receive the same information.

Q11) Please provide a list of equipment to be installed.

R11) Refer to the Scope of Work for equipment requiring installation

Q12) The PWS mentions additional conduit. If we are just replacing existing cameras, can we re-utilize the existing pathways?

R12) Yes, the existing pathway can be re-utilized

Q13) If possible, can pictures be posted of the camera locations so bidders can assess heights, obstructions, etc.?

R13) Pictures provided.

End of Questions and Responses