Performance Work Statement - Joint Exercise Program (JEP)

View the file

Other files

File Type Posted
Government_Responses_to_Follow_On_Questions_for_JEP.pdf PDF
Performance_Work_Statement_JEP_19_Feb_19.pdf PDF
Attachment_7_DD254_JEP.pdf PDF
Attachment_7_DD254_JEP.pdf PDF
Answers_-_FA445219RA003_-_Joint_Exercise_Program_(JEP).pdf PDF
USAF_Air_Mobility_Command_Joint_Exercise_Program,_Solicitation__FA445219RA003.pdf PDF
Answers_to_Questions_for_JEP_Solicitation.pdf PDF
Addendum_to_FAR_52.212-1.pdf PDF
CDRL_A017.pdf PDF
Addendum_to_FAR_52.212-2.pdf PDF
CDRL_A015.pdf PDF
CDRL_A010.pdf PDF
JEP_QASP.pdf PDF
Attachment_2_Past_Performance_Questionnaire.docx DOCX document
CDRL_A007.pdf PDF
CDRL_A005.pdf PDF
Attachment_4_Consent_Form.docx DOCX document
CDRL_A012.pdf PDF
CDRL_A016.pdf PDF
CDRL_A013.pdf PDF
Solicitation_-_FA445219RA003.pdf PDF
Attachment_1_Past_Performance_Information_Sheet.docx DOCX document
CDRL_A002.pdf PDF
CDRL_A004.pdf PDF
Attachment_3_Client_Authorization_Letter.docx DOCX document
CDRL_A008.pdf PDF
CDRL_A009.pdf PDF
Attachment_5_Transmittal_Letter.docx DOCX document
CDRL_A014.pdf PDF
Attachment_7_DD254_JEP.pdf PDF
CDRL_A006.pdf PDF
CDRL_A001.pdf PDF
CDRL_A003.pdf PDF
CDRL_A011.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Exercise Program (JEP)

PERFORMANCE WORK STATEMENT (PWS)

24 January 2019

1.0 DESCRIPTION OF SERVICES

1.1 Background. This requirement is to provide operational, functional and technical support to the Air Mobility Command (AMC) Directorate of Operations (A3) Joint Exercise Division (A3Y) and the 618th Air Operations Center (AOC) Tanker Airlift Control Center (TACC) Director of Global Readiness (XOP), to advise in budgeting, programming, planning, conducting, and reporting AMC participation in Chairman, Joint Chiefs Staff (CJCS), Combatant Command (COCOM), and Joint National Training Capability (JNTC) sponsored exercises. The program includes Command Post Exercises (CPX), Field Training Exercises (FTX), Computer Assisted Exercises (CAX) using the JLVC (Joint Live Virtual Constructive) construct, USTRANSCOM and AMC system testing – either in direct support to USTRANSCOM or in support of AMC/A6 on new releases to AMC systems, seminars, and no-notice interoperability exercises. Many of these exercises require modeling and simulation support to portray activities HQ AMC engages in as part of real world day-to-day air mobility operations. The exercises are used to train the command (defined as HQ AMC, 18th Air Force (18 AF), 618 AOC, 621 CRW and other MAF components) in global joint operations and assess the commands capability to meet air mobility requirements in fast-paced and stressful environments.

1.2 Objectives. This requirement is multi-faceted and is intended to aid AMC/A3Y in developing realistic exercise scenarios and training materials to train the HQ AMC Staff, 18 AF Staff, the 618 AOC (TACC), subordinate AMC units, and supported command staffs, as well as the Joint Staff and service staffs in joint operations with an emphasis on air mobility operations.

Success in achieving these objectives is dependent upon contractor personnel having extensive and current knowledge of air mobility operations and the myriad factors which must be considered in planning joint operations. Contractor employees shall have a minimum of 6 years Mobility Air Forces (MAF) operational experience (either flying or support (Command and Control (C2), Air Evacuation (AE), Logistics, etc.)), in planning and conducting exercises using procedures outlined in the Joint Event Life Cycle (JELC). Contractor knowledge of command relationships, responsibilities, functions and the C2 systems used to conduct joint operations is critical to successful execution of this contract. Contractor employees shall have knowledge of and experience (minimum six years of experience) in using both Joint Operational Planning and Execution System (JOPES) and AMC C2 systems of record is also critical (ref para 9.1).

Other objectives include providing AMC support in coordinating operational requirements to technical planning efforts in creating AMC C2 modeling and simulation data which supports the COCOM and Theater AOC efforts; preparing exercise documentation, participating in exercise planning conferences and troubleshooting execution issues of a technical nature and documenting the results. For the purpose of this requirement, the term “exercise” refers to Joint/Combined Exercises and Air Force Level CAXs and supported is defined as 24 hours a day/7 days a week (24/7) during execution.

1.3 Scope. The contractor shall support AMC in planning (operational, functional and technical) and conducting CPXs and CAXs to train the HQ AMC staff, 18 AF Staff and the 618 AOC (TACC). The contractor shall support AMC/A3Y in developing and maintaining the command Joint Training Plan (JTP) and review AMC Mission Essential Tasks (METs) and the associated conditions and standards on an annual basis. The contractor shall ensure AMC exercise objectives are clearly identified with AMC METs, coordinated with United States Transportation Command (USTRANSCOM), and integrated into the overall exercise scenario to ensure optimum training value. The contractor shall develop, as determined by AMC/A3Y, Exercise Directives, Exercise Briefings, Control Staff Instructions (COSINs), and other training materials and attend planning conferences as directed by AMC/A3Y to coordinate AMC exercise participation with the Joint Staff, Services, and other commands. The contractor shall provide constructive airlift schedules for use in CPXs and CAXs, provide manpower for the AMC Exercise Control Group (ECG) and/or the Exercise Response Cell (ERC). Following each supported exercise involving either the AMC staff, 18AF, 618 AOC (TACC) and MAF Wings and units participation, the contractor shall provide an after-action report to AMC/A3Y. The After-action Report (AAR) shall include appropriate observations in the Joint Lessons Learned Information System (JLLIS) format. The contractor shall develop, with AMC/A3Y, inputs to the USTRANSCOM Hot Wash briefing and after-action items for USTRANSCOM and USAF as needed by AMC/A3Y. The contractor shall provide AMC/A3Y and AMC/FMAT (Financial Management Assessment Team) with annual JEP flying hour and commercial contract cost estimates for the Budget Review (BR) and Program Objective Memorandum (POM) and report actual airlift costs on a monthly basis to the Joint Staff, Services, USTRANSCOM, and exercise sponsoring commands. The contractor shall assist the sponsoring commands in developing their JEP annual airlift budgets as needed for the upcoming two years, maintain an updated estimate of costs for the operating year, and provide AMC/FM with quarterly reports of costs incurred for the past three months and estimated airlift costs for the next three months.

The contractor shall also provide support to AMC/A3Y and HQ AMC/A6I in translating USTRANSCOM and Theater Air Mobility operational requirements into technical planning efforts, loading AMC/C2 modeling and simulation data onto AMC/A6 maintained and provided systems (for example: Global Decision Support System (GDSS), Consolidated Air Mobility Planning System (CAMPS), etc.). Also, prepare exercise documentation and participate in exercise planning conferences as required / directed by AMC/A3Y. Contractor shall coordinate operational and technical exercise-related issues with USTC, AMC, Numbered Air Forces (NAFs), COCOMs, developers, and other organizations. Contractor shall provide operational support for AMC Joint/Combined and Air Force Exercise taskings, to include working with AMC/A6I on the development of accurate technical architecture requirements and drawings.

Contractor shall facilitate troubleshooting of C2 systems outages and communications problems on behalf of AMC/A3Y (operational issues) during relevant Joint/Combined and Air Force exercises.

1.4. Surge. At the discretion of the Contracting Officer Representative (COR) and Contracting Officer (CO), surge dollars may be authorized for periods or tasking requiring immediate or sustained effort deemed out of the ordinary and require the contractor to exceed the hours of operation prescribed in the PWS. An example of this could be contractor support of an added no-notice COCOM exercise event due to changing national interest requiring the contractor to work beyond the normal work hours.

All work to be performed under this CLIN will be identified and approved by the COR and the CO. The CO will request the contractor submit a quote for this effort based on the COR’s determination. The COR and the CO will then evaluate the quote. Upon approval by the COR and the CO, a modification will be issued to exercise the surge CLIN.

The decision of whether or not the work to be performed is chargeable to Surge Hours rests solely with the Government. The COR not approving Surge Hours shall not be construed by the contractor as being a reason for an excusable delay or providing the basis for failing to provide the services required by the contract.

2. Information Technology Services Specific Tasks and Requirements.

2.1 Task 1 – Plan, coordinate, conduct, and evaluate AMC participation in the CEP, JEP and JNTC exercises.

2.1.1 Subtask 1 – Develop and Coordinate Exercise/Training Objectives/Materials. The contractor shall develop exercise/training objectives based on AMC METs. Exercise/training objectives must be approved by the AMC staff and/or subordinate AMC units. The contractor shall support AMC in developing the Joint Training Plan (JTP) and entering data into the Joint Training Information Management System (JTIMS). (A001)

2.1.2 Subtask 2 – Attend and Coordinate Exercise Planning Conferences/Events. The contractor shall coordinate AMC participation in CEP, JEP and JNTC exercises to integrate AMC exercise/training objectives with those of other commands and develop an exercise scenario which provides AMC and other participating commands optimal training value. (A002)

2.1.3 Subtask 3 – Develop the AMC Exercise Directive. The contractor shall support AMC/A3Y in developing the AMC Exercise Directive. The exercise directive may be a formal document for large scale exercises involving significant participation of the AMC staff or more informal documents for smaller exercises which provide training primarily to other commands.

Support AMC in preparing briefings in support of the CEP/JEP/JNTC program. (A003)

2.1.4 Subtask 4 – Develop the Master Scenario Events List (MSEL) and Control Staff Instructions (COSIN). The contractor shall ensure all MSEL events must be coordinated and approved by AMC/A3Y and then coordinated with the exercise sponsoring command to ensure the events are relevant for the training audiences. After the MSELs are coordinated and approved, implementers will be developed to initiate the MSEL event. The MSELs and implementers will be incorporated into the AMC COSIN after coordination with the sponsoring command. (A004)

2.1.5 Subtask 5 – Provide Modeling and Simulation Support. The contractor shall analyze USTRANSCOM validated CPX/CAX Time- Phased Force Deployment Data (TPFDD).

Develop CPX/CAX Airlift Flow Plans using AMC C2 systems of record to simulate deployment and sustainment missions for CPX’s and CAX’s, and other training events. These flow plans shall closely resemble the schedules produced for real world contingencies and may involve a large number of missions. (A005)

2.1.6 Subtask 6 – Conduct the Exercise. The contractor shall establish the AMC ECG to control exercise events and responses and to guide the exercise toward achieving the training objectives. If AMC participation in a CPX/CAX is limited and intended primarily to train AMC subordinate units and other COCOM staffs, an AMC Exercise Response Cell (ERC) will be required and contractor staffed if required by HQ AMC/A3Y. The contractor shall man at least one ECG/ERC position during the full period of the exercise as determined by AMC/A3Y, if required. Monitor the airlift mission flow and make adjustments as required by AMC/A3Y and player elements in AMC C2 system of record: GDSS.

2.1.7 Subtask 7 – Contractor shall participate in and prepare responses for the after-action and lessons-learned reporting process. Contractor shall participate in the execution of the National Exercise Program (NEP), Chairman’s Exercise Program (CEP), the Joint Exercise Program (JEP) exercises and USTRANSCOM and AMC system testing as determined by AMC/A3Y. After-action reports and lessons-learned reports shall be submitted. (A017)

2.1.8 Subtask 8 – Exercise Assessment. Contractor shall provide support in developing an assessment plan when required by AMC/A3Y. For larger exercises involving AMC staff participation, the assessment plan may be included as an appendix to the Exercise Directive. The contractor shall provide an evaluation of AMC participation and responses to exercise events.

The evaluation shall be linked to AMC METs. Exercise assessments shall also comment on the actions of other commands as they relate to the AMC mission. The contractor shall be required to submit an after-action report and support AMC in providing inputs to the USTRANSCOM and HQ AF Hot Wash briefings and the final Joint AAR. (A006)

2.1.9 Subtask 9 – Conduct JNTC/ JNTC related exercises for the 34th Combat Training Squadron (CTS) at Little Rock AFB and other JNTC exercises. The contractor shall aid in planning and executing all phases of selected JNTC/other related exercises to include arranging training and training materials for participants prior to the exercise and conducting After Action Reporting to AMC/A3Y. Contractor will aid AMC/A3Y in the development, writing and staffing of JNTC funding vehicles. The contractor shall also staff the JRTC Operations Center or other applicable exercise venues/locations to monitor and control exercise activities, provide load planning and other mobility and logistics support, act as an Observer-Trainer (O-T) when needed, act as the AMD/CRG subject matter expert, and role play for AMC/A3Y and any other requisite AMC Staff functions (i.e., role playing Inter-Governmental Agencies (IGAs)/Non- Governmental Organizations (NGOs)). Mobility monitoring will be with the applicable AMC C2 systems. Contractor personnel supporting 34th CTS will be stationed at Little Rock AFB and will accomplish multiple TDYs in support of the exercises. Other JNTC exercises supported by this contract may take place at HQ AMC and could include but are not limited to: RED FLAG, VIRTUAL FLAG, and other service sponsored exercises which may be added to the JNTC program.

2.1.10 Subtask 10 – Phasing. Key Personnel: Identify the necessary key positions and provide generic resumes/job descriptions which demonstrate requisite education, experience, security clearance level and special skills needed to perform the intended PWS task(s). The contractor shall provide a Startup, Phase in/Phase Out Plan. Provide assurance of ability to perform the requirements of the PWS and the ability to perform all duties starting on day one of the contract.

2.1.11 Phase-In

2.1.11.1 Transition costs will not be paid under this contract; although, the successor contractor may access facilities to familiarize supervisors, key personnel and staff with equipment, reporting, work scheduling and procedures. However, such access shall not interfere with the production efforts of current personnel. To preclude such interference, arrangements for access to Government facilities shall be made with the COR and CO.

2.1.11.2 The successor contractor shall be fully capable of providing all services outlined in the PWS by the start of the contract Period of Performance of 1 April 2019.

2.1.11.3 Access to Government computer systems requires additional national agency clearance checks. Common Access Cards (CAC) require background checks prior to issuance to successor contractor personnel. The process for this includes submitting personal information for each applicant to the Government's Trusted Agent for input into the Trusted Associate Sponsorship System (TASS). Successor contractor employees must clear a background security check before being issued a CAC. To avoid delays in starting work, it is imperative that the successor contractor, at the earliest possible time prior to contract start date, be proactive in submitting applications for personnel security clearances.

2.1.12 Phase-Out

2.1.12.1 The contractor shall provide a phase-out plan describing the method of transferring responsibility for tasks described in the PWS, to be submitted to the COR 90 days prior to the end of the final period of performance. The contractor shall cooperate fully with the Government and any successor contractor(s) to ensure an orderly transition through the end of this contract.

2.2 Task 2 – Coordinate with HQ AMC to Develop JEP Airlift Cost Estimates and Reports.

2.2.1 Subtask 1 – Develop JEP Airlift Cost Estimates. The contractor shall support the Joint Staff and COCOMs in developing airlift budget estimates for the upcoming two years.

COCOMs are to enter this data into the JTIMS. Provide revised airlift estimates as COCOMs revise their programs to remain within the funding targets provided by the Joint Staff. Maintain a data base of planning factors used to estimate airlift costs and an archive of historical exercise airlift costs. Required estimates are due annually by the Joint Staff’s Program Objective Memorandum (POM) cycle. (A007)

2.2.2 Subtask 2 – Report Actual JEP Airlift Costs Monthly. Chairman, Joints Chiefs of Staff Instruction (CJCSI) 3511.01 requires AMC to report JEP airlift costs on a monthly basis to the

Joint Staff, Services, and scheduling COCOMs. The contractor shall prepare this report for AMC/A3Y approval and release. (A008)

2.2.3 Subtask 3 – Provide AMC/FMAT Quarterly Reports of JEP Airlift Costs and Estimates for the Upcoming Quarter. AMC must provide the Joint Staff an estimate of JEP Military Interdepartmental Purchase Request (MIPR) requirements at the beginning of each quarter. The contractor shall provide this estimate based on data contained in JTIMS; the JTIMS cost information is frequently out of date, thus the contractor may have to contact COCOMs to obtain the most recent cost estimates. (A009)

2.2.4 Subtask 4 – Provide AMC/FMAT annual BR/Program Objective Memorandum (POM) Estimated JEP Flying Hours/Airlift Costs for BR/POM Years. Estimate the number of flying hours, by aircraft type, by operating command, and the estimated commercial contract and Commercial Ticket Program (CTP) costs for the two upcoming BR years and the five POM years. Input shall be based on Joint Staff guidance provided at the two annual World Wide Joint Training Conferences and COCOM flying hour and cost estimates developed jointly by AMC and the COCOM and constrained by Joint Staff funding targets. (A010)

2.3 Task 3 – Provide AMC C2 Modeling and Simulation Data

2.3.1 Subtask 1 – Provide AMC C2 Modeling and Simulation Data. The contractor shall coordinate operational requirements to technical planning efforts. Create AMC/C2 modeling and simulation data; prepare exercise documentation; participate in exercise planning conferences as directed by AMC/A3Y and troubleshoot execution issues of a technical nature, documenting results. The contractor shall coordinate with USTRANSCOM/J3-TR (USTC/J3-TR) on C2 requirements and provide AMC/C2 modeling and simulation data for AMC participation in Joint and Air Force exercises 30 days prior to exercise start. (A011)

2.3.2 Subtask 2 – Coordinate exercise related issues. Contractor shall coordinate exercise-related issues with USTC, AMC, NAF, COCOM, developers, and other organizations. The contractor shall maintain a list of exercise points of contacts (POCs). (A016)

2.3.3 Subtask 3 – Development of Architecture Requirements. Contractor shall provide support for AMC Joint Exercise taskings, to include working with AMC/A6I on the development of accurate architecture requirements and drawings. (A012)

2.3.4 Subtask 4 – Coordinate with AMC/A6I to determine the AMC C2 equipment requirements to perform various C2/In-transit Visibility (ITV) functions. Requirements for the connectivity must be delivered no later than (NLT) 14 calendar days after final planning conference. (A013)

2.4 Task 4 – Enterprise Management Controls.

2.4.1 Subtask 1 – Monthly Status Report (MSR). Provide the AMC/A3Y Contracting Officer’s Representative (COR) a MSR which summarize major activities conducted over the past month and major activities planned for the upcoming month. (A014)

2.4.2 Subtask 2 – Travel Trip Report. Provide the COR a travel trip report which shall summarize travel completed during the past month and planned travel for the upcoming month.

(A015)

3. Services Summary (SS)

The Services Summary table below summarizes the most important performance objectives and corresponding performance thresholds as identified within the body of the PWS. The absence of any performance objective and threshold from this Services Summary shall not detract from its enforceability nor limit the rights or remedies of the Government under any provision of the contract. Metrics shall be calculated monthly unless otherwise specified. (*CDRL = Contract Data Requirements List)

Performance Objective PWS Para Performance Threshold Develop and coordinate exercise/training objectives

2.1.1 95% on-time compliance IAW PWS Task 1, Subtask 1, Para 2.1.1, and NLT due date established in CDRL A001

Attend and coordinate exercise planning conferences

2.1.2 95% on-time compliance; required documents submitted NLT due date established in PWS para’s 2.1.2 and 4a, and CDRL A015

Develop the AMC Exercise Directive 2.1.3 100% on-time compliance; required documents submitted NLT due date established in CDRL A003, an average of not more than one clerical error per page, not more than one substantive error per five pages.

Develop Master Scenario Events List and Control Staff Instructions

2.1.4 95% on-time compliance; required documents

A004.

Provide modeling and simulation support

2.1.5 100% on-time compliance; required documents submitted NLT due date established in CDRL A005, Airlift Flow Plans include 90% of aggregated TPFDD requirements.

Exercise assessment 2.1.8 95% on-time compliance; required documents submitted NLT due date established in CDRL’s A006 and A017.

Develop JEP Airlift Cost Estimates 2.2.1 95% on-time compliance; required documents

A007.

Report actual JEP airlift costs monthly

2.2.2 100% on-time compliance; required documents submitted IAW PWS Task 2, Subtask 2.2.2, and NLT due date established in CDRL A008, report produced within 30 days of the end of the operating month, cost data at least 95% accurate.

Provide BR/POM input for the JEP 2.2.4 95% on-time compliance; required documents

A010.

Coordinate operational requirements to technical planning efforts

2.3.1 95% on-time compliance; required documents submitted IAW PWS Task 3, Subtask 1, para 2.3.1, and NLT due date established in CDRL A011, 98% accurate per period of performance where technical support results in delayed or interrupted exercise execution.

Develop accurate architecture requirements and drawings

2.3.3 95% on-time compliance; required documents submitted IAW PWS Task 3, Subtasks 3 and 4, para’s 2.3.3 and 2.3.4, and NLT due date established in CDRL A012, 98% accurate per period of performance where technical support results in delayed or interrupted exercise execution.

Coordinate C2/ITV Equipment Requirements

2.3.4 95% on-time compliance; required documents submitted IAW PWS Task 3, Subtask 4, para 2.3.4, and NLT due date established in CDRL A013.

Monthly Status Reports 2.4.1 95% on-time compliance; required documents submitted IAW PWS Task 4, Subtask 1, para 2.4.1, and NLT due date established in CDRL A014.

Travel Trip Report 2.4.2 95% on-time compliance; required documents submitted IAW PWS Task 4, Subtask 2, para 2.4.2, and NLT due date established in CDRL A015.

4. PLACE OF PERFORMANCE. The primary place of performance for the JEP Support Tasks 1 and 2 of this contract will be the contractor’s facility which must be within a 15 mile commuting distance to HQ AMC, Scott AFB, IL. The contractor facility must be certified for storage of classified documents, computer discs and hard drives at the SECRET level. Frequent visits to Scott AFB to accomplish PWS requirements will be required. The primary place of performance for Task 3 of the JEP Support - Provide AMC C2 Modeling and Simulation Data – will be HQ AMC/A3Y work area. AMC/A3Y may require contractor personnel to travel.

Exercise GREEN FLAG JNTC - Work will be primarily performed at Little Rock AFB, AR with a requirement for contractor personnel to travel to Ft. Polk, LA for up to 8 GREEN FLAG exercises per year. Contractors may also be required to travel to Scott AFB, IL to attend the

Contingency Response Operations Workshop, the Contingency Response Commander’s Conference, and JNTC exercise planning conferences at other locations.

a. The contractor will be required to travel to support the objectives of this contract, as described in the table below. At least five working days prior to the travel start date, the contractor shall submit a travel itinerary to the COR. The COR will confirm the need for travel and the Contracting Officer will confirm funds are available. The contractor will monitor all non-local expenditures and provide expense status to the COR in the monthly Status Report.

b. The contractor will normally travel on the same dates and times and be billeted at the same location as other team members to the maximum extent possible. The contractor is responsible for its employee travel arrangements. If the requirements of non-local travel change, the Government shall request a price proposal from the Contractor and following negotiations, changes will be made via contract modification issued by the Contracting Officer.

c. The contractor shall perform local travel between the contractor’s facility and Contractor place of performance during the performance period of this Contract. The Government will not reimburse local travel and related expenses to the contractor for ordinary daily travel to or from work at the Contractor’s place of performance. Local travel is defined as 100 miles or less one way.

d. Anticipated Travel Requirements:

Required Area of

Travel From Required Travel

To Required # of Trips Annually

Travelers Required Number of Days Per

Trip Scott AFB, IL CONUS* 8 1 5 days Little Rock AFB, AR Ft. Polk, LA 6 2 10 days Little Rock AFB, AR Ft. Polk, LA 8 2 3 days Little Rock AFB, AR Scott AFB, IL 4 2 4 days Scott AFB, IL CONUS (JNTC) 5 1 7 days

*CONUS = Continental United States

Any additional travel requirements will be negotiated on an as needed basis.

5. PERIOD OF PERFORMANCE.

Anticipated period of performance is a six month base period, four 12 month options, and one six month option.

6. DATA DELIVERABLES

The contractor shall provide deliverables via electronic means to the COR. The contractor shall deliver all products and reports in the current AMC version of Microsoft (MS) Word, MS

Project, MS PowerPoint, MS Excel, MS Access, or Adobe Acrobat. Products and documentation delivered under this PWS become the property of the Government.

Table 1: Data Deliverables The following deliverables shall be provided IAW Exhibits A-M:

CDRL Deliverable Title PWS Para

A001 AMC Exercise/Training Objectives 2.1.1 A002 Planning Conference Reports 2.1.2 A003 AMC Exercise Directive 2.1.3 A004 MSEL and COSIN 2.1.4 A005 CPX/CAX Airlift Flow Plans 2.1.5 A006 Exercise Assessment 2.1.8 A007 JEP Airlift Cost Estimates 2.2.1

A008 Actual Monthly JEP Flying Hour/Airlift Costs

2.2.2

A009 Quarterly JEP Costs and Estimates Report

2.2.3

A010 Budget Review/Program Objective Memorandum Estimate

2.2.4

A011 Provide AMC C2 M&S Data 2.3.1 A012 Architecture Requirements and

Drawings 2.3.3

A013 C2/ITV Equipment Requirements 2.3.4 A014 Monthly Status Report 2.4.1 A015 Travel Trip Report 2.4.2 A016 Exercise POC List 2.3.2 A017 AAR’s and Lessons-learned reports 2.1.7

7. SECURITY. This contract will require access to and production of materials classified up to and including the level of SECRET. Contractor personnel will require a minimum of a SECRET clearance and a TOP SECRET clearance is required for at least two of the contractor personnel in support of the JEP 2.1 tasks. DD Form 254 Department of Defense Contract Security Classification Specification provides security classification guidance to the contractor. The contractor shall comply with applicable instructions provided in the DD Form 254 and DOD/AF security regulations when handling classified material.

7.1 All personnel requiring Top Secret access under this contract shall undergo a favorably adjudicated Single Scope Background Investigation (SSBI) as a minimum investigation. The SSBI will be maintained current within 5-years and requests for Special Background Periodic Review (SBPR) will be initiated prior to the 5-year anniversary date of the previous SSBI or

SBPR.

7.2 All personnel requiring Secret access under this contract shall undergo a favorably adjudicated Tier 3 Investigation formerly known as a National Agency Check, Local Agency

Check and Credit Check or Access National Agency Check and Inquiries as a minimum investigation. The Tier 3 Investigation will be maintained current within 10-years and requests for Secret Periodic Reinvestigations will be initiated by submitting a Tier 3R investigation prior to the 10-year anniversary date of the previous Tier 3 Investigation.

7.3 Contractor Responsibilities while Working within Controlled or Restricted Areas. Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Scott AFB requires the issuance of an AF Form 1199C. The Government, at any time, may revoke the AF Form 1199C. The procedures for the issuance of an AF Form 1199C are contained in SAFB Integrated Defense and Antiterrorism Plans. Contractors shall fulfill, maintain, and comply with all security requirements contained in SAFB Integrated Defense and Antiterrorism Plans.

7.4 Contractor employees will be required to comply with all Government security regulations and requirements. Initial and periodic safety and security training and briefings will be provided by Government security personnel. Failure to comply with Government security regulations and requirements will require the company to provide the Government with a written remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract.

7.5 Access to Installation during Force Protection Conditions (FPCONs). Contractors shall be assigned a mission essential designation IAW the SAFB Integrated Defense and Antiterrorism Plans. Only the installation commander or the unit commander requesting contract support shall assign the mission essential designation. The personnel performing work on this contract are not considered mission essential.

7.6 Contractor shall not employ persons to perform under this contract if such employee is deemed or identified by the host base as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by Law Enforcement Agency Data System (LEADS) through the National Crime Information Center. LEADS checks will verify if a person is wanted by local, state, and federal agencies. All contractor and subcontractor personnel must consent to LEADS background checks. Contractor and subcontractor personnel who do not consent to LEADS check will be denied access to the installation. Information required to conduct a LEADS check includes: full name, driver's license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. Contractor must have this information ready to provide to the Installation Visitor Control Center, if requested.

7.7 The contractor shall not divulge any information about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge which may be gained, to anyone who is not authorized to have access to such information. The contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

7.8 763 Specialized Contracting Squadron (763 SCONS) retains the right to request removal of contractor personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government. Contractor must ensure their employees and those of their subcontractors have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities.

7.9 All contractor deliverables shall be marked in accordance with DoDM 5200.1, Vol. 3, Vol. 4, Information Security, DoD 5400.07, Freedom of Information Act Program, unless otherwise directed by the Government. The contractor shall comply with the provisions of the DoD Industrial Security Manual for handling classified material and producing deliverables. The contractor shall comply with Defense Information Systems Agency (DISA) Instruction 630-230- 19.

8. GOVERNMENT-FURNISHED INFORMATION. The Government will provide the contractor access to Air Force and Department of Defense publications, directives, and policy letters relevant to this contract. The Government will also provide the contractor with exercise planning data and SIPRNET access required to complete work on this contract. The Government will arrange meetings, working groups, visits, and interviews with applicable organizations and personnel in support of this contract and notify contractor personnel of required attendance.

9. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS. This contract is funded by two sources and will be incrementally funded. Starting in FY09, the Joint Staff changed the way the JEP/JNTC programs were funded. Unless otherwise stated, USTRANSCOM will fund the JEP Labor and Travel contract costs from their HQ T&E line.

This funding will be direct from USTC to 763SCONS and on a timeline agreed upon between USTC and the SCONS. For the JNTC contract costs, HQ AMC is expecting to fund Semi- Annually by the Air Staff via a Funding Authorization Document (FAD) from the JNTC program and the distributions are not equal. As funds become available, AMC will move the funds to 763 SCONS for contract obligation. Full funding of the contract is expected to occur prior to the end of the Period of Performance (PoP).

9.1 Knowledge and Experience: Contractor employees must be proficient and experienced (minimum six years of experience) in the use of CAMPS, GDSS (G2) and EMC and be able to produce large-scale airlift flow plans using the flow-planning component (auto scheduler) of CAMPS. The contractor should also have knowledge of the use of the Joint Feasibility Analysis System for Transportation (JFAST), Integrated Data Environment (IDE) Global Transportation Network (GTN) Convergence (IGC) Exercise System (IES), Single Mobility System (SMS), and their linkages to theater C2 systems to include the Air War Simulator (AWSIM) and Theater Battle Management Core System (TBMCS). A basic knowledge of the Joint Theater Logistics System (JTLS) and Joint Deployment Logistics Model (JDLM) are also required. Contractor personnel should be proficient in Microsoft Word, Excel, and PowerPoint.

9.2 Email Encryption: The Contractor is required to have company email encryption to allow for documents and information with Personally Identifiable Information (PII) to flow between

AMC/A3Y and the contractor in a secure manner. Examples of documents with PII would be Letters of Invitation (LOIs) and CAC card information.

9.3 Physical Security. The contractor shall safeguard all government-owned equipment and materials in the contractor’s possession or used in the day-to-day performance of the contract.

The Government will not be held accountable/responsible for any contractor items which may have been lost or stolen. Responsibility for the contractor's compliance with internal security at the site shall be assigned to the contractor. All contractor personnel shall be briefed on site security operating procedures prior to or upon commencement of contract award and shall be debriefed upon termination. The Government shall be responsible for all continuing security training of the contractor.

9.4 Identification of Potential Conflicts of Interest (COI). In order for the Government to try to prevent conflicting roles which might bias a contractor’s judgment or objectivity and potentially create a competitive advantage for the contractor, the parties to this contract agree the contractor’s future contracting with the Government shall be restricted as outlined in Federal Acquisition Regulation (FAR) Subpart 9.5, Organizational Conflicts of Interest.

9.5 This contract does not involve providing the contractor with proprietary information;

however, it does involve classified information which must be safeguarded IAW pertinent DoD and USAF guidance. Classified work, if required, will only occur at a US Government facility or at another contractor’s cleared facility.

9.6 Contractor Manpower Reporting (CMRA). The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the AMC/A6OA via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.

*Reporting Period: Contractors are required to input data by 31 October of each year. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

9.5 Non-Personal Services and/or Inherently Governmental Services. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to http://www.ecmra.mil/ http://www.ecmra.mil/ guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the contract PCO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.

The Services Summary table below summarizes the most important performance objectives and corresponding performance thresholds as identified within the body of the PWS. The absence of any performance objective and threshold from this Services Summary...