This is a Questions and Answers (Q&A) document for federal solicitation FA442724Q0029, MFT 26-71 – Ground Transportation Car Wash. The document addresses 11 inquiries from potential offerors regarding the scope of work, facility conditions, and technical specifications for replacing and upgrading a car wash system at Facility 129.
Key clarifications provided include: the blower system will remain operational with no contractor work required; the undercarriage wash portion will be removed and not replaced; an oil water separator is needed without hazardous chemical injections, utilizing existing OWS lines; the existing electrical capacity is sufficient for the 60 HP pump station; an existing natural gas line is available; and the wash bay floor is in good condition with a 14-foot door opening width requiring no additional concrete or slab work. The system will operate as a manual drive-through with stationary guide rails (approximately 80 feet) remaining in place; drivers will engage the system via key, barcode, or QR code, with activation triggered by photosensors as vehicles pass. Functionally equivalent systems from established touchless fleet wash manufacturers are acceptable, not requiring a specific basis-of-design manufacturer. The new pre-wired NEMA 4X wash control center will completely replace all existing controls, wiring, and panels. The control system must be standalone and air-gapped with no network connectivity, operating via driver engagement with photosensor activation. Site survey reports and facility as-built drawings are unavailable due to data loss, but photographic attachments showing carwash components and electrical systems are provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MFT 26-71 – Ground Transportation Car Wash
Solicitation FA442724Q0029 Questions/ Responses
1. Please confirm the Blower System is to remain as is with no work required from the contractor.
Response: The blower system will remain as it is because it is fully functional.
2. Please confirm the Undercarriage Wash portion of the existing system should be removed and NOT replaced.
Response: The Undercarriage Wash portion will not be replaced.
3. Please provide further clarification regarding the ESD-manufactured Oil Water Separator that was not mentioned in the SOW.
Response: An Oil Water Separator is needed but without hazardous chemical injections.
4. Can the Government provide the Site Survey Report referenced in SOW 2.2, along with any as-built drawings of Facility 129 showing existing electrical service (voltage/amperage/panel capacity), water supply line size and pressure, natural gas service, and drainage/OWS tie-in locations?
Response: The site survey report is not available. Facility drawings are not available due to data loss in the CE IT system; however, photos are provided as an attachment to this Q&A.
5. What are the interior clear dimensions of the wash bay (length, width, door opening height) and floor condition?
Is any concrete/slab work, trenching, or floor drain modification anticipated or permitted?
Response: The floor condition is in great working order with no additional work expected. The width of the door opening is 14ft. Review attachment for a pictorial of Carwash components.
6. What is the available electrical capacity at Facility 129? Will the existing service support a 60HP pump station and associated equipment, or should offerors price a service upgrade or new panel? If an upgrade is needed, is that within scope?
Response: The existing electrical capacity will be sufficient.
7. Is there an existing natural gas line to the facility adequate to serve the specified hot water heater, or must gas service be extended/installed as part of this effort?tion 4.1.4 of the SOW lists specific water requirements. Is the government requesting the vendor to provide a reimbursement to obtain a water system meeting these specifications?
Response: There is an existing natural gas line
8. SOW references an above-ground OWS as new equipment, while the evaluation criteria reference integration with the facility’s “existing oil-water separator lines.” Please clarify: is the contractor connecting to an existing OWS system, replacing it entirely with the new above-ground unit, or both?
Response: The contactor will utilize the existing OWS lines.
9. Regarding vehicle movement through the wash bay:
(a) Does the existing system utilize a conveyor, or do drivers manually drive vehicles through along stationary guide rails?
Response: Drivers will drive through manually.
(b) If a conveyor exists, is it a push-type or pull-type, and is it a surface-mounted or over/under configuration?
Response: N/A
(c) Please confirm whether the replacement system specified in Technical Exhibit 1 (“One (1) Set of Guide Rails, approx. 80 feet”) is intended as a drive-through system with guide rails only, with no conveyor required.
Response: The existing guide rails would remain.
10. Is a specific manufacturer or basis-of-design system intended, given the highly specific equipment list in Technical Exhibit 1 (e.g., 15-spinner high-pressure arch, 300 GPM reclaim)? Will functionally equivalent systems from other established touchless fleet wash manufacturers be considered acceptable?
Response: Yes, equivalent systems will be acceptable.
11. Regarding the wash control system:
(a) What make and model is the existing wash controller / relay control board (e.g., a PLC-based wash control center, relay logic panel, or timer-based controls at the motor control center)?
Response: The make and model of carwash components are not know; however, please review attachment.
(b) Please confirm that the “Pre-wired NEMA 4X wash control center (WCC)” listed in Technical Exhibit 1 is intended as a complete replacement of all existing controls, and that no existing control components, wiring, or panels are to be reused.
Response: Yes, complete replacement.
(c) Does the Government have a preference or requirement for the control architecture of the new WCC (PLC-based vs. relay logic vs. timer-based), or is any commercial control system acceptable provided it operates the specified equipment and supports the arm/disarm push button station with emergency stop Response: The system should operate the same: driver would engage system with vil key or bar code/QR code, system will activate as vehicle drives past the photosensors
(d) Are there any base or facility requirements for the new control panel regarding network connectivity, remote monitoring, or cybersecurity compliance (e.g., must the system be fully standalone/air-gapped, or is network connection permitted/required)?
Response: The previous system was a standalone system that did not rely on base network connectivity. The system shall be standalone/air gapped.
Photo Attachment-1
Carwash Control Room:
Photo Attachment-2
Car Wash Control Room Electrical: