The document is a Looped Air Distribution System Diagram for Building 167, detailing the air compressor system layout. The diagram shows a comprehensive floor plan with nine air drop locations (D1-D9) connected by a red air pipe network, originating from a centrally located compressor. The system is designed for a facility, likely a maintenance training area, with the compressor strategically positioned to service various rooms including mechanical spaces, halls, offices, and storage areas.
The diagram is part of a federal contract opportunity (Solicitation Number: FA442725Q1041) by the Department of the Air Force Air Mobility Command, seeking a contractor to provide and install a KC-46 Maintenance training system Air Compressor for Advance Hardware Training Devices (AHTD) operations. The solicitation requires the contractor to install a central air compressor adhering to specific installation standards, with a mandatory site visit scheduled for 10 March 2025 at Travis AFB, where contractors must obtain a visitor pass and be escorted to the work location.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Distribution System Diagram For Building 167 Air Compressor
Looped Air Distribution System Diagram
D8
D7
D6
D5
D4
D3 D2
Compressor
Drop Locations D1-D9 Air Pipe
D1
Compressor Location
D9