3-0 ATCH 1 SPECIFICATIONS 01650
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAVIS AFB - SAB'
SECTION 01650
STARTING OF SYSTEMS
1. GENERAL
1.1REQUIREMENTS INCLUDED
1.1.1. Procedures for starting of mechanical systems.
1.2 RELATED REQUIREMENTS
e Contract FA4427-1O-R-0102
A. Section 01400 & 01440 - Quality Control & Contractor's QC
B. Section 01600 - Material and Equipment
C. Section 01660 - Testing, Adjusting, and Balancing of Systems.
D. Individual Sections: Specific requirements for start-up.
1.3 QUALITY CONTROL
1.3.1. When specified in individual Sections, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment installation prior to start-up; to supervise placing equipment in operation; and to provide a written report that equipment has been properly installed and lubricated, is in accurate alignment, is free from any undue stress imposed by connecting lines or anchor bolts, and has been satisfactorily operated under full load conditions.
1.4 SUBMITTALS
1.4.1. Submit preliminary schedule listing times and dates for start-up of each item of equipment in sequence two days prior to proposed dates.
1.4.2. Submit manufacturer's representative reports within one week after start-up, listing satisfactory start-up dates.
1.5 PROJECT CONDIT10NS
A. Building enclosure is complete and weather tight.
B. Excess packing and shipping bolts are removed.
C. Interdependent systems have been checked and are operational.
TRAVIS AFB - SABER
2. EXECUTION
2.1. Verify that Project conditions comply with requirements.
Contract FA4427-1O-R-0102
2.2. Verify that status of work meets requirements for starting of equipment and systems.
3, PREPARATION
3.1. Coordinate sequence for start-up of various items of equipment, including owner provided equipment.
3.2. Notify Contracting Officer two days prior to start-up of each item of equipment.
3.3. Have contract documents, shop drawings, product data, and operation and maintenance data at hand during entire start-up process.
3.4. Verify that each piece of equipment has been checked for proper lubrication, drive rotation, belt tension, control sequence, and other conditions which may cause damage.
3.5. Verify control systems are fully operational in automatic mode.
3.6. Verify that tests, meter readings, and specific electrical characteristics agree with those specified by electrical equipment manufacturer.
3.7. Verify wiring to motors and controls required by mechanical work for operational smoke and fire protection demonstrations is complete.
3.8. Verify wiring and support systems for equipment installed under separate contracts is complete and checked.
3.9. Bearings: Inspect for cleanliness; clean and remove foreign matter. Verify alignment;
take corrective measures.
3.10. Drives: Inspect for tension on belt drives, adjustment ofvaripitch sheaves and drives, alignment, proper equipment speed, and cleanliness. Take corrective action.
3.11. Motors: Verify that motor amperage agrees with nameplate value. Inspect for conditions which produce excessive current flow and which exist due to equipment malfunction. Take corrective action.
4. STARTING SYSTEMS
4.1. Execute start-up under supervision of responsible manufacturer's representative or contractor personnel.
_ ..------- -------------------------ew
TRAVIS AFB - SAB'
e
Contract FA4427-1O-R-OI02
4.2. Place equipment in operation in proper sequence in accordance with sequencing schedule.