3-0 ATCH 1 SPECS 01650 10-R-0102 SABER.pdf

PDF 99 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER) Federal contract opportunity
Solicitation number
FA4427-10-R-0102
Issued by
Department of the Air Force Air Mobility Command

About this file

3-0 ATCH 1 SPECIFICATIONS 01650

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
Pre-Bid Conference Site Visit Attendee List.pdf PDF
DSC_0687.JPG JPG image
DSC_0691.JPG JPG image
DSC_0684.JPG JPG image
DSC_0688.JPG JPG image
DSC_0685.JPG JPG image
Updated 4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 33-34.pdf PDF
D4-2 DRAWING 33 —
D3-4 DRAWING 25 —
D4-0 DRAWING 31 —
D3-1 DRAWING 22 —
D4-6 DRAWING 37 —
D3-2 DRAWING 23 —
D4-5 DRAWING 36 —
D3-3 DRAWING 24 —
D3-6 DRAWING 27 —
D3-0 DRAWING 21 —
D2-5 DRAWING 16 —
D2-1 DRAWING 12 —
D1-1 DRAWING 2 —
D1-4 DRAWING 5 —
D1-3 DRAWING 4 —
D2-6 DRAWING 17 —
D1-2 DRAWING 3 —
D1-6 DRAWING 7 —
D2-7 DRAWING 18 —
D1-9 DRAWING 10 —
1-4 ATCH 1 SPECS 01030 10-R-0102 SABER.pdf PDF
1-1 ATCH 1 SPECS COVER PAGE 10-R-0102 SABER 26 APR 10.pdf PDF
1-0 FA4427-10-R-0102 SABER SOLICITATION 7 MAY 2010.pdf PDF
2-2 ATCH 1 SPECS 01301 10-R-0102 SABER.pdf PDF
3-3 ATCH 1 SPECS 01800 10-R-0102 SABER.pdf PDF
2-0 ATCH 1 SPECS 01100 10-R-0102 SABER.pdf PDF
4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
3-4 ATCH 1 SPECS DIV 02 thru 25 10-R-0102 SABER.pdf PDF
1-9 ATCH 1 SPECS 01090 10-R-0102 SABER.pdf PDF
1-2 ATCH 1 SPECS TABLE OF CONTENTS 10-R-0102 SABER 26 APR 10.pdf PDF
2-9 ATCH 1 SPECS 01600 10-R-0102 SABER.pdf PDF
4-2 ATCH 8 Subcontractor Teaming Consent Form 10-R-0102 SABER.pdf PDF
1-7 ATCH 1 SPECS 01045 10-R-0102 SABER.pdf PDF
4-3 ATCH 9 Government Furnished Property Info 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet —
3-2 ATCH 1 SPECS 01700 10-R-0102 SABER.pdf PDF
1-3 ATCH 1 SPECS 01010 10-R-0102 SABER.pdf PDF
2-1 ATCH 1 SPECS 01300 10-R-0102 SABER.pdf PDF
2-5 ATCH 1 SPECS 01440 10-R-0102 SABER.pdf PDF
1-8 ATCH 1 SPECS 01060 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS AFB - SAB'

SECTION 01650

STARTING OF SYSTEMS

1. GENERAL

1.1REQUIREMENTS INCLUDED

1.1.1. Procedures for starting of mechanical systems.

1.2 RELATED REQUIREMENTS

e Contract FA4427-1O-R-0102

A. Section 01400 & 01440 - Quality Control & Contractor's QC

B. Section 01600 - Material and Equipment

C. Section 01660 - Testing, Adjusting, and Balancing of Systems.

D. Individual Sections: Specific requirements for start-up.

1.3 QUALITY CONTROL

1.3.1. When specified in individual Sections, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment installation prior to start-up; to supervise placing equipment in operation; and to provide a written report that equipment has been properly installed and lubricated, is in accurate alignment, is free from any undue stress imposed by connecting lines or anchor bolts, and has been satisfactorily operated under full load conditions.

1.4 SUBMITTALS

1.4.1. Submit preliminary schedule listing times and dates for start-up of each item of equipment in sequence two days prior to proposed dates.

1.4.2. Submit manufacturer's representative reports within one week after start-up, listing satisfactory start-up dates.

1.5 PROJECT CONDIT10NS

A. Building enclosure is complete and weather tight.

B. Excess packing and shipping bolts are removed.

C. Interdependent systems have been checked and are operational.

TRAVIS AFB - SABER

2. EXECUTION

2.1. Verify that Project conditions comply with requirements.

Contract FA4427-1O-R-0102

2.2. Verify that status of work meets requirements for starting of equipment and systems.

3, PREPARATION

3.1. Coordinate sequence for start-up of various items of equipment, including owner provided equipment.

3.2. Notify Contracting Officer two days prior to start-up of each item of equipment.

3.3. Have contract documents, shop drawings, product data, and operation and maintenance data at hand during entire start-up process.

3.4. Verify that each piece of equipment has been checked for proper lubrication, drive rotation, belt tension, control sequence, and other conditions which may cause damage.

3.5. Verify control systems are fully operational in automatic mode.

3.6. Verify that tests, meter readings, and specific electrical characteristics agree with those specified by electrical equipment manufacturer.

3.7. Verify wiring to motors and controls required by mechanical work for operational smoke and fire protection demonstrations is complete.

3.8. Verify wiring and support systems for equipment installed under separate contracts is complete and checked.

3.9. Bearings: Inspect for cleanliness; clean and remove foreign matter. Verify alignment;

take corrective measures.

3.10. Drives: Inspect for tension on belt drives, adjustment ofvaripitch sheaves and drives, alignment, proper equipment speed, and cleanliness. Take corrective action.

3.11. Motors: Verify that motor amperage agrees with nameplate value. Inspect for conditions which produce excessive current flow and which exist due to equipment malfunction. Take corrective action.

4. STARTING SYSTEMS

4.1. Execute start-up under supervision of responsible manufacturer's representative or contractor personnel.

_ ..------- -------------------------ew

TRAVIS AFB - SAB'

e

Contract FA4427-1O-R-OI02

4.2. Place equipment in operation in proper sequence in accordance with sequencing schedule.