3-1 ATCH 1 SPECS 01660 10-R-0102 SABER.pdf

PDF 82 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER) Federal contract opportunity
Solicitation number
FA4427-10-R-0102
Issued by
Department of the Air Force Air Mobility Command

About this file

3-1 ATCH 1 SPECIFICATIONS 01660

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
Pre-Bid Conference Site Visit Attendee List.pdf PDF
DSC_0684.JPG JPG image
DSC_0688.JPG JPG image
DSC_0685.JPG JPG image
DSC_0689.JPG JPG image
DSC_0686.JPG JPG image
DSC_0693.JPG JPG image
DSC_0687.JPG JPG image
10-R-0102 SABER Questions Answers 1.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 33-34.pdf PDF
D3-3 DRAWING 24 —
D3-6 DRAWING 27 —
D3-8 DRAWING 29 —
D4-4 DRAWING 35 —
D4-1 DRAWING 32 —
D3-9 DRAWING 30 —
D2-9 DRAWING 20 —
D4-2 DRAWING 33 —
D3-4 DRAWING 25 —
D1-2 DRAWING 3 —
D1-6 DRAWING 7 —
D2-7 DRAWING 18 —
D1-7 DRAWING 8 —
D2-3 DRAWING 14 —
D2-4 DRAWING 15 —
D2-5 DRAWING 16 —
D2-1 DRAWING 12 —
1-9 ATCH 1 SPECS 01090 10-R-0102 SABER.pdf PDF
1-2 ATCH 1 SPECS TABLE OF CONTENTS 10-R-0102 SABER 26 APR 10.pdf PDF
2-9 ATCH 1 SPECS 01600 10-R-0102 SABER.pdf PDF
4-2 ATCH 8 Subcontractor Teaming Consent Form 10-R-0102 SABER.pdf PDF
1-7 ATCH 1 SPECS 01045 10-R-0102 SABER.pdf PDF
4-3 ATCH 9 Government Furnished Property Info 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet —
3-2 ATCH 1 SPECS 01700 10-R-0102 SABER.pdf PDF
1-3 ATCH 1 SPECS 01010 10-R-0102 SABER.pdf PDF
3-9 ATCH 5 SEED PROJECT SCOPE 10-R-0102 SABER 26APR10.pdf PDF
2-6 ATCH 1 SPECS 01500 10-R-0102 SABER.pdf PDF
1-6 ATCH 1 SPECS 01040 10-R-0102 SABER.pdf PDF
2-7 ATCH 1 SPECS 01560 10-R-0102 SABER.pdf PDF
1-5 ATCH 1 SPECS 01031 10-R-0102 SABER.pdf PDF
3-5A ATCH 1 SPECS SUPPORT EQUIPMENT 10-R-0102 SABER.pdf PDF
3-7 ATCH 3 WAGE DETERMINATION APPLICABILITY 10-R-0102 SABER.pdf PDF
3-8 ATCH 4 SCHEDULE OF MATERIAL SUBMITTALS 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet for Seed Project 10-R-0102 SABER.pdf PDF
2-3 ATCH 1 SPECS 01400 10-R-0102 SABER.pdf PDF
3-0 ATCH 1 SPECS 01650 10-R-0102 SABER.pdf PDF
1-4 ATCH 1 SPECS 01030 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS AFB - SABER

SECTION 01660

Contract FA4427-IO-R-OI02

TESTING, ADJUSTING, AND BALANCING OF SYSTEMS

1. GENERAL

1.1 REQUIREMENTS INCLUDED

1.1.1. Cooperate with or provide testing organization services under provisions specified in Sections 01400 and 01410.

1.2 RELATED REQUIREMENTS

1.2.1. Section 01400 & 01440 - Quality Control & Contractor's QC

1.2.2. Section 01410 - Testing Laboratory Services.

1.2.3. Section 01650 - Starting of Systems.

1.204. Individual Sections: Qualification of testing organization; specific services required.

1.3 SUBMITTALS

1.3.1. Prior to start of work, submit name of organization or contractor personnel proposed to perform services to the Contracting officer. Designate managerial responsibilities for coordination of entire testing, adjusting, and balancing.

1.3.2. Submit documentation to confirm organization or personnel qualifications.

1.3.3. Submit two preliminary specimen copies of each of the report forms proposed for use.

1.3A. Seven days prior to Substantial Completion, submit three copies of final reports to the Contracting Officer. Submit reports of testing, adjusting, and balancing which is postponed due to seasonal, climatic, occupancy, or other reasons beyond contractor's control, promptly after execution of those services.

104 PROCEDURES, GENERAL

104.1. Comply with procedural standards of certifying association under whose standards service will be performed.

1.4.2. NotifY Contracting Officer one day prior to beginning of operations.

104.3. Accurately record data for each step.

TRAVIS AFB - SAB' e Contract FA4427-1 O-R-Ol02

1.4.4. Report to Contracting Officer any defects or deficiencies noted during performance of servIces.

1.5 FINAL REPORTS

1.5.1. Organization having managerial responsibility shall make reports.

1.5.2. Each Form: Bear signature of recorder, and/or that of supervisor or reporting organization.

1.5.3. Identify each instrument used, and latest date of calibration of each.

1.6 CONTRACTOR RESPONSIBILITIES

1.6.1. Prepare each system for testing and balancing.

1.6.2. Cooperate with testing organization, provide access to equipment and systems.

Operate systems at designated times, and under conditions required for proper testing, adjusting, and balancing.

1.6.3. Notify testing organization seven days prior to time system will be ready for testing, adjusting, and balancing.

2. EXECUTION

2.1 PREPARATION

2.1.1. Provide instruments required for testing, adjusting, and balancing operations. Make instruments available to Contracting Officer to facilitate spot checks during testing. Retain possession of instruments and remove at completion of services.

2.1.2. Verify installation of system to be tested is complete and in continuous operation.

2.1.3. Verify ambient conditions and related facilities are in full operation.

File details come from the government source that posted it. Updated .