Questions and Answers - AB Dorm Mx - Part 2.pdf
PDF 65 KB Posted
- Attached to
- Charleston Air Base Dormitory Maintenance Federal contract opportunity
- Solicitation number
- FA441823Q0018
About this file
This document contains questions and answers regarding federal contract number FA441823Q0018 for dormitory maintenance services at Charleston Air Base. The contractor will be responsible for repairs to electrical equipment downstream of the main distribution panel as preventative maintenance is not required on this equipment per Air Force policy. While the performance work statement includes secondary electrical components in scope, transformers are excluded from the contract. National Fire Protection Association standard 70B recommends annual infrared inspections, but this standard has not been adopted by the Air Force. The contractor must comply with inspection requirements in the performance work statement.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
62. In the Q&A's that were released for FA441823Q0018 question #42 asked for a complete inventory of all electrical components at the facility. The question's answer stated that all electrical equipment needing PM was included in Appendix A. However there are no panels, sub panels, nor transformers listed. According to the PWS 2.a.19 "Electrical Low Voltage to include secondary side of main distribution panel and all components downstream" are part of the scope. In-order to be compliant with NFPA 70B an annual infrared inspection shall be performed. There is also a 3-year electrical inspection requirement.
All items requiring PMI are identified in Appendix A. Although the PWS 2.a.19 identifies Electrical Low Voltage to include secondary side of main distribution panel and all components downstream as being in scope, the contractor would only be responsible for repairs as PMI is not a standard practice on this equipment as Air Force policy.
NFPA 70B is a standard, not a mandatory code. The Air Force has not adopted this standard.
Transformers are precluded from the contract per the PWS 2.0.c.10.