Revised B2400 Server Room Questions.pdf
PDF 548 KB Posted
- Attached to
- B2400 Server Room P209 Federal contract opportunity
- Solicitation number
- FA441822R0016
About this file
This document contains a solicitation for a construction project and associated pre-bid questions and answers. The 628th Contracting Squadron is seeking a single-award, firm-fixed price contract for a 360-day construction project at Joint Base Charleston Naval Weapons Station in Goose Creek, South Carolina. The project involves renovating room P209 in Building B2400 to serve as a new server room, including installing new server racks, cable management, UPS, and in-row cooling systems. Space for network engineers will also be provided, with internal access controls between areas. New distribution breakers and fiber runs will be installed. A separate HVAC system for the server room is required. A pre-proposal conference is scheduled for August 3rd, 2022 at the Naval Welcome Center, with an RSVP due by July 29th. The opportunity is set aside exclusively for HUBZone small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 04.pdf | ||
| B2400 Server Room Sign-in.jpg | JPG image | |
| B2400 Server Room Questions.pdf | ||
| Solicitation Amendment 03.pdf | ||
| Davis Bacon Act WD SC20220022 Berkeley County Mod 2 22JUL22.pdf | ||
| Solicitation Amendment 02.pdf | ||
| Solicitation Amendment 01.pdf | ||
| Davis Bacon Act WD SC20220022 Berkeley County Mod 1 25FEB22.pdf | ||
| 15. AF 66-SUB Register - DSN B2400 Server Room.xlsx | XLSX spreadsheet | |
| Solicitation - FA441822R0016.pdf | ||
| 17a. Server Room Final 01 General Requirements.pdf | ||
| 17. B2400 Server Room Final Drawings.pdf | ||
| 17b. Server Room Final Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B2400 – Server Room
Pre-Bid Questions
FA441822R0016 03 Aug 22
1. Are there any specific security clearances required for any work associated with the severs and comm cabling? No
2. Will any work be required to be completed at night? It is possible that some work will be required to take place outside of standard hours. Refer to specification 01 14 00 "Work Restrictions" for further details.
3. Can a window be removed from the Bldg. use for material access? The government cannot dictate means and methods for how materials are placed in the job site. If appropriately coordinated and evaluated from a safety perspective, this may be an option.
4. Who maintains the existing fire alarm system? The existing fire alarm is currently maintained by Eagle Fire.
5. Could you please confirm the location of the controls SC that is closest to the new server room.
Room P220 is the nearest SC (see attached).
6. Please clarify if the SA-CFM-C show on mechanical sheet MI801 for the CRAC unit is necessary.
Sequence of operation do not call for it and for this type of units, in most of the cases, the fan speed is controlled by a temperature sensor and not by the amount of CFM in the discharge of the unit.
There are some CRAC units configured this way, in most cases it will not be necessary. It will depend upon the standard configuration of the units submitted and accepted on this project.
7. If CRAC manufacturer can provide AHRI certified performance data (per AHRI Datacom Cooling Certification Program at AHRI Standard 1360 & ASHRAE Standard 127-2007) at specific scheduled conditions can the factory test per spec section 23 81 23 2.9.1 be excluded?
Yes, if CRAC manufacturer can provide AHRI certified performance data (per AHRI Datacom Cooling Certification Program at AHRI Standard 1360 & ASHRAE Standard 127-2007) at specific scheduled conditions the factory test per spec section 23 81 23 2.9.1 can be excluded.
8. What elevation ABV. 1st Floor should the ref. piping and condenser water penetrate the wall in room P109? Please advise.
Reference drawings A-403 for height of exterior penetrations and A-502 for penetration notes, "must be located above existing first floor acoustical ceiling".
9. Please provide CRAC unit elevation and locations in detail. Drawings are not clear. Please advise.
Reference drawings A-403 for elevations, MI401 for CRAC locations, exact locations in P209A cannot be coordinated until the rack system is submitted and approved during construction.