B2400 Server Room Questions.pdf

PDF 439 KB Posted

Attached to
B2400 Server Room P209 Federal contract opportunity
Solicitation number
FA441822R0016
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains a federal contract opportunity solicitation and related pre-bid questions and answers. The 628th Contracting Squadron is seeking a single-award, firm-fixed price contract for construction services at Joint Base Charleston Naval Weapons Station in Goose Creek, South Carolina. The anticipated period of performance is 360 days. The contractor shall provide all personnel, equipment, materials, and supervision necessary to complete a new server room project in existing room P209 of building B2400, which will involve relocating the existing server room from D216, installing new racks, cable management, UPS, and in-row cooling units. Space for servers and network engineers will be provided, with internal access controls. New distribution breakers and fiber runs are also included. A pre-proposal conference is scheduled for August 3rd, 2022, with a request to RSVP by July 29th. The opportunity is a 100% HUBZone small business set-aside.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B2400 – Server Room

Pre-Bid Questions

FA441822R0016 03 Aug 22

1. Are there any specific security clearances required for any work associated with the severs and comm cabling? No

2. Will any work be required to be completed at night? It is possible that some work will be required to take place outside of standard hours. Refer to specification 01 14 00 "Work Restrictions" for further details.

3. Can a window be removed from the Bldg. use for material access? The government cannot dictate means and methods for how materials are placed in the job site. If appropriately coordinated and evaluated from a safety perspective, this may be an option.

4. Who maintains the existing fire alarm system? The existing fire alarm is currently maintained by Eagle Fire.

5. Could you please confirm the location of the controls SC that is closest to the new server room.

Room P220 is the nearest SC (see attached).

6. Please clarify if the SA-CFM-C show on mechanical sheet MI801 for the CRAC unit is necessary.

Sequence of operation do not call for it and for this type of units, in most of the cases, the fan speed is controlled by a temperature sensor and not by the amount of CFM in the discharge of the unit.

There are some CRAC units configured this way, in most cases it will not be necessary. It will depend upon the standard configuration of the units submitted and accepted on this project.