15. AF 66-SUB Register - DSN B2400 Server Room.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
B2400 Server Room P209 Federal contract opportunity
Solicitation number
FA441822R0016
Issued by
Department of the Air Force Air Mobility Command

About this file

This submittal register outlines the required submissions for a firm-fixed price construction contract to complete project DKGV 11-10361/NNPTC B2400 Server Room P209 at Joint Base Charleston Naval Weapons Station. The contractor shall provide all labor, materials, equipment and supervision to construct a new server room in existing room P209 in building B2400, including moving the existing server room from D216 to P209, installing new racks, cable management, UPS, in-row cooling, and fiber runs from D216 to P209. A new HVAC system separate from the building HVAC will also be provided for the server room. The contractor must attend a pre-proposal site visit on August 3, 2022 and the performance period is 360 days. The solicitation is a 100% HUBZone small business set-aside issued by the 628th Contracting Squadron with anticipated award by the Department of the Air Force. The submittal register outlines over 100 required submissions at various stages of the project for items including qualifications, schedules, plans, reports, certifications, inspections and closeout documents.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

SUBMITTAL REGISTERCONTRACT NO.
DKGV1110361
TITLE AND LOCATIONCONTRACTOR
DSN B2400 Server Room, JBC
ACTIVITY NOTRANSMITTAL NOSPEC SECTDESCRIPTION OF ITEM SUBMITTEDPARAGRAPH #CLASSIFICATION
GOVT OR A/E REVIEWCONTRACTOR
SCHEDULE DATESCONTRACTOR
ACTIONAPPROVING AUTHORITYRETURNED TO CONTR/
DATE RCD FRM APPV AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD ROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 - Outage Requests1.6.2G
01 11 00SD-01 - Road Closure Requests1.6.2G
01 11 00SD-01 - Work Clearance1.6G
01 14 00SD-01 - List of Contact Personnel1.2.1.1G
01 30 00SD-01 - Resume for the proposed Superintendent1.5.2G
01 30 00SD-04 - Color Boards1.2G
01 32 16.00 20SD-01 - Qualifications1.2G
01 32 16.00 20SD-01 - Project Schedule1.3G
01 32 16.00 20SD-01 - Initial Contract Progress Report (AF IMT 3065)1.4.1G
01 32 16.00 20SD-01 - Initial Contract Progress Schedule (AF IMT 3064)1.4.2G
01 32 16.00 20SD-07 - Project Schedule Updates1.3.3G
01 32 16.00 20SD-07 - Monthly Contract Progress Reports (AF IMT 3065)1.4.1G
01 32 16.00 20SD-07 - Monthly Contract Progress Schedules (AF IMT 3064)1.4.2G
01 33 00SD-01 - Submittal Register1.7G
01 35 26SD-01 - Accident Prevention Plan (APP)1.6G
01 35 26SD-01 - Activity Hazard Analysis (AHA)1.7G
01 35 26SD-01 - Critical Lift Plan1.6.1.1G
01 35 26SD-01 - Crane Operators1.5.1.3G
01 35 26SD-06 - Notifications and Reports1.11
01 35 26SD-06 - Accident Reports1.11.2G
01 35 26SD-06 - Crane Reports1.11.3
01 35 26SD-07 - Confined Space Entry Permit1.8.1
01 35 26SD-07 - Hot Work Permit1.8.1
01 35 26SD-07 - License Certificates1.13
01 45 00SD-01 - QC Plan1.6G
01 50 00SD-01 - Construction Site Plan1.3G
01 50 00SD-01 - Traffic Control Plan3.4.1G
01 50 00SD-03 - Backflow Preventers1.4
01 50 00SD-06 - Backflow Preventer Tests2.2.4
01 50 00SD-07 - Backflow Tester1.4.1
01 50 00SD-07 - Backflow Preventers1.4
01 54 00.00 31SD-03 - Affirmative Procurement Reporting Form1.5.2.1G
01 57 19.00 31SD-01 - Preconstruction Survey1.7.1G
01 57 19.00 31SD-01 - Regulatory Notifications1.8.3G
01 57 19.00 31SD-01 - Environmental Protection Plan1.5G
01 57 19.00 31SD-01 - Dirt and Dust Control Plan1.6G
01 57 19.00 31SD-06 - Disposal Requirements3.9.2
01 57 19.00 31SD-06 - Erosion and Sediment Control Inspection Reports3.4
01 57 19.00 31SD-06 - Storm Water Inspection Reports for General Permit3.4
01 57 19.00 31SD-06 - Solid Waste Disposal Report1.8.4G
01 57 19.00 31SD-07 - Contractor 40 CFR employee training records1.8.2G
01 57 19.00 31SD-11 - Waste Determination Documentation1.8
01 57 19.00 31SD-11 - Waste Determination Documentation3.7.2
01 57 19.00 31SD-11 - Disposal Documentation for Hazardous and Regulated Waste1.8.1
01 57 19.00 31SD-11 - Contractor 40 CFR Employee Training Records1.8.2
01 57 19.00 31SD-11 - Solid Waste Disposal Permit1.7.2
01 57 19.00 31SD-11 - Solid Waste Disposal Report1.8.4
01 57 19.00 31SD-11 - Hazardous Waste/Debris Management3.7.2
01 57 19.00 31SD-11 - Regulatory Notifications1.8.3
01 74 19.00 31SD-01 - Construction Waste Management Plan1.3.3G
01 78 00SD-03 - Warranty Management Plan1.5.1
01 78 00SD-03 - Warranty Tags1.5.4
01 78 00SD-03 - Spare Parts Data1.4
01 78 00SD-08 - Preventative Maintenance3.9
01 78 00SD-08 - Condition Monitoring3.9
01 78 00SD-08 - Inspection3.9
01 78 00SD-08 - Instructions1.5.1
01 78 00SD-10 - Operation and Maintenance Manuals3.7G
01 78 00SD-11 - As-Built Drawings3.1G
01 78 00SD-11 - Record Drawings3.3G
01 78 00SD-11 - As-Built Record of Equipment and Materials3.6
01 78 00SD-11 - Final Approved Shop Drawings3.4
01 78 00SD-11 - Construction Contract Specifications3.5
01 78 00SD-11 - Interim DD FORM 13543.1G
01 78 00SD-11 - Checklist for DD FORM 13543.1G
01 78 23SD-10 - O&M Database1.4G
01 78 23SD-10 - Training Plan3.1.1G
01 78 23SD-10 - Training Outline3.1.3G
01 78 23SD-10 - Training Content3.1.2G
01 78 23SD-11 - Training Video Recording3.1.4G
01 78 23SD-11 - Validation of Training Completion3.1.6G
01 91 00.15 20SD-06 - Initial Commissioning Report3.8G
01 91 00.15 20SD-06 - Issues Log1.1G
01 91 00.15 20SD-06 - Completed Pre-Functional Checklists3.5G
01 91 00.15 20SD-07 - Commissioning Firm1.8G
01 91 00.15 20SD-07 - Certificate Of Readiness1.11G
01 91 00.15 20SD-07 - Final Commissioning Report3.8G
02 41 00SD-01 - Demolition Plan1.2.2G
02 41 00SD-01 - Existing Conditions1.11
02 41 00SD-07 - Notification1.7G
03 30 53SD-02 - Installation Drawings1.5G
03 30 53SD-03 - Air-Entraining Admixture2.2.3.1
03 30 53SD-03 - Water-Reducing or Retarding Admixture2.2.3.3
03 30 53SD-03 - Curing Materials2.2.11
03 30 53SD-03 - Expansion Joint Filler Strips, Premolded2.2.6
03 30 53SD-03 - Joint Sealants - Field Molded Sealants2.2.7
03 30 53SD-03 - Conveying and Placing Concrete3.2
03 30 53SD-03 - Formwork2.2.8
03 30 53SD-03 - Mix Design Data2.3G
03 30 53SD-03 - Ready-Mix Concrete2.3
03 30 53SD-03 - Curing Compound2.4.3
03 30 53SD-03 - Mechanical Reinforcing Bar Connectors2.2.5
03 30 53SD-06 - Aggregates2.2.2
03 30 53SD-06 - Concrete Mixture Proportions2.1.3G
03 30 53SD-06 - Compressive Strength Testing3.9.3G
03 30 53SD-06 - Slump3.9.3G
03 30 53SD-06 - Air Content3.9.3
03 30 53SD-06 - Water2.2.4
03 30 53SD-07 - Cementitious Materials2.2.1
03 30 53SD-07 - Pozzolan2.2.1.2
03 30 53SD-07 - Aggregates2.2.2
03 30 53SD-07 - Delivery Tickets2.3
03 30 53SD-08 - Curing Compound2.4.3
05 40 00SD-03 - Studs, Joists2.1
05 40 00SD-07 - Load-Bearing Cold-Formed Metal Framing1.4
07 84 00SD-02 - Firestopping System2.1G
07 84 00SD -03 - Firestopping Materials2.2G
07 84 00SD-06 - Inspection3.3G
07 84 00SD-07 - Inspector Qualifications1.5.2
07 84 00SD-07 - Firestopping Materials2.2
07 84 00SD-07 - Installer Qualifications1.5.1G
07 92 00SD-03 - Sealants2.1G
07 92 00SD-03 - Primers2.2G
07 92 00SD-03 - Bond Breakers2.3G
07 92 00SD-03 - Backstops2.4G
07 92 00SD-03 - Field Adhesion3.1G
07 92 00SD-03 - Indoor Air Quality For Interior Sealants2.1.1
07 92 00SD-03 - Indoor Air Quality For Interior Acoustical Sealants2.1.3
07 92 00SD-03 - Indoor Air Quality For Interior Caulking2.5
08 11 13SD-02 - Doors2.1G
08 11 13SD-02 - Frames2.6G
08 11 13SD-02 - Schedule of Doors2.1G
08 11 13SD-02 - Schedule of Frames2.1G
08 11 13SD-03 - Doors2.1G
08 11 13SD-03 - Recycled Content for Steel Door Product2.1
08 11 13SD-03 - Frames2.6G
08 11 13SD-03 - Recycled Content for Steel Frame Product2.6
08 51 13SD-02 -Windows2.1G
08 51 13SD-02 -Fabrication Drawings1.7
08 51 13SD-03 - Windows2.1G
08 51 13SD-03 - Fasteners2.2.2G
08 51 13SD-03 - Windows Performance1.8G
08 51 13SD-03 - Thermail-Barrier Windows2.3G
08 51 13SD-03 - Windows Cleaners' Bolts2.4G
08 51 13SD-03 - Weatherstripping2.1.4G
08 51 13SD-03 - Accessories2.2.5G
08 51 13SD-03 - Adhesives2.2.3
08 51 13SD-03 - Thermal Performance1.8.4G
08 51 13SD-04 - Finish Sample1.3.3.1
08 51 13SD-04 - Window Sample1.3.3.2
08 51 13SD-05 - Structural Calculations for Deflection2.1G
08 51 13SD-05 - Design Analysis1.3.4G
08 51 13SD-06 - Minimum Condensation Resistance Factor1.3.5
08 51 13SD-06 - Windborne-Debris-Impact Performance1.8.5
08 51 13SD-10 - Windows2.1G
08 51 13SD-10 - Plastic Identification1.5
08 71 00SD-02 - Manufacturer's Detail Drawings1.3G
08 71 00SD-02 - Verification of Existing Conditions1.3G
08 71 00SD-02 - Hardware Schedule1.5G
08 71 00SD-02 - Keying System2.3.11G
08 71 00SD-03 - Hardware Items2.3G
08 71 00SD-08 - Installation3.1
08 71 00SD-10 - Hardware Schedule1.5G
08 71 00SD-11 - Key Bitting1.6.1
08 81 00SD-03 - Glazing Accessories1.3
08 81 00SD-03 - Sealants2.2.2.1
08 81 00SD-03 - Joint Backer2.2.3
08 81 00SD-04 - Tape2.2.5
08 81 00SD-04 - Sealing Tapes2.2.5
08 81 00SD-08 - Setting and Sealing Materials2.2
08 81 00SD-08 - Glass Setting3.2
08 81 00SD-11 - Insulated Glass Units1.7.1
09 22 00SD-02 - Metal Support Systems2.1G
09 22 00SD-03 - Metal Support Systems2.1
09 22 00SD-03 - Recycled Content for Metal Support Systems2.1
09 29 00SD-03 - Accessories2.1.15
09 29 00SD-03 - Gypsum Board2.1.1
09 29 00SD-03 - Recycled Content for Gypsum Board2.1.1
09 29 00SD-03 - Recycled Content for Paper Facing and Gypsum Cores2.1.1
09 29 00SD-03 - VOC Content of Joint Compound2.1.10
09 29 00SD-07 - Asbestos Free Materials2.1G
09 29 00SD-07 - Indoor Air Quality for Gypsum Board2.1.1
09 29 00SD-07 - Indoor Air Quality for Non-aerosol Adhesives2.1.12
09 29 00SD-07 - Indoor Air Quality for Aerosol Adhesives2.1.12
09 29 00SD-08 - Safety Data Sheets2.1
09 29 00SD-10 - Manufacturer Maintenance Instructions2.1
09 51 00SD-02 - Approved Detail Drawings2.1
09 51 00SD-03 - Acoustical Ceiling Systems2.1.1
09 51 00SD-03 - Recycled Content for Type III Ceiling Tiles2.2.1.1
09 51 00SD-03 - Recycled Content for Suspension Systems2.3
09 51 00SD-03 - Acoustical Performance2.1.2
09 51 00SD-04 - Acoustical Units2.2
09 51 00SD-04 - Acoustical Ceiling Tiles2.2.1.1
09 51 00SD-07 - Indoor Air Quality for Type III Ceiling Tiles2.2.1.1
09 51 00SD-07 - Indoor Air Quality for Adhesives2.6
09 51 00SD-07 - Indoor Air Quality for Sealants2.9
09 62 38SD-03 - Static-Control Resilient Flooring2.1G
09 62 38SD-03 - Recycled content for Static-Dissipative Vinyl Tile2.1.2.1
09 62 38SD-03 - Accessories2.6G
09 62 38SD-03 - Adhesives2.4G
09 62 38SD-03 - Warranty1.9
09 62 38SD-04 - Static-Control Resilient Flooring2.1G
09 62 38SD-04 - Moldings2.5G
09 62 38SD-04 - Special Treatment Materials1.3.1.4G
09 62 38SD-04 - Accessories2.6G
09 62 38SD-06 - Fire Resistance2.9
09 62 38SD-06 - Moisture, Alkalinity and Bond3.2
09 62 38SD-06 - Testing3.9
09 62 38SD-07 - Indoor Air Quality for Static-Dissipative Vinyl Tile2.1.2.1
09 62 38SD-07 - Indoor Air Quality for Adhesives2.4
09 62 38SD-07 - Qualifications of Applicator1.6
09 62 38SD-08 - Static-Control Resilient Flooring2.1G
09 62 38SD-08 - Accessories2.6G
09 90 00SD-02 - Piping Identification3.12
09 90 00SD-03 - Coating2.1G
09 90 00SD-03 - Product Data Sheets2.1
09 90 00SD-04 - Color2.3G
09 90 00SD-07 - Qualification Testing1.6.6.2G
09 90 00SD-07 - Indoor Air Quality for Paints and Primers1.6.5
09 90 00SD-08 - Application Instructions3.4.1
09 90 00SD-08 - Mixing2.1
09 90 00SD-08 - Manufacturer's Safety Data Sheets1.8.1
09 90 00SD-10 - Coatings2.1G
10 14 00.20SD-02 - Detail Drawings1.3.2G
10 14 00.20SD-03 - Door Tags2.2G
10 14 00.20SD-04 - Interior Signage1.3.1G
10 14 00.20SD-04 - Door Tags2.2G
10 14 00.20SD-10 - Approved Manufacturer's Instructions3.1G
10 14 00.20SD-10 - Protection and Cleaning3.1.2G
10 44 16SD-02 - Fire Extinguishers2.1.1G
10 44 16SD-02 - AccessoriesPart 2G
10 44 16SD-02 - CabinetsPart 2G
10 44 16SD-02 - Schedule1.5G
10 44 16SD-03 - Fire Extinguishers2.1.1G
10 44 16SD-03 - AccessoriesPart 2G
10 44 16SD-03 - CabinetsPart 2G
10 44 16SD-03 - Replacement Parts List3.2.1G
10 44 16SD-04 - Equipment Samples1.3.1G
10 44 16SD-07 - Fire Extinguishers Certifications2.1.1G
10 44 16SD-07 - Manufacturer's Warranty with Inspection Tag1.4G
21 13 13SD-01 - Qualified Fire Protection Engineer (QFPE)1.2.3G
21 13 13SD-01 - Sprinkler System Designer1.4.2.1G
21 13 13SD-01 - Sprinkler System Installer1.4.2.2G
21 13 13SD-02 - Shop Drawing1.2.1.1G
21 13 13SD-03 - Fittings2.3.1.2G
21 13 13SD-03 - Valves2.3.6G
21 13 13SD-03 - Alarm Valves2.3.5G
21 13 13SD-03 - Relief Valves2.6.3G
21 13 13SD-03 - Sprinklers2.7G
21 13 13SD-03 - Pipe Hangers and Supports2.3.5G
21 13 13SD-03 - Sprinkler Alarm Switch2.4.1G
21 13 13SD-03 - Valve Supervisory (Tamper) Switch2.4.2G
21 13 13SD-03 - Air Vent2.8.6G
21 13 13SD-03 - Seismic Bracing2.3.3G
21 13 13SD-03 - Nameplates2.1.2G
21 13 13SD-05 - Seismic Bracing2.3.3G
21 13 13SD-05 - Hydraulic Calculations1.2.1.2G
21 13 13SD-06 - Test Procedures3.7.1G
21 13 13SD-07 - Verification of Compliant Installation3.7.2.1G
21 13 13SD-07 - Request for Government Final Test3.7.2.2G
21 13 13SD-10 - Operating and Maintenance (O&M) Instructions3.9G
21 13 13SD-10 - Spare Parts1.6G
21 13 13SD-11 - As-built drawings3.9
22 00 00SD-02 - Plumbing System3.9.1G
22 00 00SD-03 - Backflow Prevention Assemblies3.9.1.1G
22 00 00SD-03 - Welding1.5.1
22 00 00SD-03 - Plumbing System3.9.1
22 00 00SD-06 - Tests, Flushing and Disinfection3.9
22 00 00SD-06 - Test of Backflow Prevention Assemblies3.9.1.1G
22 00 00SD-07 - Materials and Equipment1.3
22 00 00SD-07 - Bolts2.1.1
22 00 00SD-10 - Plumbing System3.9.1G
23 05 48.19SD-02 - Coupling and Bracing3.1
23 05 48.19SD-02 - Flexible Couplings or Joints3.3
23 05 48.19SD-02 - Equipment Restraint2.2
23 05 48.19SD-02 - Contractor Designed Bracing1.2.4G
23 05 48.19SD-03 - Coupling and Bracing3.1G
23 05 48.19SD-03 - Flexible Couplings Or Joints3.3G
23 05 48.19SD-03 - Equipment Restraint2.2G
23 05 48.19SD-03 - Contractor Designed Bracing1.2.4G
23 05 48.19SD-03 - Snubbers2.6
23 05 48.19SD-03 - Anchor Bolts3.9
23 05 48.19SD-03 - Vibration Isolators2.2.2
23 05 48.19SD-05 - Design Calculations1.2.4
23 05 48.19SD-06 - Anchor Bolts3.9G
23 05 93SD-01 - Records of Existing Conditions1.3.3G
23 05 93SD-01 - Independent TAB Agency and Personnel Qualifications1.5.1G
23 05 93SD-01 - TAB Design Review Report1.5.3.1G
23 05 93SD-02 - TAB Schematic Drawings and Report Forms1.3.3G
23 05 93SD-03 - Equipment and Performance Data1.3G
23 05 93SD-03 - TAB Related HVAC Submittals1.3G
23 05 93SD-06 - Completed Pre-Final DALT Report3.3.5G
23 05 93SD-06 - Certified Final DALT Report3.3.8G
23 05 93SD-06 - Prerequisite HVAC Work Checkout List1.5.3.2G
23 05 93SD-06 - Prerequisite HVAC Work Checkout List1.5.3.2G
23 05 93SD-06 - Prerequisite HVAC Work Checkout List1.5.3.2G
23 05 93SD-06 - Proportional Balancing3.7G
23 05 93SD-07 - Independent TAB Agency and Personnel Qualifications1.5.1G
23 05 93SD-07 - DALT and TAB Submittal and Work Schedule1.5.3.1G
23 05 93SD-07 - TAB Pre-Field Engineering Report1.5.3.2G
23 05 93SD-07 - Instrument Calibration Certificates1.5.5G
23 05 93SD-07 - DALT and TAB Procedures Summary3.7G
23 05 93SD-07 - Completed Pre-Final DALT Work Checklist3.7G
23 05 93SD-07 - Advance Notice of Pre-Final DALT Field Work3.3.2G
23 05 93SD-07 - Proportional Balancing3.7G
23 07 00SD-02 - MICA Plates3.2.2.4G
23 07 00SD-02 - Pipe Insulation Systems2.3
23 07 00SD-02 - Pipe Insulation Systems3.2
23 07 00SD-02 - Duct Insulation Systems3.3
23 07 00SD-02 - Equipment Insulation Systems3.4
23 07 00SD-03 - Pipe Insulation Systems2.3G
23 07 00SD-03 - Pipe Insulation Systems3.2G
23 07 00SD-03 - Duct Insulation Systems3.3G
23 07 00SD-03 - Equipment Insulation Systems3.4G
23 07 00SD-04 - Thermal Insulation2.2.1.3G
23 07 00SD-07 - Indoor air quality for adhesives2.2.1G
23 07 00SD-08 - Pipe Insulation Systems2.3G
23 07 00SD-08 - Pipe Insulation Systems3.2G
23 07 00SD-08 - Duct Insulation Systems3.3G
23 07 00SD-08 - Equipment Insulation Systems3.4G
23 09 00SD-02 - DDC Contractor Design Drawings3.3G
23 09 00SD-02 - Draft As-Built Drawings3.3G
23 09 00SD-02 - Final As-Built Drawings3.3G
23 09 00SD-03 - Programming SoftwareG
23 09 00SD-03 - Controller Application ProgramsG
23 09 00SD-03 - Configuration SoftwareG
23 09 00SD-03 - Controller Configuration Settings1.8.2G
23 09 00SD-03 - Proprietary Multi-Split Engineering Tool Software1.1.1.2G
23 09 00SD-03 - Manufacturer's Product Data2.2G
23 09 00SD-06 - Existing Conditions Report3.1.1
23 09 00SD-06 - Pre-Construction Quality Control (QC) Checklist1.10.1G
23 09 00SD-06 - Post-Construction Quality Control (QC) Checklist1.10.2G
23 09 00SD-06 - Start-Up Testing Report3.5.2G
23 09 00SD-06 - PVT Procedures3.6.1G
23 09 00SD-06 - PVT Report3.6.3G
23 09 00SD-10 - Operation and Maintenance (O&M) Instructions3.8G
23 09 00SD-10 - Training Documentation3.10.1G
23 09 00SD-11 - Enclosure Keys2.5G
23 09 00SD-11 - Password Summary Report3.2.6.1G
23 09 00SD-11 - Closeout Quality Control (QC) Checklist1.10.3G
23 23 00SD-02 - Refrigerant Piping System2.3G
23 23 00SD-03 - Refrigerant Piping System2.3
23 23 00SD-03 - Qualifications1.3.1
23 23 00SD-03 - Refrigerant Piping Tests3.5
23 23 00SD-03 - Verification of Dimensions3.1
23 23 00SD-06 - Refrigerant Piping Tests3.5
23 23 00SD-07 - Service Organization2.1
23 23 00SD-10 - Maintenance1.5G
23 23 00SD-10 - Operation and Maintenance Manuals3.4G
23 23 00SD-10 - Demonstrations3.4G
23 30 00SD-02 - Detail Drawings1.4.4G
23 30 00SD-03 - Insulated Nonmetallic Flexible Duct Runouts2.9.1.2
23 30 00SD-03 - Duct Connectors2.9.1.2
23 30 00SD-03 - Duct Access Doors2.9.2G
23 30 00SD-03 - Manual Balancing Dampers2.9.4G
23 30 00SD-03 - Diffusers2.9.10.1
23 30 00SD-03 - Registers and Grilles2.9.10.5
23 30 00SD-03 - Variable Volume, Single Duct Terminal Units2.12.3.2G
23 30 00SD-03 - Test Procedures1.4.5
23 30 00SD-03 - Diagrams1.2.1.2G
23 30 00SD-03 - Indoor Air Quality for Duct Sealants2.9.1
23 30 00SD-06 - Performance Tests3.12G
23 30 00SD-06 - Damper Acceptance Test3.9G
23 30 00SD-08 - Manufacturer's Installation Instructions3.2
23 30 00SD-08 - Operation and Maintenance Training3.15.2
23 30 00SD-10 - Operation and Maintenance Manuals3.15.1G
23 30 00SD-10 - Manual Balancing Dampers2.9.4G
23 30 00SD-10 - Variable Volume, Single Duct, Fan-Powered Terminal Units2.8.1.1G
23 30 00SD-10 - Reheat Units2.8.1.2G
23 30 00SD-11 - Indoor Air Quality During Construction3.13
23 81 23SD-03 - Computer Room Air Conditioner2.1G
23 81 23SD-03 - Space Temperature Control System Drawings2.8.3G
23 81 23SD-03 - Filters2.1.5
23 81 23SD-03 - Refrigerants1.4
23 81 23SD-03 - Hot Aisle Containment Systems2.3G
23 81 23SD-03 - Rack Mounted Fans2.4G
23 81 23SD-03 - Leak Detection2.5.1.3G
23 81 23SD-06 - CRAC Production Schedule and Factory Test Schedule2.11.2G
23 81 23SD-06 - Manufacturer's Factory Test Plans2.11.1G
23 81 23SD-06 - Factory Test Reports2.11.5G
23 81 23SD-06 - Field Test Schedule3.3.2G
23 81 23SD-06 - Manufacturer's Field Test Plans3.3.1G
23 81 23SD-06 - Field Test Reports3.3.6G
23 81 23SD-07 - Certificate of Specification Compliance2.6G
23 81 23SD-07 - Credentials of the Manufacturer's Field Test Representative3.3.3G
23 81 23SD-07 - Ozone Depleting Substances Technician Certification1.5.1
23 81 23SD-07 - Certified List Of Qualified Permanent Service Organizations1.6.3
23 81 23SD-08 - Installation Manual for Each Type of CRAC3.1.2
23 81 23SD-08 - Installation Manual for Each Type of Aisle Containment System3.1.2
23 81 23SD-10 - Computer Room Air Conditioner Operation and Maintenance Data3.1.3G
23 81 23SD-11 - Indoor Air Quality During Construction3.2
26 05 48.00 10SD-02 - Luminaires in Buildings3.2G
26 05 48.00 10SD-02 - Equipment Requirements1.3G
26 05 48.00 10SD-03 - Luminaires in Buildings3.2G
26 05 48.00 10SD-03 - Equipment Requirements1.3G
26 05 48.00 10SD-03 - Contractor Designed Bracing1.2.4G
26 20 00SD-02 - Panelboards2.15G
26 20 00SD-02 - Transformers2.2G
26 20 00SD-02 - Busway2.4G
26 20 00SD-02 - Cable Trays2.5G
26 20 00SD-02 - Wireways2.23G
26 20 00SD-02 - Marking Strips3.1.14.1G
26 20 00SD-03 - Receptacles2.14G
26 20 00SD-03 - Circuit Breakers2.13.3G
26 20 00SD-03 - Switches2.11G
26 20 00SD-03 - Transformers2.15G
26 20 00SD-03 - Enclosed Circuit Breakers2.14G
26 20 00SD-03 - Secondary Bonding Busbar2.18.1G
26 20 00SD-03 - Surge Protective Devices2.37G
26 20 00SD-06 - 600-volt Wiring Test3.5.2G
26 20 00SD-06 - Grounding System Test3.5.6G
26 20 00SD-06 - Transformer Tests3.5.3G
26 20 00SD-06 - Ground-fault Receptacle Test3.5.4G
26 20 00SD-09 - Transformer Factory Tests2.39.1
26 20 00SD-10 - Electrical Systems1.5.1G
26 33 53SD-02 - UPS Drawings1.5.1G
26 33 53SD-02 - UPS Installation1.5.2G
26 33 53SD-03 - UPS Module2.5G
26 33 53SD-03 - Technical Requirements UPS System2.4
26 33 53SD-03 - Spare PartsG
26 33 53SD-03 - Internet Protocol (Ip) Communications And Data Acquisition Port2.9G
26 33 53SD-06 - Work Plan1.5.3G
26 33 53SD-06 - Factory Test Plan1.5.4G
26 33 53SD-06 - Factory Test Report1.5.5G
26 33 53SD-09 - Initial Inspection and Tests3.2.2G
26 33 53SD-09 - Performance Tests3.2.3G
26 33 53SD-09 - Performance Test Plan1.5.6G
26 33 53SD-09 - Performance Test Report1.5.7G
26 33 53SD-10 - UPS Operation and Maintenance1.4.1G
26 33 53SD-11 - Installation3.1
26 51 00SD-03 - Luminaires2.2G
26 51 00SD-03 - Light Sources2.3G
26 51 00SD-03 - LED Drivers2.4G
26 51 00SD-03 - Luminaire Warranty1.6.1G
26 51 00SD-03 - Switches2.5.2.1G
26 51 00SD-03 - Exit Signs2.6.1G
26 51 00SD-03 - Emergency Drivers2.6.3G
26 51 00SD-05 - Luminaire Design Data1.5.2G
26 51 00SD-06 - ANSI/IES LM-79 Test Report1.5.3G
26 51 00SD-06 - ANSI/IES LM-80 Test Report1.5.4G
26 51 00SD-06 - ANSI/IES TM-21 Test Report1.5.5G
26 51 00SD-06 - ANSI/IES TM-30 Test Report1.5.6G
27 10 00SD-02 - Telecommunications Space Drawings1.6.1.2G
27 10 00SD-03 - Telecommunications cabling2.3G
27 10 00SD-03 - Patch panels2.4.5G
27 10 00SD-03 - Telecommunications outlet/connector assemblies2.5G
27 10 00SD-03 - Equipment support frame2.4.2G
27 10 00SD-03 - Spare Parts1.10.3G
27 10 00SD-06 - Telecommunications cabling testing3.5.1G
27 10 00SD-07 - Telecommunications Contractor1.6.2.1G
27 10 00SD-07 - Key Personnel1.6.2.2G
27 10 00SD-07 - Manufacturer Qualifications1.6.2.3G
27 10 00SD-07 - Test plan1.6.3G
27 10 00SD-09 - Factory reel tests2.12.1G
27 10 00SD-10 - Telecommunications cabling and pathway system1.10.1G
27 10 00SD-11 - Record Documentation1.10.2G
28 31 70SD-01 - Qualified Fire Protection Engineer (QFPE)1.3.2G
28 31 70SD-01 - Fire alarm system designer1.9.2.1G
28 31 70SD-01 - Supervisor1.9.2.2G
28 31 70SD-01 - Technician1.9.2.3G
28 31 70SD-01 - Installer1.9.2.4G
28 31 70SD-01 - Test Technician1.9.2.5G
28 31 70SD-01 - Fire Alarm System Site-Specific Software Acknowledgement1.7G
28 31 70SD-02 - Nameplates1.9.1.3G
28 31 70SD-02 - Instructions2.2.4G
28 31 70SD-02 - Wiring Diagrams1.9.1.4G
28 31 70SD-02 - System Layout1.9.1.5G
28 31 70SD-02 - Notification Appliances1.9.1.6G
28 31 70SD-02 - Initiating devices1.9.1.7G
28 31 70SD-02 - Battery Power1.9.1.8G
28 31 70SD-02 - Voltage Drop Calculations1.9.1.9G
28 31 70SD-03 - Smoke Detectors2.7G
28 31 70SD-03 - Air sampling smoke detectors3.2.6G
28 31 70SD-03 - Addressable Interface Devices2.12G
28 31 70SD-03 - Addressable Control Modules2.13G
28 31 70SD-03 - Notification Appliances1.9.1.6G
28 31 70SD-03 - Batteries2.17.1G
28 31 70SD-03 - Battery Chargers2.17.2G
28 31 70SD-03 - Supplemental Notification Appliance Circuit Panels2.17.1.1G
28 31 70SD-03 - Auxiliary Power Supply Panels2.17.1.1G
28 31 70SD-03 - Surge Protective Devices2.18G
28 31 70SD-03 - Alarm Wiring2.18G
28 31 70SD-03 - Back Boxes and Conduit3.3.4G
28 31 70SD-03 - Ceiling Bridges3.2.11G
28 31 70SD-03 - Terminal Cabinets3.3.2G
28 31 70SD-03 - Radio Transmitter and Interface Panels2.12.1G
28 31 70SD-03 - Electromagnetic Door Holders2.13.2G
28 31 70SD-03 - Document Storage Cabinet3.12.3G
28 31 70SD-05 - Air Sampling Smoke Detection System Calculations1.9.1.11G
28 31 70SD-06 - Test Procedures3.8.1G
28 31 70SD-07 - Verification of Compliant Installation3.8.2.1G
28 31 70SD-07 - Request for Government Final Test3.8.2.2G
28 31 70SD-10 - Operation and Maintenance (O&M) Instructions3.1G
28 31 70SD-10 - Instruction of Government Employees3.11G
28 31 70SD-11 - As-Built Drawings1.9.1.13
28 31 70SD-11 - Spare Parts1.11.1
31 23 00.00 20SD-06 - Borrow Site Testing1.6G
31 23 00.00 20SD-06 - Fill and backfill3.17.2.1
31 23 00.00 20SD-06 - Select material3.17.2.2
31 23 00.00 20SD-06 - Density tests3.17.2.4
31 23 00.00 20SD-06 - Porous fill3.11.2.3
32 92 19SD-03 - Fertilizer2.4
32 92 19SD-06 - Topsoil Composition Tests2.2.3
32 92 19SD-07 - Seed2.1

Submittal Register, Dec 2019 Page &P of &N