Solicitation_Material_Submittal.pdf
PDF 285 KB Posted
- Attached to
- Construct Cryogenic Facility Federal contract opportunity
- Solicitation number
- FA4418-19-R014
About this file
FA4418-19-R-A024 Material Submittal Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA441819RA0240002_SF_30.pdf | ||
| Answers_-_Cryogenic_Facility_Pre-Proposal_Questions_(16_April_19).pdf | ||
| Site_Visit_Sign_in_sheet.pdf | ||
| Solicitation_Amendment_FA441819RA0240001_SF_30.pdf | ||
| Geotech_Report.pdf | ||
| Answers_-_Cryogenic_Facility_Pre-Proposal_Questions_(Response_15_April)_(003).pdf | ||
| Asbestos_Survey.pdf | ||
| Cryogenic_Facility_Wage_Determination.pdf | ||
| Solicitation_-_FA441819RA024.pdf | ||
| Solicitation_Attach_Drawings.pdf | ||
| Solicitation_Green_Procurement.pdf | ||
| Addendum_1.pdf | ||
| Solicitation_Attach_Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 29 PAGES
DKFX 16-1037
Construct Cryogenics Facility
01 14 00 SD-01 Preconstruction Submittals 1.2.1.1List of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.2 GView location map
1.3 GProgress and completion pictures
1.6.1 GResume for Superintendent
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3 GProject schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
1.3.3 GProject Schedule Updates
1.4.1 GMonthly Contract Progress
Report (AF IMT 3065)
1.4.2 GMonthly Contract Progress
Schedule (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals
1.6 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
1.5.1.2 GCrane Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 29 PAGES
Construct Cryogenics Facility
01 35 26 SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.11.4License Certificates 1.13License Certificates
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
SD-06 Test Reports 2.2.5Backflow Preventer Tests
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 54 00 SD-03 Product Data
1.5.1 GAFFIRMATIVE PROCUREMENT
REPORTING FORM
1.6 GAFFIRMATIVE PROCUREMENT
REPORTING FORM
01 57 19 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 29 PAGES
Construct Cryogenics Facility
01 57 19 1.7.6 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
1.6Dirt and Dust Control Plan
SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control
Inspection Reports 3.4Erosion and Sediment Control
Inspection Reports 3.4Storm Water Inspection Reports for General Permit
1.7.8 GSolid Waste Disposal Report
SD-07 Certificates
1.7.5 GContractor 40 CFR Employee
Training Records SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook
1.7.3Waste Determination Documentation
1.7.4Disposal Documentation for Hazardous and Regulated Waste
1.7.5Contractor 40 CFR Employee Training Records
1.7.8Solid Waste Disposal Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 29 PAGES
Construct Cryogenics Facility
01 57 19 3.7.2Hazardous Waste/Debris Management
1.7.6Regulatory Notifications 01 78 00 SD-03 Product Data
1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data
SD-08 Manufacturer’s Instructions 3.8Preventative Maintenance 3.8Condition Monitoring (Predictive
Testing) 3.8Inspection 1.5.1Instructions
SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2.1 GRecord Drawings
3.5.1As-Built Record of Equipment and Materials
3.3FINAL APPROVED SHOP
DRAWINGS
3.4CONSTRUCTION CONTRACT
SPECIFICATIONS
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 29 PAGES
Construct Cryogenics Facility
01 78 00 3.9 GInterim DD FORM 1354
3.9 GChecklist for DD FORM 1354
01 78 02.00 20 SD-11 Closeout Submittals
2.1 G ARecord Drawings
2.2 G ARecord GIS Data
2.3 G ARecord Product Data
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals 3.2.2Receipts
02 82 16.00 20 SD-03 Product Data
3.1.4 GLocal Exhaust Equipment
3.1.5 GVacuums
3.1.1.1 GRespirators
3.1.4 GPressure Differential Automatic
Recording Instrument
1.2.2 GAmended Water
1.3.8 GMaterial Safety Data Sheets
()(MSDS) for all materials
2.1 GEncapsulants
SD-06 Test Reports
1.5.5 GAir Sampling Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 29 PAGES
Construct Cryogenics Facility
02 82 16.00 20 1.5.6 GPressure Differential Recordings For Local Exhaust System
3.3.3.2 GAsbestos Disposal Quantity
Report
3.2.5.2 GClearance Sampling
SD-07 Certificates
1.3.9 GAsbestos Hazard Abatement Plan
1.3.10 GTesting Laboratory
1.5.1 GPrivate Qualified Person
Documentation
1.5.4 GContractor's License
1.5.2 GCompetent Person
1.5.3 GWorker's License
1.3.11 GLandfill Approval
1.3.3 GEmployee Training
1.3.12 GMedical Certification
1.3.11 GWaste Shipment Records
1.3.6 GRespiratory Protection Program
1.3.11 GDelivery Tickets
3.1.5 GVacuums
3.1.2.3 GWater Filtration Equipment
3.1.5 GVentilation Systems
3.1 GEquipment Used To Contain
Airborne Asbestos Fibers
2.1 GEncapsulants
1.3.4Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 29 PAGES
Construct Cryogenics Facility
02 82 16.00 20 SD-11 Closeout Submittals
1.3.4 GNotifications
1.6.1 GRental Equipment
1.3.6.1 GRespirator Program Records
1.3.4 GPermits
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded
Sealants
2.3 GMix Design Data
2.3Ready-Mix Concrete 2.4.1Curing Compound
SD-06 Test Reports
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor Tolerances
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
SD-07 Certificates 2.2.1Cementitious Materials 2.2.1.2Pozzolan 2.3Delivery Tickets
SD-08 Manufacturer’s Instructions 2.4.1Curing Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 29 PAGES
Construct Cryogenics Facility
04 20 00 SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.3.1.1 GCementitious Materials
2.5.7 GInsulation
SD-04 Samples
2.2.2.2 GConcrete Masonry Units (CMU)
2.2.2.4 GConcrete Brick
2.5.2 GAnchors, Ties, and Bar
Positioners
2.5.7 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-07 Certificates 2.2.2.4Concrete Brick 2.3.1.1Cementitious Materials 2.5.2Anchors, Ties, and Bar
Positioners 2.5.7Insulation
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
2.4 GAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 29 PAGES
Construct Cryogenics Facility
07 21 13 SD-07 Certificates
2.1 GBlock or Board Insulation
1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.4.1Adhesive
07 27 26 SD-01 Preconstruction Submittals
1.5.1 GQualifications of Manufacturer
1.5.2 GQualifications of Installer
SD-03 Product Data
1.3 GFluid-Applied Membrane Air
Barrier
2.3 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.3.1 GSafety Data Sheets
SD-06 Test Reports
3.4.1 GSite Inspections
SD-07 Certificates
1.3 GFluid-Applied Membrane Air
Barrier
1.5.1 GQualifications of Manufacturer
1.5.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.3 GFluid-Applied Membrane Air
Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 29 PAGES
Construct Cryogenics Facility
07 27 26 2.3 GPrimers, Adhesives, and Mastics SD-11 Closeout Submittals
2.1 GVolatile Organic Compound
(VOC) Content
07 60 00 SD-02 Shop Drawings
2.1.1 GExposed Sheet Metal
3.1.9 GGutters
3.1.10 GDownspouts
3.1.12 GExpansion Joints
3.1.14 GCopings
3.1.8 GDrip Edges
3.1.11 GEave Flashing
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance Data
1.4.3 GCleaning and Maintenance
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 29 PAGES
Construct Cryogenics Facility
07 92 00 SD-11 Closeout Submittals
2.1.1 GIndoor Air Quality For Interior
Sealants
2.1.3 GIndoor Air Quality For Interior
Floor Joint Sealants 08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories 2.6Weatherstripping
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.2.4 GKeying System
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 29 PAGES
Construct Cryogenics Facility
08 71 00 SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 09 67 23.13 SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
SD-04 Samples
1.5.2 GHardboard Mounted Epoxy
Flooring
3.1.4 GFloor Topping
SD-05 Design Data
1.2.2 GDesign Mix Data
SD-07 Certificates
1.5.1 GListing of Product Installations
1.5 GReferenced Standards
Certificates SD-11 Closeout Submittals
1.6 GWarranty
09 90 00 SD-02 Shop Drawings
3.7Piping identification
3.7 Gstencil
SD-04 Samples
1.7 GColor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 29 PAGES
Construct Cryogenics Facility
09 90 00 SD-08 Manufacturer’s Instructions 3.5.2Mixing
1.5.2 GManufacturer's Safety Data
Sheets 10 14 00.10 SD-02 Shop Drawings
3.1 GApproved Detail Drawings
SD-03 Product Data
2.1Modular Exterior Signage System 3.1Installation
1.2 GExterior Signage
1.2.1Wind Load Requirements
SD-04 Samples
1.2 GExterior Signage
SD-10 Operation and Maintenance Data
3.1.2 GProtection and Cleaning
12 32 00 SD-02 Shop Drawings
2.2 GFabrication
3.1.1 GInstallation Drawings
SD-03 Product Data
2.3.1 GCabinets
2.4 GMedium Density Fiberboard
(MDF)
2.4 GAdhesives
2.4 GFiller Material
2.4 GParticle Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 29 PAGES
Construct Cryogenics Facility
12 32 00 2.4 GFasteners
2.5 GAccessories and Hardware
2.3.1 GCountertops
SD-04 Samples
2.5 GAccessories and Hardware
1.3 GManufacturer's Standard Color
Charts SD-07 Certificates
2.4Adhesives 2.4Filler Material 2.4Particle Board 2.4Fasteners 2.5Accessories and Hardware
SD-08 Manufacturer’s Instructions Part 3Manufacturer's Instructions
12 36 00 SD-02 Shop Drawings
2.2 GFabrication
3.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GStainless Steel
2.3 GAdhesives
2.3 GFiller Material
SD-04 Samples
2.2.1 GCountertop
2.2.1 GBacksplash
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 29 PAGES
Construct Cryogenics Facility
12 36 00 2.1 GManufacturer's Standard Color Charts
SD-07 Certificates 1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions 2.1Manufacturer's Instructions
13 34 19 SD-01 Preconstruction Submittals
1.6.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 GDetail Drawings
1.6.1 GDetail Drawings
SD-03 Product Data
1.6.1 GManufacturer's catalog data
SD-04 Samples
1.6.1 GCoil Stock
2.1.8 GCoil Stock
1.2.1.9 GRoof Panels
1.2.1.9 GWall Panels
2.7.1 GMetal Closure Strips
1.4.7 GInsulation
2.4.2 GInsulation
2.4.4 GManufacturer's color charts and
chips SD-05 Design Data
1.6.1 Gdescriptive and technical
literature
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 29 PAGES
Construct Cryogenics Facility
13 34 19 1.6.1 Gbuilding design analysis SD-06 Test Reports
1.6.1 Gtest reports
1.6.1 GCoatings and base metals
1.6.1 GFactory Color Finish Performance
Requirements SD-07 Certificates
1.6.1 Gsystem components
1.6.1 GCoil Stock
2.1.8 GCoil Stock
1.6.1 GAluminized Steel Repair Paint
1.6.1 GGalvanizing Repair Paint
1.6.1 GEnamel Repair Paint
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 GInstallation of Roof and Wall
panels
1.7 Gshipping, handling, and storage
SD-11 Closeout Submittals
3.11.1 GManufacturer's Warranty
3.11.2 GContractor's Warranty for
Installation 22 00 00 SD-03 Product Data
2.5Fixtures 2.5.1Service Sinks
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 29 PAGES
Construct Cryogenics Facility
22 00 00 2.8 GWater Heaters SD-06 Test Reports
3.7Tests, Flushing and Disinfection SD-07 Certificates
1.3Materials and Equipment SD-10 Operation and Maintenance Data
3.7.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
2.1.2 SEnergy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data 2.11.2Manual Balancing Dampers 2.11.5.1Diffusers 2.11.5.2Registers and Grilles 2.11.6Louvers 2.11.7Air Vents, Penthouses, and
Goosenecks
2.13 GAir Handling Units
1.4.6Test Procedures
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 29 PAGES
Construct Cryogenics Facility
23 00 00 1.4.3Ozone Depleting Substances SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation Instructions
3.14.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.14.1 GOperation and Maintenance
Manuals
2.11.2 GManual Balancing Dampers
2.13 GAir Handling Units
23 05 93 SD-01 Preconstruction Submittals
1.3.2 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Design Review Report
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 29 PAGES
Construct Cryogenics Facility
23 05 93 3.3.5 GCompleted Pre-Final DALT Report
3.3.8 GCertified Final DALT Report
1.5.3.2 GPrerequisite HVAC Work
Checkout List
1.5.3.2 GPrerequisite HVAC Work
Checkout List
1.5.3.2 GPrerequisite HVAC Work
Checkout List SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GDALT and TAB Submittal and
Work Schedule
1.5.3.2 GTAB Pre-Field Engineering
Report
1.5.5 GInstrument Calibration
Certificates
3.3.2 GAdvance Notice of Pre-Final
DALT Field Work
23 31 13.00 40 SD-01 Preconstruction Submittals Part 2 GMaterial, Equipment, and Fixture
Lists
2.1.1 GRecords of Existing Conditions
SD-02 Shop Drawings
2.1 GConnection Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 29 PAGES
Construct Cryogenics Facility
23 31 13.00 40 2.2.1 GOffset Fitting Configurations SD-03 Product Data
2.1.1Equipment and Performance Data
2.3.1 GGalvanized Steel Ductwork
Materials
2.3.2Brazing Materials 2.3.3Mill-Rolled Reinforcing and
Supporting Materials
2.2.1 GRound Sheet Metal Duct Fittings
2.2.4 GTurning Vanes
2.2.6 GFlexible Connectors
2.2.10 GGravity Backdraft and Relief
Dampers
2.2.9 GManual Volume Dampers
SD-05 Design Data
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports
3.4.1 GDuctwork Leakage Tests
SD-07 Certificates 1.3Listing of Product Installations 2.3.1Galvanized Steel Ductwork
Materials 2.3.2Brazing Materials 2.3.3Mill-Rolled Reinforcing and
Supporting Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 29 PAGES
Construct Cryogenics Facility
23 31 13.00 40 2.2.1Round Sheet Metal Duct Fittings 2.2.4Turning Vanes 2.2.5Dampers 2.2.6Flexible Connectors
SD-10 Operation and Maintenance Data
3.5.1 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.5.2 GRecord Drawings
23 37 13.00 40 SD-01 Preconstruction Submittals
2.2.1 GMaterial, Equipment, and Fixture
Lists
2.2.1 GRecords of Existing Conditions
SD-02 Shop Drawings
2.2.1 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 GEquipment and Performance
Data SD-10 Operation and Maintenance Data
2.2.2.25 GType TS Supply Troffer
2.2.2.27 GType TSR Combination Supply
and Return Troffer 26 05 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 29 PAGES
Construct Cryogenics Facility
26 05 00.00 40 2.1Material, Equipment, and Fixture Lists
SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.6 GSplices and Connectors
2.1.3 GSwitches
2.1.4 GReceptacles
2.1.5 GOutlet Boxes, Pull Boxes and
Junction Boxes
2.1.7 GCircuit Breakers
2.1.6 GPanelboards
2.1.8 GLamps and Lighting Fixtures
SD-06 Test Reports
3.3 GContinuity Test
3.3 GPhase-Rotation Tests
3.3 GInsulation Resistance Test
SD-08 Manufacturer’s Instructions 3.1Manufacturer's Instructions
26 05 19.10 10 SD-03 Product Data
2.1.2.1 GConductors
3.1Cable Manufacturing Data
SD-06 Test Reports
3.2 GTest Report(s), Inspection
Report(s), and Verification Report(s)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 29 PAGES
Construct Cryogenics Facility
26 24 16.00 40 SD-02 Shop Drawings
2.1.1 GDetail Drawings
SD-03 Product Data
2.1.1 GPanelboards
2.1.3 GDirectory Card and Holder
SD-06 Test Reports
3.2 GContinuity Tests
3.2 GInsulation Tests
SD-07 Certificates
1.3.1 GCertification
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3 GDrivers
1.6.1 GLED Luminaire Warranty
1.5.3 GLuminaire Design Data
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
1.5.5 GLED Light Source - IES LM-80
Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 29 PAGES
Construct Cryogenics Facility
26 51 00 1.5.6 GLED Light Source - IES TM-21 Test Report
1.5.9.3 GEnergy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
1.5.2 GLED Driver and Dimming Switch
Compatibility Certificate 26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.6.1 GLED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire drawings
SD-03 Product Data
2.2 GLED Luminaires
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.1 GPhotocell
SD-04 Samples
2.2 GLED Luminaires
SD-05 Design Data
1.5.3 GDesign Data for luminaires
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 29 PAGES
Construct Cryogenics Facility
26 56 00 1.5.5 GLED Light Source - IES LM-80 Test Report
3.2Operating test SD-07 Certificates
1.6.1 GLuminaire Useful Life Certificate
SD-10 Operation and Maintenance Data
1.7Operational Service 27 10 00 SD-02 Shop Drawings
1.5.1.1 GTelecommunications drawings
1.5.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
2.4.2 GPatch panels
2.4.1 GEquipment support frame
1.9.3 GSpare Parts
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing SD-07 Certificates
1.5.2.1 GTelecommunications Contractor
1.5.2.2 GKey Personnel
1.5.2.3 GManufacturer Qualifications
1.5.3 GTest plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 29 PAGES
Construct Cryogenics Facility
27 10 00 SD-09 Manufacturer’s Field Reports
2.10.1 GFactory reel tests
SD-10 Operation and Maintenance Data
1.9.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.9.2 GRecord Documentation
31 00 00 SD-01 Preconstruction Submittals
1.4.1.2 GDewatering Work Plan
SD-03 Product Data
3.5 GUtilization of Excavated Materials
SD-06 Test Reports
3.11 GTesting;
2.1 GBorrow Site Testing;
SD-07 Certificates
3.11 GTesting;
31 32 11 SD-02 Shop Drawings
3.2.2 GLayout
3.2.4 GObstructions Below Ground
3.2.2 GErosion Control
2.5.3.1 GSeed Establishment Period;
3.6 GMaintenance Record
SD-03 Product Data
2.2.2 GGeosynthetic Binders
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 29 PAGES
Construct Cryogenics Facility
31 32 11 2.1 GRecycled Plastic
2.3.3 GWood Cellulose Fiber
2.3.4 GPaper Fiber
2.3.9 GMulch Control Netting and Filter
Fabric
2.3.10 GHydraulic Mulch
2.4 GGeotextile Fabrics
2.7 GAggregate
1.3 GEquipment
3.1.1 GFinished Grade
SD-04 Samples
1.6 GMaterials
SD-06 Test Reports
2.2.2 GGeosynthetic Binders
2.3.10 GHydraulic Mulch
2.4 GGeotextile Fabrics
2.7 GSand
2.7 GGravel
SD-07 Certificates
2.3 GMulch
2.3.10 GHydraulic Mulch
2.4 GGeotextile Fabrics
2.2.2 GGeosynthetic Binders
2.2.1 GSynthetic Soil Binders
1.5.1 GInstaller's Qualification
2.1 GRecycled Plastic
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 29 PAGES
Construct Cryogenics Facility
31 32 11 2.5.3 GSeed
2.3.8 GAsphalt Adhesive
2.3.11 GTackifier
2.3.6 GWood By-Products
2.3.3 GWood Cellulose Fiber
SD-10 Operation and Maintenance Data
3.6.2 GMaintenance Instructions
2.7 GAggregate
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports 3.8Field Quality Control
32 92 19 SD-03 Product Data
2.5.3 GWood cellulose fiber mulch
2.4 GFertilizer
SD-06 Test Reports
2.2.3 GTopsoil composition tests
SD-07 Certificates
2.1 Gseed
SD-08 Manufacturer’s Instructions
2.7 GErosion Control Materials
33 71 02 SD-02 Shop Drawings
1.5.1 GPrecast underground structures
SD-03 Product Data
2.5 GLive end caps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 29 PAGES
Construct Cryogenics Facility
33 71 02 2.9 GCable supports SD-06 Test Reports
3.13.1 GField Acceptance Checks and
Tests
2.12.1 GArc-proofing test
3.3 GCable Installation Plan and
Procedure SD-07 Certificates
1.5.2 GCable splicer/terminator
1.5.3 GCable Installer Qualifications
1.5.4 GCertificate of Conformance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR