Attch_01_Table_of_Contents.pdf

PDF 29 KB Posted

Attached to
Repair/Replace HVAC Systems, Roofing and Siding at Unaccompanied Personnel Housing (UPH)
Solicitation number
FA4418-15-R-0010
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
Revised_Davis_Bacon_dated_8-10-15___Atch__25.pdf PDF
Amendment_0002_dated_8-10-2015.doc DOC document
Rev_1_Attch_23_AF_Form_66.pdf PDF
FA4418-15-R-0010-0001.pdf PDF
Site_Visit_Minutes_w_Attachments.pdf PDF
Site_Visit_Q A.pdf PDF
Attch_16_01_78_00_CLOSEOUT_SUBMITTALS.pdf PDF
Attch_07_01_33_16_DESIGN_AFTER_AWARD.pdf PDF
Attch_08_01_35_26_GOVERNMENTAL_SAFETY_REQUIREMENTS.pdf PDF
Attch_04_01_30_00_ADMINISTRATIVE_REQUIREMENTS.pdf PDF
Attch_02_01_11_00_SUMMARY_OF_WORK.pdf PDF
Attch_25_Wage_Determination.pdf PDF
Attch_24_Green_Procurement_Form.pdf PDF
Attch_11_01_50_00_TEMP_CONSTRUCTION_FAC_ _CONTROLS.pdf PDF
Attch_13_01_54_00_GREEN_PROCUREMENT.pdf PDF
Attch_20_HVAC_UPH_Part_4.pdf PDF
Attch_19_Roofs-Siding_UPH_Part_3.pdf PDF
Attch_15_01_57_50_TEMPORARY_ENVIRONMENTAL_CONTROLS.pdf PDF
Attch_03_01_14_00_WORK_RESTRICTIONS.pdf PDF
Attch_23_AF_Form_66_-_Schedule_of_Material_Submittals.pdf PDF
Attch_18_HVAC_UPH_Part_3.pdf PDF
Attch_22_Roofs-Siding_UPH_Part_6.pdf PDF
Attch_05_01_32_16_00_20_PROJ_SCHED_ _PROG_DOCS.pdf PDF
Attch_09_01_42_00_SOURCES_FOR_REFERENCE_PUBLICATIONS.pdf PDF
Attch_10_01_45_00_QC_FOR_MINOR_CONSTRUCTION.pdf PDF
Attch_12_01_50_10_ENVIRONMENTAL.pdf PDF
Attch_14_01_57_20_WASTE_MANAGEMENT.pdf PDF
Attch_21_HVAC_UPH_Part_6.pdf PDF
Attch_17_01_78_23_OPERATION_AND_MAINTENANCE_DATA.pdf PDF
FA4418-15-R-0010.pdf PDF
Attch_06_01_33_00_SUBMITTAL_PROCEDURES.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair HVAC, UPH (Various Facilities) Joint Base Charleston, Weapons Station Solicitation Goose Creek, SC 29445 FA4418-15-R-0010

Repair HVAC, UPH Table of Contents – Page 1 of 1

TABLE OF CONTENTS

Repair HVAC, UPH

April 15, 2015

---- Minor Construction Design-Build Division 01 (14 Specifications)

Part 3 Statement of Work / Project Program, HVAC

Part 3 Statement of Work / Project Program, Roofs/Siding

Part 4 Minimum Materials, Engineering and Construction Requirements

Part 6 Attachments, HVAC

Part 6 Attachments, Roofs/Siding

Preface

This Request for Proposal (RFP) consists of six parts. Part 1 contains typical contractual forms, procedures, bidding instructions, bond information, clauses and wage decisions. Part 2 contains general contract administrative and execution requirements including, but not limited to safety, design criteria & process, quality control, security, schedule, invoicing, temporary facilities, and design and construction oversight processes. Part 2, Attachment A, contains project-specific general requirements that may either modify and/or supplement the corresponding standard paragraphs in the Part 2 “General Requirements” section. Part 3 lists the project requirements, specific scope items, and expected quality level above and beyond those outlined in Part 4. Part 4 contains Performance Specifications and minimum quality requirements. Part 5, prescriptive specifications, is typically not used in this Small Project format. Part 6 contains background project information, references, and other project-specific requirements.

Attachment #1

Part 4 Minimum Materials, Engineering and Construction Requirements

File details come from the government source that posted it. Updated .