FA4418-14-R-0026_B335_Questions_from_Contractors.pdf

PDF 173 KB Posted

Attached to
Repair Roof, Vehicle Maintenance Facility, B335
Solicitation number
FA4418-14-R-0026
Issued by

About this file

FA4418-14-R-0026 - Replace Roof Veh. Mtn. Facility B335 - Questions from Contractors

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17 September 2014

Solicitation #: FA4418-14-R-0026 Replace Roof, Veh. Mtn. Facility, B335

Questions from prospective contractors regarding the project:

1. In regards to the asbestos abatement plan, is the contractor required to conduct an asbestos test on the entire structure or just the roofing area/areas to be disturbed?

The contractor will be required to conduct asbestos surveying only for the roof areas to be disturbed during the course of the project.

2. If asbestos is found in the structure, will that result in a modification to the contract?

In the event that asbestos-containing material is found that needs to be disturbed during the course of the project, the government would modify the contract in order to provide for the required abatement.

3. Is an alternate roof system acceptable?

Contractors should bid the project as specified. If any contractor has an alternative that he would wish to propose, he may do so as an option, and it will be evaluated.