Section_J_Attachment_2_-_Price_Schedule_-_25Jul13.pdf

PDF 162 KB Posted

Attached to
Repair and Maintain Electrical Distribution System IDIQ Federal contract opportunity
Solicitation number
FA4418-13-R-0012
Issued by
Department of the Air Force Air Mobility Command

About this file

Attach 2 - Price Schedule. Excel

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4418-13-R-0012

Section J, Attachment 2 25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

E001

E001-02 40' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated EA 25

Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting.

E001-03 45' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated EA 25

Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting.

E001-04 50' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated EA 25

Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting.

E001-05 60' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated EA 25

Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting.

E001-06 70' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated EA 25

Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting.

E002

E002-02 Single Arm Construction Wood Cross Arm - 3-1/2" x 4-1/2" x 8'-0" EA 40

Includes installation up to 45' pole. Complete with all hardware and 1-1/4" x 1/4" flat steel braces.

E002-04 Single Arm Construction Fiberglass Cross Arm - 3-1/2" x 4-1/2" x 8'-0" EA 10

Includes installation up to 45' pole. Complete with all hardware and steel angled 1-piece V-braces.

E002-06 Double Arm Construction Wood Cross Arm - 3-1/2" x 4-1/2" x 8'-0" EA 20

Includes installation up to 45' pole. Complete with all hardware and 1-1/4" x 1/4" flat steel braces.

E002-07 Double Arm Construction Wood Cross Arm - 3-3/4" x 4-3/4" x 10'-0" EA 10

Includes installation up to 45' pole. Complete with all hardware and steel angled 1-piece V-braces.

E003

E003-01 Down Guy (complete) - 3/8" Guy Wire - Up to 45' Pole EA 20

Zinc coated, Class A strand 1x7, minimum breaking strength of 10,800 lbs for 3/8", ASTM A- 363, A-475, A-925, A-855, A-640. Includes 8' diameter screw anchor, rod assembly, guy marker, and all equipment and labor for installation.

E030-01- 01 For 10" Screw Anchor, Add EA 5 1

E003-02 Down Guy (complete) - 5/8" Guy Wire - Up to 45' Pole EA 10

Zinc coated, Class A strand 1x7, 15,400 breaking strength, ASTM A-363, A-475, A-925, A- 855, A-640. Includes 10' diameter screw anchor, rod assembly, guy marker, and all equipment and labor for installation.

E003-02- 01 For 10" Screw Anchor, Add EA 5 1

E003-03 Guy Guard Plastic EA 72 Includes material and installation. 6

E003-04 3/8" Guy Wire LF 1500 Zinc coated, Class A strand 1x7, min 10,800 breaking strength, ASTM A-363, A-475, A-925, A- 855, A-640. Includes installation.

E003-05 5/8" Guy Wire LF 500 Zinc coated, Class A strand 1x7, min 15,400 breaking strength, ASTM A-363, A-475, A-925, A- 855, A-640. Includes installation.

E003-06 8" Diameter Screw Anchor EA 24 1" x 66" anchor rod, thimble or twin-eye.

Includes installation. 3

E003-07 10" Diameter Screw Anchor EA 12 1-1/4" x 66" anchor rod, thimble or twin-eye.

Includes installation. 2

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

UTILITY POLES

CROSS ARMS

GUYING

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E003-09 Guy Strain Insulators EA 20 Includes installation to down guy or head guy. 4

E004

E004-01 Pin Insulator with pin - 15 kV Class EA 36 Includes installation, wire jumpers, cable splices, termination and connection to overhead conductor.

E004-02 Suspension Insulator with Clevis and Strain Clamp - 15 kV Class EA 36

Includes installation, wire jumpers and connection means from insulator to pole-mounted transformer, overhead conductor, and/or lightning arrestor.

E004-03 Spool Insulator with Clevis - 15 kV Class EA 24

Includes installation, wire jumpers and connection means from insulator to pole-mounted transformer, overhead conductor, and/or lightning arrestor.

E004-04 1 Spool Secondary Rack EA 12 Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors.

E004-05 2 Spool Secondary Rack EA 12 Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors.

E004-06 3 Spool Secondary Rack EA 12 Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors.

E004-07 4 Spool Secondary Rack EA 12 Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors.

E005

Outdoor load break switch 3-phase, group operated, 3-insulator, vertical break, high strength pin insulators worm gear operating mechanism operating rods, mechanisms, and switch bases are galvanized steel. Includes all brackets and mounting hardware.

E005-01 600A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break EA 10

3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors.

E005-02 1200A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break EA 2

3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors.

E005-03 1600A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break EA 2

3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors.

E005-04 2000A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break EA 2

3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors.

E006

110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, polymer or porcelin design insulators.

Includes fusetube, fuselink as specifed by CO, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser termination. Does not include lightning arrestor.

E006-07 Wildlife Guard EA 20 Polypropylene wildlife protector guard 2

INSULATORS

OUTDOOR LOAD BREAK SWITCH

PRIMARY FUSE CUTOUT - STANDARD CUTOUT

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E007

110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, loadbreak class, polymer or porcelin design insulators, and arc chute interrupter.

Includes fusetube, fuselink as specified by CO, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser terminations. Does not include lightning arrestor

E007-01 100-amp EA 24 110KV BIL, 10kAIC ASYM. 5

E007-02 200-amp EA 24 110KV BIL, 12kAIC ASYM. 5

E007-03 300-amp, Blade Only EA 24

110KV BIL. Includes 300-amp blade, hardware, mounting, bracket(s), cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser terminations.

Does not include lightning arrestor.

E007-04 Wildlife Guard EA 20 Polypropylene wildlife protector guard 4

E008

10kV distribution class heavy duty surge arrestor, 8.4 kVrms MCOV, polymer or porcelain housed metal-oxide design. Includes mounting hardware, bracket, mounting, cable jumpers, clamps, and connections to overhead conductor, ground wire, fuse cutout, and/or pole-mounted transformer or riser terminations.

E008-01 Lightning Arrestor EA 36 6

E008-02 Riser Pole Arrestor EA 24 4

E008-02 15 kV Fuse Cutout/ Surge Arrestor/Combination EA 10

110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, loadbreak class, polymer or porcelin design insulators, and arc chute interrupter.

Includes fusetube, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer. Includes fuselink as specified by the CO. 10kV distribution class surge arrestor, 8.4 kVrms MCOV, polymer or porcelain housed metal-oxide design.

E009

E009-01 Hot Line Clamp/Connector EA 40 Copper,aluminum, or copper/aluminum. Includes installation up to a 45' pole. 6

E009-02 Stirrup EA 48 Copper,aluminum, or copper/aluminum. Includes installation up to a 45' pole. 8

E010

PRIMARY FUSE CUTOUT - LOADBREAK WITH ARC CHUTE INTERRUPTER

LIGHTING ARRESTORS

ACCESSORIES

RECLOSER

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E010-01 Recloser EA 12

Three phase. Maximum design voltage 15.5 kV, nominal operating voltage 12.47 kV, Basic Impulse Level 110 kV, maximum continuous curret 600A, symmetric interrupting current 10 kA, vacuum arc interruption. Includes installation, complete with hardware and connection to overhead line connectors.

E011

7200V-12470V - 95 kV BIL, Insulation Class 15.0 13200V-14400V - 125 kV BIL, Insulation Class 18.0 65 Degrees C temperature rise ANSI C57.2.20 compliant Pressure relief valve Single or two bushing primary for single-phase or three phase connecton. Primary voltage to 13,200V, secondary service voltages combinations 120V, 208V, 240V, 277V, 347V, 480, or 600V. Price includes installation on wood pole or transformer rack, all hardware, jumpers, clamps, and connection to overhead line, lightning arrestors, fuse cutouts, or riser terminations

E011-01 10 KVA EA 5 1

E011-02 15 KVA EA 5 1

E011-03 25 KVA EA 18 4

E011-04 37.5 KVA EA 9 2

E011-05 50 KVA EA 6 1

E011-06 75 KVA EA 3 1

E011-07 100 KVA EA 3 1

E011-09 One piece tripple transfomer Rack, 3kVA through 50kVA EA 5

Min 6000 lb load capacity for all three positions thru 50kVA. Hot dip galvanized. Includes mounting, all hardware, clamps, and connection to pole ground system.

E011-10 One piece tripple transfomer Rack, 75kVA through 333kVA EA 5

Min 15,000 lb load capacity for all three positions thru 50kVA. Hot dip galvanized. Includes mounting, all hardware, clamps, and connection to pole ground system.

E011-12 Wildlife Guard (bushing) EA 12 Polypropylene wildlife protector guard 2

E012

Installation on poles, including securing to insulators, clevises, or other pole-mounted cable connections. Also, includes jumpers and their connection as needed across insulators.

E012-01 #2 Stranded, bare Copper, medium hard drawn LF 3000 600

E012-02 #1/0 Stranded, bare Copper, medium hard drawn LF 3000 600

E012-03 #2 Stranded, bare Aluminum LF 1500 300

POLE-MOUNTED TRANSFORMERS (Overhead Linework)

MEDIUM VOLTAGE STATIC/NEUTRAL CONDUCTORS (Overhead Linework)

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E013

Installation on poles, including securing to insulators, clevises, or other pole-mounted cable connections. Also, includes jumpers and their connection as needed across insulators.

E013-01 #2 Stranded, bare Copper, medium hard drawn LF 3000 600

E013-02 #2/0 Stranded, bare Copper, medium hard drawn LF 3000 600

E013-03 #4/0 Stranded, bare Copper, medium hard drawn LF 3000 600

E013-04 #2/0 Stranded, bare Aluminum, medium hard drawn LF 3000 600

E013-05 #4/0 Stranded, bare Aluminum, medium hard drawn LF 3000 600

E013-06 336 kcmil ACSR Cable (Merlin) LF 3000 600

E014 Includes equipment, installation, connection from pole-mounted transformer to service entrance, and terminations.

E014-01 #4 Stranded Al. LF 1200 200

E014-02 #2 Stranded Al. LF 1200 200

E014-03 #1/0 Stranded Al. LF 1200 200

E014-04 #2/0 Stranded Al. LF 1200 200

E014-05 #3/0 Stranded Al. LF 1200 200

E015

Includes mobilization, augering, receiving pits, dewatering, cleanup to grade, pulling up to two HPDE conduits per bore, compliance with Air Force ETL 07-01 and UFC 3-555-01. DOES

NOT INCLUDE HDPE CONDUIT (SEE LINE

E016).

E015-01 1-2" Diameter HDPE Conduit LF 600

E015-02 1-2-1/2" Diameter HDPE Conduit LF 600

E015-03 1-3" Diameter HDPE Conduit LF 600

E015-04 1-4" Diameter HDPE Conduit LF 600

E015-05 1-5" Diamter HDPE Conduit LF 300

E015-06 1-6" Diameter HDPE Conduit LF 300

E015-07 2-2" Diameter HDPE Conduits LF 600

E015-08 2-3" Diameter HDPE Conduits LF 600

E015-09 2-4" Diameter HDPE Conduits LF 600

E015-10 2-5" Diameter HDPE Conduits LF 300

E015-11 2-6" Diameter HDPE Conduits LF 300

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

MEDIUM VOLTAGE PHASE CONDUCTORS

(Overhead Linework)

ALUMINUM TRIPLEX SERVICE DROP

DIRECTIONAL BORING

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E016

Pulled in place by boring machine. Includes pipe welding. Compliance with Air Force ETL 07-01 and UFC 3-555-01, which includes transition to grade Schedule 80 conduit, Schedule 80 elbows, conduit bells, conduit seals, heavy duty polyester composite double braid pull rope, and ETL 07-01 and UFC 3-550-01 compliant concrete encasement to grade. Includes pipe welding as specified in AF guidance. DOES

NOT INCLUDE HORIZONTAL DIRECTIONAL

BORE OR CONCRETE EQUIPMENT PAD.

SEE LINE ITEM E015, DIRECTIONAL BORING.

E016-01 2" HDPE LF 600

E016-02 2-1/2" HDPE LF 600

E016-03 3" HDPE LF 600

E016-04 4" HDPE LF 600

E016-05 5" HDPE LF 300

E016-06 6" HDPE LF 300

E017 Shielded, XLP Insulated, 15 kV, 133 Percent Insulation

E017-01 (In-Duct) #1 Aluminum, EPR. 15 KV LF 1000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-02 (In-Duct) #1/0 Aluminum, EPR. 15 KV LF 1000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-03 (In-Duct) #2/0 Aluminum, EPR. 15 KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-04 (In-Duct) #4/0 Aluminum, EPR. 15 KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-05 (In-Duct) 250 kcmil Aluminum, EPR.

15 KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-06 (In-Duct) 350 kcmil Aluminum, EPR.

15 KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-07 (In-Duct) 500 kcmil Aluminum, EPR.

15 KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-08 (In-Duct) #2 Copper, EPR, 15KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-09 (In-Duct) #1 Copper, EPR, 15KV LF 1000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-10 (In-Duct) #1/0 Copper, EPR, 15KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-11 (In-Duct) #2/0 Copper, EPR, 15KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

High Density Polyethylene Pipe (HDPE) - Directional Bore Installation only.

MEDIUM VOLTAGE CABLES (Underground Linework)

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E017-12 (In-Duct) #4/0 Copper, EPR, 15KV LF 2000 Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-13 (In-Duct) 250 kcmil Copper, EPR, 15KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-14 (In-Duct) 350 kcmil Copper, EPR, 15KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-15 (In-Duct) 500 kcmil Copper, EPR, 15KV LF 3000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-16 (In-Duct) 750 kcmil Copper, EPR, 15

KV LF 1000

Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill.

E017-17 (Direct Bury) #1 Aluminum, EPR. 15 KV LF 1000

Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited.

E017-18 (Direct Bury) #1/0 Aluminum, EPR. 15 K LF 1000

Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited.

E017-19 (Direct Burial) #2 Copper, EPR, 15KV LF 1000

Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited.

E017-20 (Direct Burial) #1/0 Copper, EPR, 15KV LF 3000

Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited.

E017-21 Utility Trench (Chain Trencher) LF 2000 Includes exavation, compaction, backfill and final grading. 8" wide, 36" deep trench, medium soil.

E017-22 Utility Trench (Backhoe) LF 2000 Includes exavation, compaction, backfill and final grading. 8" wide, 36" deep trench, medium soil.

E018 Includes installation and mounting on concrete equipment pad. Does not include cable terminations.

E018-01 Pad Mounted - Metal Enclosed Oil Filled 15KV - 95 KV BIL (2-Switches - 2-VFI)

EA 2 1

E018-02 Pad Mounted - Metal Enclosed Air Switches 15 KV- 95 BIL (2-Switches - 2-Fused)

EA 2 1

E019

E019-01 4-Point Connection, 200A EA 6 Includes installation and mounting on concrete equipment pad. Does not include cable terminations.

E019-02 4-Point Connection, 600A EA 12 Includes installation and mounting on concrete equipment pad. Does not include cable terminations.

E019-03 3-Point Connection x 4, 200A EA 12 Includes installation and mounting on concrete equipment pad. Does not include cable terminations.

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

JUNCTION ENCLOSURES (Underground Linework)

SECTIONALIZING SWITCH (Underground Linework)

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E020

E020-01 CABLE SPLICE #4 STRANDED EA 6 1

E020-02 CABLE SPLICE #2 STRANDED EA 6 1

E020-03 CABLE SPLICE #1/0 STRANDED EA 24 5

E021 15 kV voltage class meeting IEEE Standard 386.

Up to 500 kcmil.

E021-01 600A Loadbreak Elbow EA 12 1

E021-02 200A Loadbreak Elbow EA 12 1

E022

E022-01 CABLE TERMINATION #4

STRANDED EA 6 1

E022-02 INSTALL CABLE TERMINATION #2

STRANDED EA 6 1

E022-03 INSTALL CABLE TERMINATION

#1/0 STRANDED EA 24 5

E023

12470Y/7200V, 13,200Y/7620V, 13800Y/7920V Dead Front Taps: Split +/- 2-1/2% 65 Degrees C temperature rise Liquid Type: Mineral oil Connection: Loop Feed HV Bushings: Wells and Inserts LV Bushiings: Spade-6 hole Fusing: Bay-O-Net Arrester(s): Installed Primary voltage to 13,200V, secondary service voltages combinations 240V/120V, 480V/240V.

Price includes installation on concrete pad.

Without Meters

E023-01 25KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 1 1

E023-02 37.5KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 4 1

E023-03 50KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 20 4

E023-04 75KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 4 1

E023-05 100KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 2 1

E023-06 167KVA PAD MOUNTED

TRANSFORMERS (1 PHASE) EA 1 1

MEDIUM VOLTAGE CABLE SPLICE (Underground Linework)

MEDIUM VOLTAGE CABLE ELBOWS (Underground Linework)

CABLE TERMINATION (Underground Linework)

PAD MOUNTED TRANSFORMERS (1 PHASE)

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E024

Primary: 12470Y/7200V, 13,200Y/7620V, 13800Y/7920V Secondary: 480Y/277, 208Y/120 BIL- 95kV Copper Windings Dead Front Taps: Split +/- 2-1/2% 65 Degrees C temperature rise Liquid Type: Mineral oil Connection: Loop Feed with ON-OFF Radial Switch HV Bushings: Wells and Inserts LV Bushiings: Spade-6 hole Fusing: Bay-O-Net with current limiting fusing with one spare set of fuses Arresters: Installed Price includes installation on concrete pad and secondary cable terminations. Does not include MV terminations

E024-01 75KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 4 1

E024-02 112.5KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 2 1

E024-03 150KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 2 1

E024-04 225KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 1 1

E024-05 300KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 1 1

E024-06 500KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 1 1

E024-07 750KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 1 1

E024-08 1000KVA PAD MOUNT

TRANSFORMERS (3 PHASE) EA 1 1

E025

Includes equipment mobilization, excavation, forms, rebar, 3000 psi concrete, smooth finish, form removal and disposal, finish grading, and installation of ground loop system IAW UFC 3- 530-01.

E025-01 6’ x 6’ x 8” = 0.89CY Reinforced concrete transformer pad EA 15 3

E025-02 7’ x 7’ x 8” = 1.21CY Reinforced concrete transformer pad EA 15 3

E025-03 8’ x 8’ x 8” = 1.58CY Reinforced concrete transformer pad EA 15 3

E026

E026-01 Manhole EA 2 Manholes shall be compliant with AF ETL 10-17, Electrical Manhole Design. Includes excavation, installation, and final grading.

E027 Includes hardware, brackets, installation, fabrication (if necessary), equipment modification, wiring, and all terminations.

PAD MOUNTED TRANSFORMERS (3 PHASE)

REINFORCED CONCRETE TRANSFORMER PAD

MANHOLES

LOW VOLTAGE METERS

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E027-01

LOW VOLT INSTR. METER

INSTALLED ON EXISITNG POLE

INCLUDES METER, SOCKET, CTs, CT MOUNTING BRACKET, INSTRUMENT WIRING AND MISC

CONDUIT FITTINGS.

EA 6 1

E027-02

LOW VOLT INSTR. METER

INSTALLED ON PADMOUNT

INCLUDES METER, SOCKET, CTs, INSTRUMENT WIRING AND MISC

CONDUIT FITTINGS.

EA 6 1

E027-03

LOW VOLT SELF CONT. MTR. UP

TO 200 AMP INCLUDES 2"

CONDUIT RISER & 3/0

CONDUCTORS, METERBASE,

MISC CONDUIT FITTINGS, 10' 2"

RIGID STEEL, BUSHINGS 2 PER

STRAP & STRUT, AND WEATHER

HEAD. (GOVT. OWNED)

EA 6 1

E027-04

15KV. PRIMARY METER ON

EXISTING POLE INCLUDES

SOCKET, METER, WIRING, CTs, PTs

AND MOUNTING BRACKET ON

CROSSARMS.

EA 4 1

E027-05 DELETED

E027-06 DELETED

E027-07 DELETED

E026-08 DELETED

E028

E028-01 DELETED

E029

E029-01

Load Center, NEMA 3R, 120/240 volt, 100 ampere main breaker, single phase, 3 wire, service entrance rated, 12 pole, breakers not included.

EA 18 4

E029-02

Load Center, NEMA 3R, 120/240 volt, 200 ampere main breaker, single phase, 3 wire, service entrance rated, 40 pole, breakers not included.

EA 4 1

E029-03

Panelboard, 120/208 volt, 100 ampere main breaker, three phase, 4 wire, service entrance rated, 24 pole, breakers not included.

EA 4 1

E029-04

Panelboard, 120/208 volt, 225 ampere main breaker, three phase, 4 wire, service entrance rated, 42 pole, breakers not included.

EA 2 1

E030 600V, Stranded Type THHN, XHHW, or THWN Copper

E030-01 #12 CLF 10 2

E030-02 #10 CLF 10 2

WIRE

ELECTRICAL PANELS

DELETED

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E030-03 #8 CLF 10 2

E030-04 #6 CLF 10 2

E030-05 #4 CLF 10 2

E050-06 #2 CLF 8 2

E030-07 #1 CLF 8 2

E030-08 #1/0 CLF 4 1

E030-09 #2/0 CLF 4 1

E030-10 #3/0 CLF 4 1

E030-11 #4/0 CLF 4 1

E030-12 250 kcmil CLF 4 1

E030-13 350 kcmil CLF 4 1

E030-14 #500 kcmil CLF 4 1

E031 E031-01 1/2" conduit LF 1000 200

E031-02 3/4" conduit LF 1000 200

E031-03 1" conduit LF 1000 200

E031-04 1-1/4" conduit LF 1000 200

E031-05 1-1/2" conduit LF 1000 200

E031-06 2"conduit LF 1000 200

E031-07 2-1/2" conduit LF 1000 200 E032 E032-01 1" Diameter LF 1000 200

E032-02 2" Diameter LF 1000 200

E032-03 3" Diameter LF 1000 200

E032-04 4" Diameter LF 1000 200

E032-05 5" Diameter LF 1000 200

E032-06 6" Diameter LF 1000 200

E033 Includes couplings, rubber conduit seal, strapping to pole or structure, and conduit elbows

E033-01 RISER CONDUIT (UP TO 4" PVC) LF 500 100

E033-02 RISER CONDUIT (UP TO 4" GALV.

STEEL) LF 200 40

E034 E034-01 Install Buried Cable Tape CLF 2000 E035

E035-01 Bore Under Pavement LF 1000 12" diameter maximum bore, medium soil.

Includes mobilization, setup, cleanup, and excavation. Does not include conduit.

E036

Demo - N/A

Demo - N/A

CONDUIT, RIGID GALVANIZED STEEL (including couplings)

PVC Conduit - Schedule 40

RISER CONDUIT

BURIED CABLE TAPE

BORING UNDER PAVEMENT

PHOTOCELL

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E036-01 Replace Photocell EA 200 E037

E037-01 250 WATT EA 200 40

E037-02 400 WATT EA 50 10

E037-03 1000 WATT EA 50 10

E038 Includes installation, hardware, and connection of fixture wiring power.

E038-01 250 WATT (High Pressure Sodium) EA 10 2 E038-02 400 WATT (High Pressure Sodium) EA 20 4 E038-03 1000 WATT (High Pressure Sodium) EA 10 2 E039

E039-01 175 WATT EA 10 2

E039-02 250 WATT EA 10 2

E039-03 400 WATT EA 20 4

E040

E040-01 #12 COPPER THWN/THHN OR UF LF 1000

E040-02 #10 COPPER THWN/THHN OR UF LF 1000

E040-03 #8 COPPER THWN/THHN OR UF LF 1000

E040-04 #6 COPPER THWN/THHN OR UF LF 1000

E041 Material and installation shall be IAW UFGS-26 41 01.00 10.

E041-01 75' Telescoping Masts EA 10 Includes concrete base and grounding system. 2

E041-02 #2/0 Bare Copper Overhead Conductor (Shield Wires) LF 1000 200

E041-03 #2/0 Stranded Copper Down Conductor LF 100 20

E041-04 Overhead Conductor Connection Hardware EA 100

Includes all hardware for connecting one overhad wire to mast, e.g. bolts, nuts, washers, anchor rod clamp, clamps, pole bands, connectors, and jumpers.

E041-05 Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 12" threaded without Support Brackets

EA 25 To 75' high. Includes base and attachment to facility. 5

E041-06 Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 24" threaded with Support Brackets

EA 20 4

E041-07 Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 36" threaded with Support Brackets

EA 100 20

E041-08 Grounding Access Well - 12" diameter, 18" long, Schedule 80 PVC, galvanized steel lid.

EA 20 4

E041-09

Mounting Base for 5/8" Air Terminals.

Vertical, horizontal, ridge,or sloping roof mounting configuration. Adhesive or bolted.

EA 100 20

E041-10 Bonds to metallic structures EA 100 Includes hardware and copper bonding straps 3/4" x 9.5" 20

E041-11 Ground rods - 3/4" x 10' Copper Clad EA 25 5

Demo - N/A

Demo - N/A Demo - N/A Demo - N/A Demo - N/A

STREETLIGHT FIXTURE (Includes lamp and photocell)

UNDERGROUND STREETLIGHT CABLE (DIRECT BURIED)

LIGHTNING PROTECTION SYSTEMS

RELAMP FLOODLIGHT/STREETLIGHT

FLOOD LIGHT FIXTURES (Includes lamp and photocell)

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E041-12 Copper Bonding Conductors, tinned, braided ribbon type with connection lugs-#6 Copper solid - 12"

EA 25 5

E041-13 Copper Bonding Conductors, tinned, braided ribbon type with connection lugs-#6 Copper solid - 18"

EA 25 5

E041-14 Copper Bonding Conductors, tinned, braided ribbon type with connection lugs-#6 Copper solid - 24"

EA 25 5

E041-15 Exothermic Connections (to #2/0) EA 50 10

E041-16 High Compression Connectors (Copper) EA 100 20

E041-17 Conductor anchors/supports EA 100 20 E041-18 Connector- cable to bar (Copper) EA 100 20 E041-19 Grounding Conductors (#2/0 Copper) LF 1000 200 E041-20 Electrical panel surge arrestors EA 10 2 E042 E042-01 Lump sum $100 EA 30

E042-02 Lump sum $200 EA 30

E042-03 Lump sum $300 EA 30 E043

E043-01 Superintendent - Regular Hours HOUR 75

E043-02 Superintendent - Overtime Hours HOUR 25

E043-03 Superintendent - Emergency Response HOUR 75

E043-10 Foreman - Regular Hours HOUR 75

E043-11 Foreman - Overtime Hours HOUR 25

E043-12 Foreman - Emergency Response HOUR 150

E043-20 Electrician/Lineman - Regular Hours HOUR 75

E043-21 Electrician/Lineman - Overtime Hours HOUR 25

E043-22 Electrician/Lineman - Emergency Response HOUR 150

E043-30 Apprentice - Regular Hours HOUR 75

E043-31 Apprentice - Overtime Hours HOUR 25

E043-32 Apprentice - Emergency Response HOUR 75

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

MISCELLANEOUS MINOR MATERIALS

LABOR HOURS

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E043-40 Laborer - Regular Hours HOUR 75

E043-41 Laborer - Overtime Hours HOUR 75

E043-42 Laborer - Emergency Response HOUR 75

E043-50 Professional Registered Testing Engineer HOUR 800

E044

E044-01 BUCKET TRUCK - EMERGENCY

RESPONSE EQUPMENT HOUR 150

E044-02 BUCKET TRUCK - REGULAR

HOURS HOUR 75

E044-03 LINE TRUCK (DIGGER) -

EMERGENCY RESPONSE HOUR 150

E044-04 LINE TRUCK (DIGGER) - REGULAR

HOURS HOUR 75

E044-05 TRENCHER - REGULAR OR

EMERGENCY RESPONSE HOUR 40

E044-06 HI-POT-UNIT - REGULAR OR

EMERGENCY RESPONSE HOUR 40

E045

E045-01 Tree Trimming labor & equipment HOUR 300

E046

E046-01 Asphalt Cutting Removal & Replacement SQ FT 200

E047

E047-01 Concrete Cutting Removal & Replacement SQ FT 100

E048 Drilling of reinforced concrete slab up to 6" thick, includes bit, layout and setup, and cleanup.

E048-01 1" Diameter Core EA 6

E048-01-01 Each added inch thickness in same hole, add EA 2

E048-02 2" Diameter Core EA 6

E048-02-01 Each added inch thickness in same hole, add EA 2

E048-03 3" Diameter Core EA 6

E048-03-01 Each added inch thickness in same hole, add EA 2

E048-04 4" Diameter Core EA 6

E048-04-01 Each added inch thickness in same hole, add EA 2

E048-05 5" Diameter Core EA 6

E048-05-01 Each added inch thickness in same hole, add EA 2

E049 Non-metallic piping.

E049-01 4" Conduit EA 2

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

PENTRATION FIRESTOPPING (MANHOLE)

Demo - N/A

Demo - N/A

Demo - N/A

Equipment

TREE TRIMMING

ASPHALT REMOVAL & REPLACEMENT

CONCRETE REMOVAL & REPLACEMENT

CONCRETE DRILLING

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

Demo - N/A

25 July 2013

Repair and Maintain Electrical Distribution System IDIQ Price Schedule

INSTALLATION

QUANTITY

UNIT

INSTALLATION

COST

TOTAL

PRICE COMMENTS DEMOLITION

QUANTITY

UNIT

DEMOLITION

COST

TOTAL

PRICE COMMENTS

I. D. # LINE ITEM DESCRIPTION UNIT

INSTALLATION OF LINE ITEMS DEMOLITION OF LINE ITEMS

E049-02 5" Conduit EA 2 E050

E050-01 Installation and Maintenance of Ventalation System (per manhole) EA 4 Includes ventilation setup and compliance with

UFC 3-560-01, Electrical Safety O&M.

E051

E051-01 Performance Bond (Rate per Thousand) Unit 1

E051-02 Payment Bond (Rate Per Thousand) Unit 1

SubTotals

Rate Escalation Rate

Option Total with Escalation Rate Option Year 1

Option Year 2

Option Year 3

Option Year 4

Demo - N/A

SubTotals

Total

Demo - N/A

Demo - N/A

Demo - N/A

CONFINED SPACE ENTRY SUPPORT SERVICES

BONDS

Price Schedule