Attachment_2_-_Price_Schedule.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- Repair and Maintain Electrical Distribution System IDIQ Federal contract opportunity
- Solicitation number
- FA4418-13-R-0012
About this file
Price Schedule (Excel) - Attachment 2
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| I. D. # | LINE ITEM DESCRIPTION | UNIT | INSTALLATION OF LINE ITEMS | DEMOLITION OF LINE ITEMS | |||
| INSTALLATION QUANTITY | UNIT INSTALLATION COST | TOTAL | |||||
| PRICE | COMMENTS | DEMOLITION | |||||
| QUANTITY | UNIT |
DEMOLITION
| COST | TOTAL | |||||
| PRICE | COMMENTS | |||||
| E001 | UTILITY POLES | |||||
| E001-02 | 40' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated | EA | 25 | Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting. | 3 | |
| E001-03 | 45' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated | EA | 25 | Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting. | 3 | |
| E001-04 | 50' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated | EA | 25 | Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting. | 3 | |
| E001-05 | 60' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated | EA | 25 | Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting. | 3 | |
| E001-06 | 70' CLASS 3, Southern Yellow Pine (S.Y.P.) Treated | EA | 25 | Machine dig and set in average earth. Includes #4 Pole-butt ground system, material handling and spotting. | 3 | |
| E002 | CROSS ARMS | |||||
| E002-02 | Single Arm Construction Wood Cross Arm - 3-1/2" x 4-1/2" x 8'-0" | EA | 40 | Includes installation up to 45' pole. Complete with all hardware and 1-1/4" x 1/4" flat steel braces. | 5 | |
| E002-04 | Single Arm Construction Fiberglass Cross Arm - 3-1/2" x 4-1/2" x 8'-0" | EA | 10 | Includes installation up to 45' pole. Complete with all hardware and steel angled 1-piece V-braces. | 2 | |
| E002-06 | Double Arm Construction Wood Cross Arm - 3-1/2" x 4-1/2" x 8'-0" | EA | 20 | Includes installation up to 45' pole. Complete with all hardware and 1-1/4" x 1/4" flat steel braces. | 3 | |
| E002-07 | Double Arm Construction Wood Cross Arm - 3-3/4" x 4-3/4" x 10'-0" | EA | 10 | Includes installation up to 45' pole. Complete with all hardware and steel angled 1-piece V-braces. | 2 | |
| E003 | GUYING | |||||
| E003-01 | Down Guy (complete) - 3/8" Guy Wire - Up to 45' Pole | EA | 20 | Zinc coated, Class A strand 1x7, minimum breaking strength of 10,800 lbs for 3/8", ASTM A-363, A-475, A-925, A-855, A-640. Includes 8' diameter screw anchor, rod assembly, guy marker, and all equipment and labor for installation. | 2 | |
| E0030-01-01 | For 10" Screw Anchor, Add | EA | 5 | 1 | ||
| E003-02 | Down Guy (complete) - 5/8" Guy Wire - Up to 45' Pole | EA | 10 | Zinc coated, Class A strand 1x7, 15,400 breaking strength, ASTM A-363, A-475, A-925, A-855, A-640. Includes 10' diameter screw anchor, rod assembly, guy marker, and all equipment and labor for installation. | 2 | |
| E003-02-01 | For 10" Screw Anchor, Add | EA | 5 | 1 | ||
| E003-03 | Guy Guard Plastic | EA | 72 | Includes material and installation. | 6 | |
| E003-04 | 3/8" Guy Wire | LF | 1500 | Zinc coated, Class A strand 1x7, min 10,800 breaking strength, ASTM A-363, A-475, A-925, A-855, A-640. Includes installation. | 150 | |
| E003-05 | 5/8" Guy Wire | LF | 500 | Zinc coated, Class A strand 1x7, min 15,400 breaking strength, ASTM A-363, A-475, A-925, A-855, A-640. Includes installation. | 50 | |
| E003-06 | 8" Diameter Screw Anchor | EA | 24 | 1" x 66" anchor rod, thimble or twin-eye. Includes installation. | 3 | |
| E003-07 | 10" Diameter Screw Anchor | EA | 12 | 1-1/4" x 66" anchor rod, thimble or twin-eye. Includes installation. | 2 | |
| E003-09 | Guy Strain Insulators | EA | 20 | Includes installation to down guy or head guy. | 4 | |
| E004 | INSULATORS | |||||
| E004-01 | Pin Insulator with pin - 15 kV Class | EA | 36 | Includes installation, wire jumpers, cable splices, termination and connection to overhead conductor. | 6 | |
| E004-02 | Suspension Insulator with Clevis and Strain Clamp - 15 kV Class | EA | 36 | Includes installation, wire jumpers and connection means from insulator to pole-mounted transformer, overhead conductor, and/or lightning arrestor. | 6 | |
| E004-03 | Spool Insulator with Clevis - 15 kV Class | EA | 24 | Includes installation, wire jumpers and connection means from insulator to pole-mounted transformer, overhead conductor, and/or lightning arrestor. | 4 | |
| E004-04 | 1 Spool Secondary Rack | EA | 12 | Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors. | 3 | |
| E004-05 | 2 Spool Secondary Rack | EA | 12 | Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors. | 3 | |
| E004-06 | 3 Spool Secondary Rack | EA | 12 | Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors. | 3 | |
| E004-07 | 4 Spool Secondary Rack | EA | 12 | Includes mounting and complete installation, including wire jumpers, connectors, and splicing connection to overhead conductors. | 3 | |
| E005 | OUTDOOR LOAD BREAK SWITCH | Outdoor load break switch 3-phase, group operated, 3-insulator, vertical break, high strength pin insulators worm gear operating mechanism operating rods, mechanisms, and switch bases are galvanized steel. Includes all brackets and mounting hardware. | ||||
| E005-01 | 600A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break | EA | 10 | 3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors. | 1 | |
| E005-02 | 1200A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break | EA | 2 | 3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors. | 1 | |
| E005-03 | 1600A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break | EA | 2 | 3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors. | 1 | |
| E005-04 | 2000A, 14.4 kV, Outdoor Load Break Switch, 3-Phase Vertical Break | EA | 2 | 3-Phase Vertical Break, 3 Insulator. Includes mounting, cable jumpers, clamps, and connection to overhead conductors. | 1 | |
| E006 | PRIMARY FUSE CUTOUT - STANDARD CUTOUT | 110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, polymer or porcelin design insulators. Includes fusetube, fuselink as specifed by CO, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser termination. Does not include lightning arrestor. | ||||
| E006-07 | Wildlife Guard | EA | 20 | Polypropylene wildlife protector guard | 2 | |
| E007 | PRIMARY FUSE CUTOUT - LOADBREAK WITH ARC CHUTE INTERRUPTER | 110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, loadbreak class, polymer or porcelin design insulators, and arc chute interrupter. Includes fusetube, fuselink as specified by CO, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser terminations. Does not include lightning arrestor. | ||||
| E007-01 | 100-amp | EA | 24 | 110KV BIL, 10kAIC ASYM. | 5 | |
| E007-02 | 200-amp | EA | 24 | 110KV BIL, 12kAIC ASYM. | 5 | |
| E007-03 | 300-amp, Blade Only | EA | 24 | 110KV BIL. Includes 300-amp blade, hardware, mounting, bracket(s), cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer or riser terminations. Does not include lightning arrestor. | 5 | |
| E007-04 | Wildlife Guard | EA | 20 | Polypropylene wildlife protector guard | 4 | |
| E008 | LIGHTING ARRESTORS | 10kV distribution class heavy duty surge arrestor, 8.4 kVrms MCOV, polymer or porcelain housed metal-oxide design. Includes mounting hardware, bracket, mounting, cable jumpers, clamps, and connections to overhead conductor, ground wire, fuse cutout, and/or pole-mounted transformer or riser terminations. | ||||
| E008-01 | Lightning Arrestor | EA | 36 | 6 | ||
| E008-02 | Riser Pole Arrestor | EA | 24 | 4 | ||
| E008-02 | 15 kV Fuse Cutout/ Surge Arrestor/Combination | EA | 10 | 110 kV BIL, 15 kV max design voltage, 14.4 kV nominal, loadbreak class, polymer or porcelin design insulators, and arc chute interrupter. Includes fusetube, hardware, mounting, NEMA heavy duty bracket(s) for crossarm or direct pole mounting, cable jumpers, parallel-groove terminal clamps, and connections to overhead conductor, lightning arrestor, and/or pole-mounted transformer. Includes fuselink as specified by the CO. 10kV distribution class surge arrestor, 8.4 kVrms MCOV, polymer or porcelain housed metal-oxide design. | 2 | |
| E009 | ACCESSORIES | |||||
| E009-01 | Hot Line Clamp/Connector | EA | 40 | Copper,aluminum, or copper/aluminum. Includes installation up to a 45' pole. | 6 | |
| E009-02 | Stirrup | EA | 48 | Copper,aluminum, or copper/aluminum. Includes installation up to a 45' pole. | 8 | |
| E010 | RECLOSER | |||||
| E010-01 | Recloser | EA | 12 | Three phase. Maximum design voltage 15.5 kV, nominal operating voltage 12.47 kV, Basic Impulse Level 110 kV, maximum continuous curret 600A, symmetric interrupting current 10 kA, vacuum arc interruption. Includes installation, complete with hardware and connection to overhead line connectors. | 1 | |
| E011 | POLE-MOUNTED TRANSFORMERS (Overhead Linework) | 7200V-12470V - 95 kV BIL, Insulation Class 15.0 |
13200V-14400V - 125 kV BIL, Insulation Class 18.0 65 Degrees C temperature rise ANSI C57.2.20 compliant Pressure relief valve Single or two bushing primary for single-phase or three phase connecton. Primary voltage to 13,200V, secondary service voltages combinations 120V, 208V, 240V, 277V, 347V, 480, or 600V. Price includes installation on wood pole or transformer rack, all hardware, jumpers, clamps, and connection to overhead line, lightning arrestors, fuse cutouts, or riser terminations.
| E011-01 | 10 KVA | EA | 5 | 1 | ||||
| E011-02 | 15 KVA | EA | 5 | 1 | ||||
| E011-03 | 25 KVA | EA | 18 | 4 | ||||
| E011-04 | 37.5 KVA | EA | 9 | 2 | ||||
| E011-05 | 50 KVA | EA | 6 | 1 | ||||
| E011-06 | 75 KVA | EA | 3 | 1 | ||||
| E011-07 | 100 KVA | EA | 3 | 1 | ||||
| E011-09 | One piece tripple transfomer Rack, 3kVA through 50kVA | EA | 5 | Min 6000 lb load capacity for all three positions thru 50kVA. Hot dip galvanized. Includes mounting, all hardware, clamps, and connection to pole ground system. | 1 | |||
| E011-10 | One piece tripple transfomer Rack, 75kVA through 333kVA | EA | 5 | Min 15,000 lb load capacity for all three positions thru 50kVA. Hot dip galvanized. Includes mounting, all hardware, clamps, and connection to pole ground system. | 1 | |||
| E011-12 | Wildlife Guard (bushing) | EA | 12 | Polypropylene wildlife protector guard | 2 | |||
| E012 | MEDIUM VOLTAGE STATIC/NEUTRAL CONDUCTORS (Overhead Linework) | Installation on poles, including securing to insulators, clevises, or other pole-mounted cable connections. Also, includes jumpers and their connection as needed across insulators. | ||||||
| E012-01 | #2 Stranded, bare Copper, medium hard drawn | LF | 3000 | 600 | ||||
| E012-02 | #1/0 Stranded, bare Copper, medium hard drawn | LF | 3000 | 600 | ||||
| E012-03 | #2 Stranded, bare Aluminum | LF | 1500 | 300 | ||||
| E013 | MEDIUM VOLTAGE PHASE CONDUCTORS | |||||||
| (Overhead Linework) | Installation on poles, including securing to insulators, clevises, or other pole-mounted cable connections. Also, includes jumpers and their connection as needed across insulators. | |||||||
| E013-01 | #2 Stranded, bare Copper, medium hard drawn | LF | 3000 | 600 | ||||
| E013-02 | #2/0 Stranded, bare Copper, medium hard drawn | LF | 3000 | 600 | ||||
| E013-03 | #4/0 Stranded, bare Copper, medium hard drawn | LF | 3000 | 600 | ||||
| E013-04 | #2/0 Stranded, bare Aluminum, medium hard drawn | LF | 3000 | 600 | ||||
| E013-05 | #4/0 Stranded, bare Aluminum, medium hard drawn | LF | 3000 | 600 | ||||
| E013-06 | 336 kcmil ACSR Cable (Merlin) | LF | 3000 | 600 | ||||
| E014 | ALUMINUM TRIPLEX SERVICE DROP | Includes equipment, installation, connection from pole-mounted transformer to service entrance, and terminations. | ||||||
| E014-01 | #4 Stranded Al. | LF | 1200 | 200 | ||||
| E014-02 | #2 Stranded Al. | LF | 1200 | 200 | ||||
| E014-03 | #1/0 Stranded Al. | LF | 1200 | 200 | ||||
| E014-04 | #2/0 Stranded Al. | LF | 1200 | 200 | ||||
| E014-05 | #3/0 Stranded Al. | LF | 1200 | 200 | ||||
| E015 | DIRECTIONAL BORING | Includes mobilization, augering, receiving pits, dewatering, cleanup to grade, pulling up to two HPDE conduits per bore, compliance with Air Force ETL 07-01 and UFC 3-555-01. DOES NOT INCLUDE HDPE CONDUIT (SEE LINE E016). | ||||||
| E015-01 | 1-2" Diameter HDPE Conduit | LF | 600 | Demo - N/A | ||||
| E015-02 | 1-2-1/2" Diameter HDPE Conduit | LF | 600 | Demo - N/A | ||||
| E015-03 | 1-3" Diameter HDPE Conduit | LF | 600 | Demo - N/A | ||||
| E015-04 | 1-4" Diameter HDPE Conduit | LF | 600 | Demo - N/A | ||||
| E015-05 | 1-5" Diamter HDPE Conduit | LF | 300 | Demo - N/A | ||||
| E015-06 | 1-6" Diameter HDPE Conduit | LF | 300 | Demo - N/A | ||||
| E015-07 | 2-2" Diameter HDPE Conduits | LF | 600 | Demo - N/A | ||||
| E015-08 | 2-3" Diameter HDPE Conduits | LF | 600 | Demo - N/A | ||||
| E015-09 | 2-4" Diameter HDPE Conduits | LF | 600 | Demo - N/A | ||||
| E015-10 | 2-5" Diameter HDPE Conduits | LF | 300 | Demo - N/A | ||||
| E015-11 | 2-6" Diameter HDPE Conduits | LF | 300 | Demo - N/A | ||||
| E016 | High Density Polyethylene Pipe (HDPE) - Directional Bore Installation only. | Pulled in place by boring machine. Includes pipe welding. Compliance with Air Force ETL 07-01 and UFC 3-555-01, which includes transition to grade Schedule 80 conduit, Schedule 80 elbows, conduit bells, conduit seals, heavy duty polyester composite double braid pull rope, and ETL 07-01 and UFC 3-550-01 compliant concrete encasement to grade. Includes pipe welding as specified in AF guidance. DOES NOT INCLUDE HORIZONTAL DIRECTIONAL BORE OR CONCRETE EQUIPMENT PAD. SEE LINE ITEM E015, DIRECTIONAL BORING. | ||||||
| E016-01 | 2" HDPE | LF | 600 | Demo - N/A | ||||
| E016-02 | 2-1/2" HDPE | LF | 600 | Demo - N/A | ||||
| E016-03 | 3" HDPE | LF | 600 | Demo - N/A | ||||
| E016-04 | 4" HDPE | LF | 600 | Demo - N/A | ||||
| E016-05 | 5" HDPE | LF | 300 | Demo - N/A | ||||
| E016-06 | 6" HDPE | LF | 300 | Demo - N/A | ||||
| E017 | MEDIUM VOLTAGE CABLES (Underground Linework) | Shielded, XLP Insulated, 15 kV, 133 Percent Insulation | ||||||
| E017-01 | (In-Duct) #1 Aluminum, EPR. 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-02 | (In-Duct) #1/0 Aluminum, EPR. 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-03 | (In-Duct) #2/0 Aluminum, EPR. 15 KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 200 | |||
| E017-04 | (In-Duct) #4/0 Aluminum, EPR. 15 KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-05 | (In-Duct) 250 kcmil Aluminum, EPR. 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-06 | (In-Duct) 350 kcmil Aluminum, EPR. 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-07 | (In-Duct) 500 kcmil Aluminum, EPR. 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-08 | (In-Duct) #2 Copper, EPR, 15KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 200 | |||
| E017-09 | (In-Duct) #1 Copper, EPR, 15KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-10 | (In-Duct) #1/0 Copper, EPR, 15KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 200 | |||
| E017-11 | (In-Duct) #2/0 Copper, EPR, 15KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 200 | |||
| E017-12 | (In-Duct) #4/0 Copper, EPR, 15KV | LF | 2000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 200 | |||
| E017-13 | (In-Duct) 250 kcmil Copper, EPR, 15KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-14 | (In-Duct) 350 kcmil Copper, EPR, 15KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-15 | (In-Duct) 500 kcmil Copper, EPR, 15KV | LF | 3000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 300 | |||
| E017-16 | (In-Duct) 750 kcmil Copper, EPR, 15 KV | LF | 1000 | Includes cable pulling tension calculations, installation in conduit to not exceed maximum values, jam ratios, or conduit fill. | 100 | |||
| E017-17 | (Direct Bury) #1 Aluminum, EPR. 15 KV | LF | 1000 | Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited. | Demo - N/A | |||
| E017-18 | (Direct Bury) #1/0 Aluminum, EPR. 15 KV | LF | 1000 | Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited. | Demo - N/A | |||
| E017-19 | (Direct Burial) #2 Copper, EPR, 15KV | LF | 1000 | Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited. | Demo - N/A | |||
| E017-20 | (Direct Burial) #1/0 Copper, EPR, 15KV | LF | 3000 | Includes survey to clear area and installation of cable in trench. Does not include trenching, backfill, and final grading. Underground splicing is prohibited. | Demo - N/A | |||
| E017-21 | Utility Trench (Chain Trencher) | LF | 2000 | Includes exavation, compaction, backfill and final grading. 8" wide, 36" deep trench, medium soil. | Demo - N/A | |||
| E017-22 | Utility Trench (Backhoe) | LF | 2000 | Includes exavation, compaction, backfill and final grading. 8" wide, 36" deep trench, medium soil. | Demo - N/A | |||
| E018 | SECTIONALIZING SWITCH (Underground Linework) | Includes installation and mounting on concrete equipment pad. Does not include cable terminations. | ||||||
| E018-01 | Pad Mounted - Metal Enclosed Oil Filled 15KV - 95 KV BIL | |||||||
| (2-Switches - 2-VFI) | EA | 2 | 1 | |||||
| E018-02 | Pad Mounted - Metal Enclosed Air Switches 15 KV- 95 BIL | |||||||
| (2-Switches - 2-Fused) | EA | 2 | 1 | |||||
| E019 | JUNCTION ENCLOSURES (Underground Linework) | |||||||
| E019-01 | 4-Point Connection, 200A | EA | 6 | Includes installation and mounting on concrete equipment pad. Does not include cable terminations. | 1 | |||
| E019-02 | 4-Point Connection, 600A | EA | 12 | Includes installation and mounting on concrete equipment pad. Does not include cable terminations. | 1 | |||
| E019-03 | 3-Point Connection x 4, 200A | EA | 12 | Includes installation and mounting on concrete equipment pad. Does not include cable terminations. | 1 | |||
| E020 | MEDIUM VOLTAGE CABLE SPLICE (Underground Linework) | |||||||
| E020-01 | CABLE SPLICE #4 STRANDED | EA | 6 | 1 | ||||
| E020-02 | CABLE SPLICE #2 STRANDED | EA | 6 | 1 | ||||
| E020-03 | CABLE SPLICE #1/0 STRANDED | EA | 24 | 5 | ||||
| E021 | MEDIUM VOLTAGE CABLE ELBOWS (Underground Linework) | 15 kV voltage class meeting IEEE Standard 386. Up to 500 kcmil. | ||||||
| E021-01 | 600A Loadbreak Elbow | EA | 12 | 1 | ||||
| E021-01 | 200A Loadbreak Elbow | EA | 12 | 1 | ||||
| E022 | CABLE TERMINATION (Underground Linework) | |||||||
| E022-01 | CABLE TERMINATION #4 STRANDED | EA | 6 | 1 | ||||
| E022-02 | INSTALL CABLE TERMINATION #2 STRANDED | EA | 6 | 1 | ||||
| E022-03 | INSTALL CABLE TERMINATION #1/0 STRANDED | EA | 24 | 5 | ||||
| E023 | PAD MOUNTED TRANSFORMERS (1 PHASE) | 12470Y/7200V, 13,200Y/7620V, 13800Y/7920V |
Dead Front Taps: Split +/- 2-1/2% 65 Degrees C temperature rise Liquid Type: Mineral oil Connection: Loop Feed HV Bushings: Wells and Inserts LV Bushiings: Spade-6 hole Fusing: Bay-O-Net Arrester(s): Installed Primary voltage to 13,200V, secondary service voltages combinations 240V/120V, 480V/240V. Price includes installation on concrete pad.
Without Meters
| E023-01 | 25KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 1 | 1 | |
| E023-01 | 37.5KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 4 | 1 | |
| E023-01 | 50KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 20 | 4 | |
| E023-02 | 75KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 4 | 1 | |
| E023-03 | 100KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 2 | 1 | |
| E023-04 | 167KVA PAD MOUNTED TRANSFORMERS (1 PHASE) | EA | 1 | 1 | |
| E024 | PAD MOUNTED TRANSFORMERS (3 PHASE) | Primary: 12470Y/7200V, 13,200Y/7620V, 13800Y/7920V |
Secondary: 480Y/277, 208Y/120 BIL- 95kV Copper Windings Dead Front Taps: Split +/- 2-1/2% 65 Degrees C temperature rise Liquid Type: Mineral oil Connection: Loop Feed with ON-OFF Radial Switch HV Bushings: Wells and Inserts LV Bushiings: Spade-6 hole Fusing: Bay-O-Net with current limiting fusing with one spare set of fuses Arresters: Installed Price includes installation on concrete pad and secondary cable terminations. Does not include MV terminations.
| E024-01 | 75KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 4 | 1 | ||||
| E024-02 | 112.5KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 2 | 1 | ||||
| E024-03 | 150KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 2 | 1 | ||||
| E024-04 | 225KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 1 | 1 | ||||
| E024-05 | 300KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 1 | 1 | ||||
| E024-06 | 500KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 1 | 1 | ||||
| E024-06 | 750KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 1 | 1 | ||||
| E024-06 | 1000KVA PAD MOUNT TRANSFORMERS (3 PHASE) | EA | 1 | 1 | ||||
| E025 | REINFORCED CONCRETE TRANSFORMER PAD | Includes equipment mobilization, excavation, forms, rebar, 3000 psi concrete, smooth finish, form removal and disposal, finish grading, and installation of ground loop system IAW UFC 3-530-01. | ||||||
| E025-01 | 6’ x 6’ x 8” = 0.89CY Reinforced concrete transformer pad | EA | 15 | 3 | ||||
| E025-02 | 7’ x 7’ x 8” = 1.21CY Reinforced concrete transformer pad | EA | 15 | 3 | ||||
| E025-03 | 8’ x 8’ x 8” = 1.58CY Reinforced concrete transformer pad | EA | 15 | 3 | ||||
| E026 | MANHOLES | |||||||
| E026-01 | Manhole | EA | 2 | Manholes shall be compliant with AF ETL 10-17, Electrical Manhole Design. Includes excavation, installation, and final grading. | 1 | |||
| E027 | LOW VOLTAGE METERS | Includes hardware, brackets, installation, fabrication (if necessary), equipment modification, wiring, and all terminations. | ||||||
| E027-01 | LOW VOLT INSTR. METER INSTALLED ON EXISITNG POLE INCLUDES METER, SOCKET, CTs, CT MOUNTING BRACKET, INSTRUMENT WIRING AND MISC CONDUIT FITTINGS. | EA | 6 | 1 | ||||
| E027-02 | LOW VOLT INSTR. METER INSTALLED ON PADMOUNT INCLUDES METER, SOCKET, CTs, INSTRUMENT WIRING AND MISC CONDUIT FITTINGS. | EA | 6 | 1 | ||||
| E027-03 | LOW VOLT SELF CONT. MTR. UP TO 200 AMP INCLUDES 2" CONDUIT RISER & 3/0 CONDUCTORS, METERBASE, MISC CONDUIT FITTINGS, 10' 2" RIGID STEEL, BUSHINGS 2 PER STRAP & STRUT, AND WEATHER HEAD. (GOVT. OWNED) | EA | 6 | 1 | ||||
| E027-04 | 15KV. PRIMARY METER ON EXISTING POLE INCLUDES SOCKET, METER, WIRING, CTs, PTs AND MOUNTING BRACKET ON CROSSARMS. | EA | 4 | 1 | ||||
| E027-05 | TRANSFER TYPE "A" METER (GOVT. OWNED) | EA | 6 | 1 | ||||
| E027-06 | TRANSFER TYPE "B" METER (GOVT. OWNED) | EA | 4 | 1 | ||||
| E027-07 | TRANSFER TYPE "C" METER (GOVT. OWNED) | EA | 4 | 1 | ||||
| E026-08 | TRANSFER TYPE "D" METER (GOVT. OWNED) | EA | 2 | 1 | ||||
| E028 | CABLE TESTING | Includes all equipment, personnel, and means to conduct high voltage DC tests on medium voltage cable. Price is per cable between termination points. | ||||||
| E028-01 | High Voltage DC | EA | 40 | Demo - N/A | ||||
| E029 | ELECTRICAL PANELS | |||||||
| E029-01 | Load Center, NEMA 3R, 120/240 volt, 100 ampere main breaker, single phase, 3 wire, service entrance rated, 12 pole, breakers not included. | EA | 18 | 4 | ||||
| E029-02 | Load Center, NEMA 3R, 120/240 volt, 200 ampere main breaker, single phase, 3 wire, service entrance rated, 40 pole, breakers not included. | EA | 4 | 1 | ||||
| E0289-03 | Panelboard, 120/208 volt, 100 ampere main breaker, three phase, 4 wire, service entrance rated, 24 pole, breakers not included. | EA | 4 | 1 | ||||
| E029-04 | Panelboard, 120/208 volt, 225 ampere main breaker, three phase, 4 wire, service entrance rated, 42 pole, breakers not included. | EA | 2 | 1 | ||||
| E030 | WIRE | 600V, Stranded Type THHN, XHHW, or THWN Copper | ||||||
| E030-01 | #12 | CLF | 10 | 2 | ||||
| E030-02 | #10 | CLF | 10 | 2 | ||||
| E030-03 | #8 | CLF | 10 | 2 | ||||
| E030-04 | #6 | CLF | 10 | 2 | ||||
| E030-05 | #4 | CLF | 10 | 2 | ||||
| E050-06 | #2 | CLF | 8 | 2 | ||||
| E030-07 | #1 | CLF | 8 | 2 | ||||
| E030-08 | #1/0 | CLF | 4 | 1 | ||||
| E030-09 | #2/0 | CLF | 4 | 1 | ||||
| E030-10 | #3/0 | CLF | 4 | 1 | ||||
| E030-11 | #4/0 | CLF | 4 | 1 | ||||
| E030-12 | 250 kcmil | CLF | 4 | 1 | ||||
| E030-13 | 350 kcmil | CLF | 4 | 1 | ||||
| E030-14 | #500 kcmil | CLF | 4 | 1 | ||||
| E031 | CONDUIT, RIGID GALVANIZED STEEL (including couplings) | |||||||
| E031-01 | 1/2" conduit | LF | 1000 | 200 | ||||
| E031-02 | 3/4" conduit | LF | 1000 | 200 | ||||
| E031-03 | 1" conduit | LF | 1000 | 200 | ||||
| E031-04 | 1-1/4" conduit | LF | 1000 | 200 | ||||
| E031-05 | 1-1/2" conduit | LF | 1000 | 200 | ||||
| E031-06 | 2"conduit | LF | 1000 | 200 | ||||
| E031-07 | 2-1/2" conduit | LF | 1000 | 200 | ||||
| E032 | PVC Conduit - Schedule 40 | |||||||
| E032-1 | 1" Diameter | LF | 1000 | 200 | ||||
| E032-2 | 2" Diameter | LF | 1000 | 200 | ||||
| E032-3 | 3" Diameter | LF | 1000 | 200 | ||||
| E032-4 | 4" Diameter | LF | 1000 | 200 | ||||
| E032-5 | 5" Diameter | LF | 1000 | 200 | ||||
| E032-6 | 6" Diameter | LF | 1000 | 200 | ||||
| E033 | RISER CONDUIT | Includes couplings, rubber conduit seal, strapping to pole or structure, and conduit elbows | ||||||
| E033-01 | RISER CONDUIT (UP TO 4" PVC) | LF | 500 | 100 | ||||
| E033-02 | RISER CONDUIT (UP TO 4" GALV. STEEL) | LF | 200 | 40 | ||||
| E034 | BURIED CABLE TAPE | |||||||
| E034-01 | Install Buried Cable Tape | CLF | 2000 | Demo - N/A | ||||
| E035 | BORING UNDER PAVEMENT | |||||||
| E035-01 | Bore Under Pavement | LF | 1000 | 12" diameter maximum bore, medium soil. Includes mobilization, setup, cleanup, and excavation. Does not include conduit. | Demo - N/A | |||
| E036 | PHOTOCELL | |||||||
| E036-01 | Replace Photocell | EA | 200 | Demo - N/A | ||||
| E037 | RELAMP FLOODLIGHT/STREETLIGHT | |||||||
| E037-01 | 250 WATT | EA | 200 | 40 | ||||
| E037-02 | 400 WATT | EA | 50 | 10 | ||||
| E037-03 | 1000 WATT | EA | 50 | 10 | ||||
| E038 | FLOOD LIGHT FIXTURES (Includes lamp and photocell) | Includes installation, hardware, and connection of fixture wiring power. | ||||||
| E038-01 | 250 WATT (High Pressure Sodium) | EA | 10 | 2 | ||||
| E038-02 | 400 WATT (High Pressure Sodium) | EA | 20 | 4 | ||||
| E038-03 | 1000 WATT (High Pressure Sodium) | EA | 10 | 2 | ||||
| E039 | STREETLIGHT FIXTURE (Includes lamp and photocell) | |||||||
| E039-01 | 175 WATT | EA | 10 | 2 | ||||
| E039-02 | 250 WATT | EA | 10 | 2 | ||||
| E039-03 | 400 WATT | EA | 20 | 4 | ||||
| E040 | UNDERGROUND STREETLIGHT CABLE (DIRECT BURIED) | |||||||
| E040-01 | #12 COPPER THWN/THHN OR UF | LF | 1000 | Demo - N/A | ||||
| E040-02 | #10 COPPER THWN/THHN OR UF | LF | 1000 | Demo - N/A | ||||
| E040-03 | #8 COPPER THWN/THHN OR UF | LF | 1000 | Demo - N/A | ||||
| E040-04 | #6 COPPER THWN/THHN OR UF | LF | 1000 | Demo - N/A | ||||
| E041 | LIGHTNING PROTECTION SYSTEMS | Material and installation shall be IAW UFGS-26 41 01.00 10. | ||||||
| E041-01 | 75' Telescoping Masts | EA | 10 | Includes concrete base and grounding system. | 2 | |||
| E041-02 | #2/0 Bare Copper Overhead Conductor (Shield Wires) | LF | 1000 | 200 | ||||
| E041-03 | #2/0 Stranded Copper Down Conductor | LF | 100 | 20 | ||||
| E041-04 | Overhead Conductor Connection Hardware | EA | 100 | Includes all hardware for connecting one overhad wire to mast, e.g. bolts, nuts, washers, anchor rod clamp, clamps, pole bands, connectors, and jumpers. | 20 | |||
| E041-05 | Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 12" threaded without Support Brackets | EA | 25 | To 75' high. Includes base and attachment to facility. | 5 | |||
| E041-06 | Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 24" threaded with Support Brackets | EA | 20 | 4 | ||||
| E041-07 | Air Terminals - 1/2", Copper, Rounded Tip (not pointed), 36" threaded with Support Brackets | EA | 100 | 20 | ||||
| E041-08 | Grounding Access Well - 12" diameter, 18" long, Schedule 80 PVC, galvanized steel lid. | EA | 20 | 4 | ||||
| E041-09 | Mounting Base for 5/8" Air Terminals. Vertical, horizontal, ridge,or sloping roof mounting configuration. Adhesive or bolted. | EA | 100 | 20 | ||||
| E041-10 | Bonds to metallic structures | EA | 100 | Includes hardware and copper bonding straps 3/4" x 9.5" | 20 | |||
| E041-11 | Ground rods - 3/4" x 10' Copper Clad | EA | 25 | 5 | ||||
| E041-12 | Copper Bonding Conductors, tinned, braided ribbon type with connection lugs-#6 Copper solid - 12" | EA | 25 | 5 | ||||
| E041-13 | Copper Bonding Conductors, tinned, braided ribbon type with | |||||||
| connection lugs-#6 Copper solid - 18" | EA | 25 | 5 | |||||
| E041-14 | Copper Bonding Conductors, tinned, braided ribbon type with | |||||||
| connection lugs-#6 Copper solid - 24" | EA | 25 | 5 | |||||
| E041-15 | Exothermic Connections (to #2/0) | EA | 50 | 10 | ||||
| E041-16 | High Compression Connectors (Copper) | EA | 100 | 20 | ||||
| E041-17 | Conductor anchors/supports | EA | 100 | 20 | ||||
| E041-18 | Connector- cable to bar (Copper) | EA | 100 | 20 | ||||
| E041-19 | Grounding Conductors (#2/0 Copper) | LF | 1000 | 200 | ||||
| E041-20 | Electrical panel surge arrestors | EA | 10 | 2 | ||||
| E042 | MISCELLANEOUS MINOR MATERIALS | |||||||
| E042-1 | Lump sum $100 | EA | 30 | Demo - N/A | ||||
| E042-2 | Lump sum $200 | EA | 30 | Demo - N/A | ||||
| E042-3 | Lump sum $300 | EA | 30 | Demo - N/A | ||||
| E043 | LABOR HOURS | |||||||
| E043-01 | Superintendent - Regular Hours | HOUR | 75 | Demo - N/A | ||||
| E043-02 | Superintendent - Overtime Hours | HOUR | 25 | Demo - N/A | ||||
| E043-03 | Superintendent - Emergency Response | HOUR | 75 | Demo - N/A | ||||
| E043-10 | Foreman - Regular Hours | HOUR | 75 | Demo - N/A | ||||
| E043-11 | Foreman - Overtime Hours | HOUR | 25 | Demo - N/A | ||||
| E043-12 | Foreman - Emergency Response | HOUR | 150 | Demo - N/A | ||||
| E043-20 | Electrician/Lineman - Regular Hours | HOUR | 75 | Demo - N/A | ||||
| E043-21 | Electrician/Lineman - Overtime Hours | HOUR | 25 | Demo - N/A | ||||
| E043-22 | Electrician/Lineman - Emergency Response | HOUR | 150 | Demo - N/A | ||||
| E043-30 | Apprentice - Regular Hours | HOUR | 75 | Demo - N/A | ||||
| E043-31 | Apprentice - Overtime Hours | HOUR | 25 | Demo - N/A | ||||
| E043-32 | Apprentice - Emergency Response | HOUR | 75 | Demo - N/A | ||||
| E043-40 | Laborer - Regular Hours | HOUR | 75 | Demo - N/A | ||||
| E043-41 | Laborer - Overtime Hours | HOUR | 75 | Demo - N/A | ||||
| E043-42 | Laborer - Emergency Response | HOUR | 75 | Demo - N/A | ||||
| E043-50 | Professional Registered Testing Engineer | HOUR | 800 | Demo - N/A | ||||
| E044 | Equipment | |||||||
| E044-01 | BUCKET TRUCK - EMERGENCY RESPONSE EQUPMENT | HOUR | 150 | Demo - N/A | ||||
| E044-02 | BUCKET TRUCK - REGULAR HOURS | HOUR | 75 | Demo - N/A | ||||
| E044-03 | LINE TRUCK (DIGGER) - EMERGENCY RESPONSE | HOUR | 150 | Demo - N/A | ||||
| E044-04 | LINE TRUCK (DIGGER) - REGULAR HOURS | HOUR | 75 | Demo - N/A | ||||
| E044-05 | TRENCHER - REGULAR OR EMERGENCY RESPONSE | HOUR | 40 | Demo - N/A | ||||
| E044-06 | HI-POT-UNIT - REGULAR OR EMERGENCY RESPONSE | HOUR | 40 | Demo - N/A | ||||
| E045 | TREE TRIMMING | |||||||
| E045 | Tree Trimming labor & equipment | HOUR | 300 | Demo - N/A | ||||
| E046 | ASPHALT REMOVAL & REPLACEMENT | |||||||
| E046 | Asphalt Cutting Removal & Replacement | SQ FT | 200 | Demo - N/A | ||||
| E047 | CONCRETE REMOVAL & REPLACEMENT | |||||||
| E047 | Concrete Cutting Removal & Replacement | SQ FT | 100 | Demo - N/A | ||||
| E048 | CONCRETE DRILLING | Drilling of reinforced concrete slab up to 6" thick, includes bit, layout and setup, and cleanup. | ||||||
| E048-01 | 1" Diameter Core | EA | 6 | Demo - N/A | ||||
| E048-01-01 | Each added inch thickness in same hole, add | EA | 2 | Demo - N/A | ||||
| E048-02 | 2" Diameter Core | EA | 6 | Demo - N/A | ||||
| E048-02-10 | Each added inch thickness in same hole, add | EA | 2 | Demo - N/A | ||||
| E048-03 | 3" Diameter Core | EA | 6 | Demo - N/A | ||||
| E048-03-01 | Each added inch thickness in same hole, add | EA | 2 | Demo - N/A | ||||
| E048-04 | 4" Diameter Core | EA | 6 | Demo - N/A | ||||
| E048-04-01 | Each added inch thickness in same hole, add | EA | 2 | Demo - N/A | ||||
| E048-05 | 5" Diameter Core | EA | 6 | Demo - N/A | ||||
| E048-05-01 | Each added inch thickness in same hole, add | EA | 2 | Demo - N/A | ||||
| E049 | PENTRATION FIRESTOPPING (MANHOLE) | Non-metallic piping. | ||||||
| E049-01 | 4" Conduit | EA | 2 | Demo - N/A | ||||
| E049-02 | 5" Conduit | EA | 2 | Demo - N/A | ||||
| E050 | CONFINED SPACE ENTRY SUPPORT SERVICES | |||||||
| E050-01 | Installation and Maintenance of Ventalation System (per manhole) | EA | 4 | Includes ventilation setup and compliance with UFC 3-560-01, Electrical Safety O&M. | Demo - N/A | |||
| E051 | BONDS | |||||||
| E051-01 | Performance Bond (Rate per Thousand) | Unit | 1 | Demo - N/A | ||||
| E051-02 | Payment Bond (Rate Per Thousand) | Unit | 1 | Demo - N/A | ||||
| SubTotals | SubTotals | |||||||
| Total | ||||||||
| Escalation Rate | ||||||||
| Rate | Option Total with Escalation Rate | |||||||
| Option Year 1 | ||||||||
| Option Year 2 | ||||||||
| Option Year 3 | ||||||||
| Option Year 4 |
&12FA4418-13-R-0012
Section J, Attachment 2
| 17 June 2013 | &14Repair and Maintain Electrical Distribution System IDIQ |
| Price Schedule | &12 Page &P of &N |
File details come from the government source that posted it. Updated .