5. Quote Schedule - Wastewater testing and analysis.pdf
PDF 151 KB Posted
- Attached to
- Waste Water Testing Services Federal contract opportunity
- Solicitation number
- FA441723QA012
About this file
This document is a quote schedule for wastewater testing and analysis services required by the Department of the Air Force Special Operations Command under solicitation number FA441723QA012. The schedule lists various wastewater, groundwater, wetland, sludge, and digester tests to be performed on a regular basis over a four year period, along with unit costs. Tests include BOD, TSS, nutrients, bacteria, metals, and field parameters. Additional testing includes annual thermometer checks and biennial Cryptosporidium/Giardia sampling. The contractor will also conduct quarterly and annual sampling at various monitoring wells and wetland stations. Pricing is provided for the base year and four option years. Additional testing will be charged under regular unit prices up to an annual not-to-exceed amount of $4,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA441723QA012_Questions.pdf | ||
| 2. WD 2015-4531 rev 24.pdf | ||
| FA441723QA012 Combo Wastewater testing.pdf | ||
| 1. SOW Testing and Analysis Contract 1 May 2023.pdf | ||
| 3. Addendum to FAR 52.212-1 - Instructions to Offerors—Commercial Services .pdf | ||
| 4. Addendum to FAR 52.212-2 – Evaluation—Commercial Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASTEWATER TESTING AND ANALYSIS QUOTE SCHEDULE
NOTE: ALL ANALYSIS SHALL BE PERFORMED USING APPROVED EPA OR STANDARD METHODS FOR WATER AND WASTEWATER
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost mg/L
#/100mL
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost mg/L mg/L mg/L mg/L mg/L mg/L
Note: Sampling days will typically be Mon., Tues., Wed., and Fri. Samples picked up from the HFAWWTF (Building
91500) between the hours of 0800-1200.
Note: Samples shall be picked up from the HFAWWTF (Building 91500) on Tuesday between the hours of 0800-1200 Weekly Effluent Analysis (COMPOSITE sample)
Daily Reclaimed Water Analysis (GRAB sample)
Nitrogen, Kjeldahl, Total (as
N)
1 each (52 times/ year
1 each (52 times/ year
1 each (52 times/ year
1 each (52 times/ yearNitrogen, Ammonia (as N)
TOTAL
TOTAL
Parameter # Of Samples
BOD, Carbonaceous 5 Day, o C
1 each (52 times/ year
Solids, Total Suspended 1 each (52 times/ year
Parameter
4 sample per week
(208 per year)
4 sample per week
(208 per year)
# Of Samples
Coliform, Fecal
Solids, Total Suspended
Nitrate/Nitrite Nitrogen
Phosphorus, Total (as P)
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost mg/L mg/L
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost umhos/ cm
Note: Sample shall be picked up with Weeky Sample during month collected at HFAWWTF
Building 91500) between hours of 0800-1200
Note: Samples shall be picked up from the HFAWWTF (Building 91500) onTuesday between the hours of 0800-1200 Weekly Influent Analysis (COMPOSITE sample)
TOTAL
Quarterly Effluent Analysis (Sample March, June, September, and
December) (GRAB sample)
Parameter # Of Samples
TOTAL
Specific Conductance 1 each (4 times/ year)
Parameter # Of Samples
BOD, Carbonaceous 5 Day, o C
1 each (52 times/ year
Solids, Total Suspended 1 each (52 times/ year
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost feet mg/L mg/L
#/100 mL s.u.
NTU
MWB-1, MWC-3, MWC-5, MWI-6, MWI-12, MWC-13
Contractor shall perform field sampling and field analysis (pH, turbidity) in accordance with FDEP Standard Operating Procedures.
Purge log shall be provided with sample results (DEP-SOP-001/01 Form 9000-24).
Note: Sampling and Field Analysis date shall be coordinated between contractor and a representative of HFAWWTF
TOTAL
Coliform, Fecal 6 each (1 time/ year) pH (in Situ) 6 each (1 time/ year)
Turbidity 6 each (1 time/ year)
Water Level Relative to
NGVD (In Situ) 6 each (1 time/ year)
Nitrogen/ Nitrate, Total (as
N) 6 each (1 time/ year)
Solids, Total (TDS) 6 each (1 time/ year)
Annual Groundwater Monitoring Well Analysis
(Sample November)
Parameter # Of Samples
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost mg/L ug/L
#/100 mL mg/L mg/L mg/L mg/L mg/L mg/L umhos/ cm mg/L mg/kg
WIM-02 (Station 3), WEP-01 (Station 4), WIM-03 (Station 5)
Note: Sampling pick up date shall be coordinated between contractor and a representative of HFAWWTF
TOTAL
Specific Conductance 3 each (1 time/ year)
Sulfate , Total 3 each (1 time/ year)
3 each (1 time/ year)Sulfide (as S) - Sediment
Nitrite plus Nitrate, Total 1 det. (as N) 3 each (1 time/ year)
Phosphorus, Total (as P) 3 each (1 time/ year)
Solids, Total Suspended
(TSS)
3 each (1 time/ year)
Ammonia, Nitrogen (as N) 3 each (1 time/ year)
Unionized Ammonia, Total
(as N) WEP-01 only 1 each (1 time/ year)
Nitrogen, Kjeldahl, Total (as
N) 3 each (1 time/ year)
BOD, Carbonaceous 5 Day, C
3 each (1 time/ year)
Chlorophyll-a, Phytoplankton,Flurometric
Method
3 each (1 time/ year)
Coliform, Fecal 3 each (1 time/ year)
Annual Wetland Analysis (Sample May or June)
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost percent percent percent mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg s.u.
percent
Note: Sampling pick up date shall be coordinated between contractor and a representative of HFAWWTF
TOTAL
Solids, Total, Sludge, Percent 1 each (1 time/ year)
Zinc, Dry Weight, Sludge 1 each (1 time/ year) pH 1 each (1 time/ year)
Mercury, Dry Weight, Sludge 1 each (1 time/ year)
Molybdeum, Dry Weight, Sludge 1 each (1 time/ year)
Nickel, Dry Weight, Sludge 1 each (1 time/ year)
Selenium, Sludge Solid 1 each (1 time/ year)
Cadmium, Sludge, Total Dry
Weight (as Cd) 1 each (1 time/ year)
Copper, Sludge, Total Dry
Weight (as Cu) 1 each (1 time/ year)
Lead, Dry Weight, Sludge 1 each (1 time/ year)
Phosphorus, Sludge, Total
Dry Weight (as P) 1 each (1 time/ year)
Potassium, Sludge, Total
Dry Weight (as K) 1 each (1 time/ year)
Arsenic, Total Dry Weight, Sludge 1 each (1 time/ year)
Annual Digester Sludge Analysis (Sample in January)
Parameter # Of Samples
Nitrogen, Sludge, Total Dry
Weight (as N) 1 each (1 time/ year)
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost
MPN/g
Note: Sampling pick up date shall be coordinated between contractor and a representative of HFAWWTF
TOTAL
Coliform, Fecal 7 each (1 time/ year)
Annual Residual (Sludge) Coliform, Fecal (Sample beginning in January)
Additional Testing: Additional testing and analysis shall be required under this contract. CLIN 0002. Cost per test and analysis shall be charged under regular testing prices. Under this CLIN 0002, annual thermometer accuracy check and every two year cycle (2024, 2026, 2028)
Cryptosporidium/ Giardia sampling
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost degree refrence
Units
Cost Per
Test
Base
Year
Total
Cost
Base
Year
Cost Per
Test
Option
Year 1
Total
Cost
Option
Year 1
Cost Per
Test
Option
Year 2
Total
Cost
Option
Year 2
Cost Per
Test
Option
Year 3
Total
Cost
Option
Year 3
Cost Per
Test
Option
Year 4
Total
Cost
Option
Year 4
Total Cost oocysts/1
00L X X X X cysts/
100L X X X X
Note: Resampling maybe required if Cryptosporidium/ Giardia exceed limits. Price shall remain consistent with first sample.
Cryptosporidium/Giardia sampling conducted by WWTP personnel shall only be utilized in the collecting sample for delivery to lab.
WWTP personnel will not install, set-up, and/or maintain equipment for the collection of sampling of Crptosporidium/ Giardia, the lab may do so, with their contracted personnel and equipment, at no additional cost, than quoted in the schedule .
TOTAL
Parameter # Of Samples
Cryptosporidium 1 each (1 time/ every two years)
Giardia 1 each (1 time/ every two years)
TOTAL
Cryptosporidium/ Giardia (Sampling in August) Note: Sampling pick up date shall be coordinated between contractor and a representative of HFAWWTF
Annual Thermometer Accuracy Check with NIST
Thermometer (December)
Parameter # Of Samples
Thermometer 3 each (1 time/ year)
Note: Sampling pick up date shall be coordinated between contractor and a representative of HFAWWTF
CLIN 0001 CLIN 0002 (Automatic NTE $4,000.00) Total Cost
Base Year Cost $0.00 $4,000.00
Option Year 1 Cost $0.00 $4,000.00
Total $ for Contract
Option Year 2 Cost $0.00 $4,000.00
Option Year 3 Cost $0.00 $4,000.00
Option Year 4 Cost $0.00 $4,000.00
File details come from the government source that posted it. Updated .