Amendment 2 - Attachment 4 - Instructions - updated 1 June.pdf

PDF 414 KB Posted

Attached to
Advanced Driving Class Expendable Vehicles (ADCETV) Federal contract opportunity
Solicitation number
FA441721Q0014
Issued by
Department of the Air Force Special Operations Command

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA441721Q0014

ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS (JUN

2020)

FAR 52.212-1 Instructions to Offerors is tailored as follows:

FAR 52.212-1(a): "The quoter agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes."

FAR 52.212-1(f)(2)(i): “Any quotes or revisions received after the exact time specified in this

RFQ for receipt of quotes is considered late and may or may not be considered for award. The

Government maintains unilateral discretion when considering late quotes.”

“Offer”, “offeror”, and “proposal” are replaced with “quotation”, “quoter”, and “quote.”

ADDENDUM TO 52.212-1 QUOTE PREPARATION INSTRUCTIONS

General Instructions

A. To assure timely and equitable evaluation of the quote, the quoter must follow the instructions contained herein. Quoters are required to meet all solicitation requirements, including 1. Terms and conditions; 2. Representations and certifications.

Failure to meet a requirement may result in a quote being ineligible for award.

Quoters must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

B. The quote shall consist of three (3) separate parts: Part I - Price, Part II - Past Performance, and

Part III - Technical

C. Complete the necessary fill-ins and certifications in provisions and in the on-line Representations and

Certifications at www.sam.gov. For information contained in SAM, quoters may elect to reference this information instead of submitting copies of the provisions and clauses with their quote. All other clauses and provisions not contained in SAM must be submitted with the quote.

D. A site visit will not be scheduled.

E. Points of Contact: All communications shall be submitted via e-mail to all the following personnel/addresses:

Nick Rogers at robert.rogers.70@us.af.mil, Mike Carnley at charles.carnley.@us.af.mil

F. Questions must be submitted via email to the personnel noted above. All questions are due no later than 3:00 PM CDT, by 11 June 2021. All questions and answers will be posted to beta.SAM.

G. Quote Submission Instructions: Quotes must be submitted electronically via email. All documents submitted must be saved in .pdf format and shall follow the instructions in FAR 52.212-1. Quoters must use the following subject line in their response email: “FA441721Q0014 – ADCETV – [company name]

– 1 of [total number of emails sent]”. Respondents are encouraged to use read receipts. If you do not receive confirmation of receipt within 24 hours contact the points of contact identified in this RFQ.

The due time and date for quotes is 1:00 PM CDT on 23 June 2021. Quotes that are received after this date and time are considered late. The Government reserves the right to accept or reject late quotes.

Quotes shall be on 8.5” X 11” page. A page is defined as one face of a sheet of paper containing information. The text size shall be no less than 12 pitch. Quotes shall use at least 1 inch margins on the top and bottom and 1 inch side margins.

Copies and Page Limits. Evaluators will only read up to the maximum number of pages specified. If the page limit is exceeded, the excess pages will not be evaluated.

H. Specific Instructions

Teaming Arrangements/Joint Venture Documentation (included in Part I of quote): Failure to submit this documentation, if quoter is claiming this is their business approach, will render the quoters' quote non-responsive and no further evaluation of the quoter's quote will be conducted.

Teaming Arrangement/Joint Venture Documentation (If Applicable). If Teaming Arrangements are contemplated they must comply with the appropriate Federal Regulations (13 C.F.R. Part 121 (Size

Regulations), Part 124 8(a) & SDB) and Part 125 (Government Contracting Programs)).

The Joint Venture Arrangement must be received by SBA prior to quote due date and approved before award of any resulting contract. If you are contemplating a joint venture on this project, you must advise your assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the arrangement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the quote due date. No changes or corrections can be made after quote due date other than minor non-material changes made by the SBA.

Teaming Arrangements as a Prime and Subcontractor relationship (if applicable): Quoters must provide the following information not later than the date and time quotes are due:

1. Include size of each concern required at 13 CFR 121.103(h) (I) (2) (ii) and 124.513(b) (1);

2. Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, quotes, work management, etc.);

3. Subcontractor past performance cannot be disclosed to the prime quoter without the subcontractor's consent. Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation;

4. Identify each member's share of the prospective contract, 50/50, 51/49, etc.

5. Include exclusivity that the team member will not be replaced for the duration of the contract, any exceptions should be identified and assurance that the team members are not teaming with another firm for the same procurement;

6. Include a statement of acknowledgement that the prime contractor shall remain fully responsible for contract performance, regardless of any teaming arrangements between the prime contractor and its subcontractors.

Joint Ventures (if applicable): Quoters must provide the following information not later than the date and time quotes are due:

1. Include all requirements at 13 C.F.R. Part 124.513, including size concern information;

2. Include a statement confirming that at least 50% of the cost of contract performance incurred for personnel shall be expended for employees of the concern IAW FAR 52.219-14(c)(1); and

3. Joint Venture registration in SAM, identifying the Joint Venture as a small business concern under

NAICS code 562111 in their representations and certifications. No corrections and/or changes in proposed teaming arrangement or joint ventures will be accepted after the solicitation closing date and time.

Part I - Price Submission

1. Complete blocks 12, 17a, and 30a, b, and c of the Standard Form (SF) 1449. In doing so, the quoter accedes to the contract terms and conditions as written in the solicitation, with attachments. The solicitation constitutes the model contract.

2. Insert proposed unit and extended prices in the Pricing Schedule (page 3 and 4 of SF1449 Solicitation) for all Line Items. The extended amount must equal the whole dollar unit price multiplied by the number of units. The quote(s) must be submitted for a Line items in the base period and all four (4) Option Years.

3. Complete the necessary fill-ins and certifications in the Contract Clauses section. If the quoter has completed all representations and certifications contained in this solicitation in their SAM registration, the quoter shall state so.

4. Include Teaming Arrangement/Joint Venture (if applicable).

Part II - Past Performance Submission

1. Limited to no more than two (2) pages per contract listed and ten pages total. Pages exceeding the page limitations set forth in this section will not be read or evaluated, and will be removed from the quote. Past

Performance Questionnaire (PPQ) at attachment 3, CPARS ratings and accompanying CPARS information does not count towards the page limit. Only references for contracts that are recent and relevant will be considered. For a contract to be determined relevant, the work must have been for the concurrent provision and sustainment of a fleet of at least 15 vehicles on a regular basis for a period of at least six months.

Recent is defined as work within the last three years from the issue month of this solicitation.

Submit past performance information for no more than five recent and relevant contracts performed for

Federal agencies or commercial customers as a prime contractor that demonstrates the ability to successfully perform the scope and breadth of the requirements as described in the PWS for this solicitation. Past performance submission must also incorporate quality and satisfaction ratings for all contracts submitted. Negative remarks should include accompanying rationale explaining any corrective actions that were taken for substandard performance. The past performance submission must contain the following information:

(a) Company/Division name

(b) Product/Service

(c) Contracting Agency/Customer

(d) Contract Number

(e) Contract Dollar Value

(f) Period of Performance

(g) Verified, up-to-date name, address, e-mail address, FAX and telephone number of the contracting officer or customer POC responsible for procuring your services

(h) Comments regarding compliance with contract terms and conditions

(i) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions,

(k) Details as to what the predecessor companies, key personnel, or subcontractors participation was in the example past performance being provided.

(l) Explanation of how the scope of the referenced contract is similar to the PWS in this solicitation including the amount of municipal solid waste serviced annually.

(m) Associated CPARS ratings and accompanying CPAR information (does not count toward page limitation)

If no CPARS information is available for any of the submitted past performance, the quoter shall ensure that the references submitted with the quote are provided the PPQ (Attachment 3). It is strongly recommended that all quoters request their references to submit PPQ immediately via email to Nick

Rogers at robert.rogers.70@us.af.mil and Mike Carnley at charles.carnley@us.af.mil, as to be received to us no later than the date and time quotes are due.

If a teaming arrangement/Joint Venture is contemplated, provide complete information as to the arrangement, including up to five (5) recent and relevant past/present performance information on previous arrangements with same partner or as this entity (CAGE). If this is a first time joint effort, each party to the arrangement must submit separate past performance information. Subcontractor past performance may only be disclosed for use by the prime contractor if a letter of consent to release past performance information to the prime is completed by the subcontractor and included with the past performance.

If the quoter claims there is no past performance, then that status must be identified to the contracting officer no later than the date and time proposals are due from all the quoters.

Part III – Technical Submission

Subfactor 1 – Logistics Plan

Quoters shall submit a logistics plan no longer than three pages that details how the quoter will provide the required training vehicles for each training event. The plan must provide a sound understanding and demonstration of meeting the requirements of the PWS in regards to the following elements:

How training vehicles and up-armored vehicle will be provided and disposed of in an efficient manner

How the quoter intends to ensure a sufficient number of operational vehicles (including up-armored vehicle) are available for use. This includes returning and replacing vehicles that become non-operational during training and daily support/maintenance of vehicles.

How up-armored vehicles, IAW PWS 1.4.1.7, will be provided and disposed of in an efficient manner and how the quoter intends to ensure a sufficient number of up-armored vehicles are available for use.

*The following subfactor is only applicable to businesses who are considered other than small in the applicable NAICS category*

Subfactor 2 – Subcontracting Plan

Quoters who do not meet the small business size standard in the applicable NAICS must submit a small business subcontracting plan by the due date and time specified in this solicitation. The subcontracting plan must adhere to and contain all required information IAW FAR clause 52.219-9 Small Business

Subcontracting Plan. This clause does not apply to small business concerns.

(End of Addendum)

File details come from the government source that posted it. Updated .