Bid Schedule 14 August 2019 Solicitation # FA441719RA014
BID SCHEDULE
Revision 2
Repair, Clean, and Paint Water Tower 7 (Bldg 91134) and 808 (Bldg 90808)
CLIN DESCRIPTION Qty / Unit Unit Price TOTAL
AMOUNT
Water Tower 7 (Bldg. 91134) and 808 (Bldg. 90808):
Washout, disinfect, and two (2) negative BacT Tests.
All work shall be performed IAW the Statement of Work (SOW) dated 14 August 2019, Specifications FTEV 10-26976 dated 14 August 2019, and AWWA Standard D100 and D102.
2 Job
OPTION
Bid Option, Water Tower 7 (Bldg. 91134): Repairs. All work shall be performed IAW the Statement of Work (SOW) dated 14 August 2019, Specifications FTEV 10- 26976 dated 14 August 2019, and AWWA Standard D100 and D102.
1 Job
OPTION
Bid Option, Water Tower 7 (Bldg. 91134): Interior Paint. All work shall be performed IAW the Statement of Work (SOW) dated 14 August 2019, Specifications FTEV 10-26976 dated 14 August 2019, and AWWA Standard D100 and D102.
1 Job
OPTION
Bid Option, Water Tower 808 (Bldg. 90808): Interior Paint. All work shall be performed IAW the Statement of Work (SOW) dated 14 August 2019, Specifications FTEV 10-26976 dated 14 August 2019, and AWWA Standard D100 and D102.
1 Job
TOTAL