The file's text, extracted by GovTribe without its formatting.
FA4417-16-R-0008
Protective Coating IDIQ Questions & Answers Edition 2 8 July 16
| Question: |
| The SOW states that the well house doors are to be painted? Does this include both the interior and exterior of the doors? Or just the interior? |
| Answer: |
| Both interior and exterior |
| Question: |
| In regards to B90033, does the Government want to include painting the flashing/drip edge? |
| Question: |
| Please provide all available as-built drawings for the seven (7) buildings included in the seed project. |
| Answer: |
| As-built drawings are currently unavailable. |
| Question: |
| It was stated at the site visit on 6/16/16 that the Government would provide the dimensions to the contractors for them to base their proposals. Please provide these dimensions. |
| Answer: |
| As-built drawings are currently unavailable. It is the offerors responsibility for estimating properly, the difficulty and cost of successfully performing the work in accordance with the Seed Project’s Statement of Work. **The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. |
· The offerors project schedule will be evaluated relative to the overall coordination of the construction phase, to include ability to identify all required activities of the specific project, and the offerors ability to schedule the activities in a logical sequence and within the time required in this solicitation.
· The offerors proposal will be evaluated to ensure the practicable bid schedule shows all the necessary line items, quantity and all necessary items to complete the technical evaluation of the Seed Project Proposal, Painting of Multiple Facilities, identified under this solicitation.
| Question: |
| It was stated at the site visit on 6/16/16 that the Government would be responsible for moving furniture and items hung on walls from the work area prior to mobilization. Please confirm. |
| Answer: |
| Personnel within facility are responsible for removing all wall hangings and must move furniture at least 3 foot from wall. |
| Question: |
| In regards to B90029, the Government wishes to keep the decorative themed paint at the entrance to the "bat cave." Please confirm. |
| Question: |
| In regards to B90029 stairwell, does the Government wish to have the stair system leading to the top loft painted along with the handrails? |
| Answer |
| Yes, All handrails in stairwells are to be painted |
| Question: |
| Has an environment survey been completed on the areas to be painted? Do the paint areas contain any lead, asbestos, or other hazardous material? |
| Answer: |
| CEIE located in CE has past history on facilities located on Hurlburt Field |
| Question: |
| What type of paint does the Government want used on the exterior wall of Bldg. 90033 (i.e. Line Item 0001AA1, 0001AB1, 0001AK, etc.)? |
| Question: |
| Will Bldg. 90029 be occupied or unoccupied when painting starts? |
| Question: |
| Which line item does the Government want us to use for painting the metal doors/frames where the pre-finished natural doors are located? |
| Answer |
| Two metal door frames (only) equal one complete door |
| Question: |
| The following line items reference units that are not normally utilized for the relative task. Please clarify: |
| 0002AH – References LF, but is normally figured by the SF |
| 0003AA, 0003AB, 0003AC – References SF, but are normally figured by EA |
| 0004AA – No Unit Referenced, but is normally figured by EA |
| 0004AB – References EA, but is normally figured by the SF |
| 0004AC – References LF, but is normally figured by the SF |
| 0004AF – References SF, but is normally figured by the LF |
| 0004AJ – References SF, but is normally figured by the LF |
| 0004AK – References LF, but is normally figured by the SF |
| Answer: |
| These line items referenced should be changed to reflect correct units. See “Atch -1 REVISED Line Item List_Base Year and 4 Option Years” posted on FBO.gov. |
| Question: |
| Is QP1 required on this project? |
| Question: |
| Will you provide drawings or blue prints on buildings 90029 and 90033 to confirm square footage? |
| Answer: |
| As-built drawings are currently unavailable. |
| Question: |
| Does attachment 5 statement of work for painting multiple facilities require pricing of the 7 buildings listed considering the seed project is considered a technical item, if so where should that pricing go in the proposal? |
| Answer: |
| · Please refer to Solicitation Section L – Proposal Preparation Instructions: Section 2.0 through Paragraph(s) 2.1.1.3. |
· Please refer to Solicitation Section M – Evaluation Criteria For Award: Section 2.0 Evaluation Factors