FA4417-16-R-0008__Amendment_2.pdf
PDF 124 KB Posted
- Attached to
- Protective Coating, IDIQ
- Solicitation number
- FA4417-16-R-0008
About this file
FA4417-16-R-0008__Amendment 2
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2F3236027AW02 FTEV 16-1020
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to incorporate Revised Line Item List and update FAR Clause 52.216-18, Ordering.
- Deleting Attachment 1, Line Item Listing
- Incorporating Attachment 1a, REVISED Line Item List_Base Year and 4 Option Years
- Updating FAR Clause 52.216-18, Ordering
- Updating the period of performance on CLINs 0001, 1001, 2001, 3001, and 4001
*See summary of changes for complete details*
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4417-16-R-0008
X 9B. DATED (SEE ITEM 11)
06-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2016
CODE
1 SOCONS
350 TULLY ST.
HURLBURT FIELD FL 32544
FA4417 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4417-16-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
NOTE: The Line Item Cost shall come from Attachment 1, "Line Item List" Period of Performance: 22 Aug
2016 - 21 Aug 2017
To:
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
NOTE: The Line Item Cost shall come from Attachment 1, "REVISED Line Item List" Period of
Performance: 7 Sep 2016 - 6 Sep 2017.
CLIN 1001
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
NOTE: The Line Item Cost shall come from Attachment 1, "Line Item List" Period of Performance: 22 Aug
2017 - 21 Aug 2018
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
Performance: 7 Sep 2017 - 6 Sep 2018.
CLIN 2001
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 Mar 2016.
NOTE: The Line Item Cost shall come from Attachment 1, "Line Item List" Period of Performance: 22 Aug
2018 - 21 Aug 2019
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 Mar 2016.
Performance: 7 Sep 2018 - 6 Sep 2019.
CLIN 3001
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
NOTE: The Line Item Cost shall come from Attachment 1, "Line Item List" Period of Performance: 22 Aug
2019 - 21 Aug 2020
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications dated 10 March
2016.
Performance: 7 Sep 2019 - 6 Sep 2020.
CLIN 4001
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications and drawings 10
March 2016.
NOTE: The Line Item Cost shall come from Attachment 1, "Line Item List" Period of Performance: 22 Aug
2020 - 21 Aug 2021
The contractor shall furnish all labor, materials, tools, supervision and equipment to perform operations associated with work that consists of, but not limited to, interior and exterior painting of facilities, as well as pavement striping on roadways and the airfield at Hurlburt Field, FL in accordance with the attached specifications and drawings 10
March 2016.
NOTE: The Line Item Cost shall come from Attachment 1, "REVISED Line Item List" Period of
Performance: 7 Sep 2020 - 6 Sep 2021.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
POP 22-AUG-2016 TO
21-AUG-2017
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
FOB: Destination
F2F323
POP 07-SEP-2016 TO
06-SEP-2017
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
The following Delivery Schedule item for CLIN 1001 has been changed from:
POP 22-AUG-2017 TO
21-AUG-2018
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
POP 07-SEP-2017 TO
06-SEP-2018
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
The following Delivery Schedule item for CLIN 2001 has been changed from:
POP 22-AUG-2018 TO
21-AUG-2019
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
POP 07-SEP-2018 TO
06-SEP-2019
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
The following Delivery Schedule item for CLIN 3001 has been changed from:
POP 22-AUG-2019 TO
21-AUG-2020
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
POP 07-SEP-2019 TO
06-SEP-2020
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
The following Delivery Schedule item for CLIN 4001 has been changed from:
POP 22-AUG-2020 TO
21-AUG-2021
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
POP 07-SEP-2020 TO
06-SEP-2021
N/A 1SOCES
JOHN FOSTER
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
884-7711
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from
7 Sep 2016 to 6 Sep 2017_Base Year
7 Sep 2017 to 6 Sep 2018_Option Year One
7 Sep 2018 to 6 Sep 2019_Option Year Two
7 Sep 2019 to 6 Sep 2020_Option Year Three
7 Sep 2020 to 6 Sep 2021_Option Year Four
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the
Schedule.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
ATTACHMENT TITLE DATE NO. OF PAGES
1. Contract Line Item Listing Undated 15
1a. REVISED Line Item List Undated 15
2. Specifications (Protective Coating IDIQ) 10 March 2016 95
3. Schedule of Wage Rates (Dec. No. FL160029) 8 January 2016 6
4. Financial Institution Reference Sheet Undated 1
5. Seed Project, SOW – Paint Multi Facilities
a. Working Time Analysis Undated 3
6. Past/Present Performance Questionnaire Undated 4
7. Additional Contractor Information Undated 3
**AMENDMENTS**: Amendments issued to this solicitation, FA4417-16-R-0008, will be part of any resultant
Contract and will be listed above at the time of Award.
END of SECTION J - ATTACHMENTS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .