Solicitation Attachment 5 SOW Painting Multiple Facilities - Bid Schedule
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
STATEMENT OF WORK
FOR PAINTING
MULTIPLE FACILITIES
1.0 WORK INCLUDED: The contractor shall furnish all plant, labor, equipment and materials, and performing all operations in connection with miscellaneous painting at Hurlburt Field, Florida.
2.0 JOB DESCRIPTION: The work to be performed includes but is not limited to the following features.
2.1 Building 90029, Contractor shall paint all interior walls to include offices, common areas and stairwells. Caulk and paint all interior doors/frames. Contractor shall paint all stairwell handrails using DTM specialty coating.
2.2 Building 90033, Contractor shall pressure wash and prep all surfaces, prime and paint all exterior walls, exterior doors, louvers and garage style doors.
2.3 Work shall include, but is not limited to cleaning and painting pipes, valves, fittings, doors and walls of five well houses. Facility numbers are 90308, 90601, 90355, 91136, and 91546.
2.3.1. All walls of facilities shall be cleaned, sealed and painted with enamel paint.
Color to be determined.
2.3.2. All pipes, fittings, and valves shall be prepped to remove all rust, scale, etc;
primed, and painted with two part epoxy. Color to be determined.
2.3.3. All pipes, fittings and valve bolts with exposed threads must be taped prior to painting.
3.0 HOURS OF WORK: Normal hours of work shall be from 7:00 AM to 4:00 PM, Monday through
Friday, except Federal Holidays.
4.0 COORDINATION OF WORK: The contractor shall coordinate all work through the Contracting
Officer or COR. The requester for this work order has been contacted and asked to have shrubs trimmed prior to work commencing.
4.1 Protection of government property: Contractor shall protect government property from any possible over spray or water damage at all times during the accomplishment of the work described for this project.
5.0 SUBMITTALS: Contractor shall adhere to Paint IDIQ specifications and submit data for all materials to be used in the performance of this delivery order. Since this is the seed project for Protective
Coatings IDIQ, submittals shall be submitted prior to work being accomplished. Once submittals have been approved by the COR, contractor may proceed with physical work.
6.0 CLEANUP AND DISPOSAL: All equipment, and tools, shall be secured and stored in a predetermined location so that there is no interference with the movement or operation of military equipment. All debris shall be picked up and removed daily from job site. All paint chips are to be cleaned up prior to start of painting operations.
7.0 REGULATORY REQUIREMENTS:
7.1 U. S. Army Corps of Engineers: EM 385-1-1, Safety and Health Requirements Manual.
7.2 Air Force Safety and Health Standard: AFI 91-301, Air Force Occupational and
Environmental Safety, Fire Protection and Health Program.
7.3 Code of Federal Regulations (see Paint IDIQ Specification, Environmental Section)
7.4 Occupational Safety and Health Administration
D.1 OSHA Booklet 3126, Working with Lead in the Construction Industry
8.0 UTILITIES:
8.1 The government will provide all necessary utilities needed to complete this project.
9.0 WORK PERFORMANCE:
9.1 All surfaces to be painted shall be properly prepped and primed. Contractor shall contact the
Contracting Officer or his/her representative before starting any prep work if there are questions concerning what is to be painted.
10.0 FINAL ACCEPTANCE:
10.1 Contractor shall have all cleanup completed prior to calling for a final inspection.
End of SOW
WORKING TIME ANALYSIS
Protective Coating IDIQ Seed Project, Painting Multiple Facilities
ITEM NO: DESCRIPTION ALLOWABLE CALENDAR DAYS
1. Mobilization 2
2. Make Req'd Submittals 10
3. Secure Material/Equipment 5
4. Perform All Work 60
5. Correct Punch List ltems 5
6. Other 0
TOTAL ALLOWABLE CONTRACT TIME 82