Atch_09 _SEED_Proj _SOW_updated.docx

DOCX document 25 KB Posted

Attached to
Civil Works, IDIQ, Hurlburt Field FL Federal contract opportunity
Solicitation number
FA4417-16-R-0003
Issued by
Department of the Air Force Special Operations Command

About this file

16-R-0003 Attachment 9 Seed Project Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Civil Works, IDIQ, Hurlburt Field FL, newest first.
File Type Posted
FA4417-16-R-0003 _Amendment_5.docx DOCX document
FA4417-16-R-0003 _Amendment_4.docx DOCX document
Bid_Schedule_CW_dated_13_Jul_2016.xlsx XLSX spreadsheet
FA4417-16-R-0003 _Amend_3 _Add_1.pdf PDF
Bid_Schedule_CW_dated_07_Jul_2016.xlsx XLSX spreadsheet
Questions_Answers_1_thru_30_CW_IDIQ_07_Jul_2016.docx DOCX document
FA4417-16-R-0003_Amendment_2.pdf PDF
Site_Visit_MFR_and_Site_Visit_Sign_In_Sheet _16R0003.pdf PDF
FA4417-16-R-0003 _Amendment_1.pdf PDF
Atch_12 _SEED_Project_Site_Utility_Location_Map.pdf PDF
Atch_03 _Schedule_of_Wage_Rates.docx DOCX document
Solicitation_FA4417-16-R-0003 _Civil_Work_IDIQ.docx DOCX document
Atch_05 _Financial_Worksheet _16R0003.docx DOCX document
Atch_11 _SEED_Proj _Design_Drawings.pdf PDF
Atch_06 _Tech_Eval_Sample_Proj _SOW.docx DOCX document
Atch_04 _PPQ _16R0003.docx DOCX document
Atch_02 _Civil_Work_IDIQ_Specifications.pdf PDF
Atch_13 _Additional_Contract_Requirements.docx DOCX document
Atch_10 _Seed_Working_Time_Analysis.docx DOCX document
Atch_08 _Tech_Eval_Sample_Proj _Drawings.pdf PDF
Atch_01 _Bid_Schedule_Civil_IDIQ_2016.xlsx XLSX spreadsheet
Atch_07 _Sample_Tech_Proj_Working_Time_Analysis.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA4417-16-R-0003, Attachment 09, SEED Project

FTEV 16-1018HURLBURT FIELD CIVIL IDIQ11 Mar 2016
Repair Rutting on Independence RoadSTATEMENT OF WORK
PART 1GENERAL

1.01 WORK INCLUDED

1. The contractor shall furnish all labor, materials, tools, supervision and equipment and perform all operations necessary to accomplish all work complete in place, as shown on the contract drawings, specified herein, or as needed to Repair rutting on Independence Road near building 90053. The work shall be fully complete in accordance with the Contract Documents. The project is located on Hurlburt Field, FL.

1.02 RELATED CONTRACT DOCUMENT

1. Civil Works IDIQ Specifications.

2. Site Utility & Location Map.

3. Design Plans.

1.03 WORK DESCRIPTION

1. The work to be performed includes, but is not necessarily limited to, the following principal features:

A. Remove and replace the existing 12’ X 265’ driving lane to include 3” thick asphalt atop a 9” thick compacted GAB atop a 12” thick compacted subgrade as shown on the site plan.

B. All disturbed areas due to construction are to be stabilized with sod.

C. All BMP’s must be in place prior to and during construction.

D. Period of Performance – 45 calendar days E. The project magnitude for this project is between $25,000 and $100,000.

1.04 SUBMITTALS

1. The Specifications are the governing document in determining the required submittal items.

1.05 CONTRACTOR USE OF SITE AND PREMISES

1. The construction site shall be kept neat and orderly at all times. The contractor shall remove debris from the site on a daily basis.

1.06 DISPOSAL

1. All demolition materials and debris shall be loaded onto trucks immediately for removal from site as required. It shall be the responsibility of the contractor to provide the trucks and for the selection of the dumpsite. Provide Contracting Officer with name of approved dumpsite, if requested.

1.07 STORAGE AREA

1. Storage area or areas will be coordinated at the Pre-Construction conference.

2. The Contractor is solely responsible for the security of materials located within the storage area.

1.08 SAFETY

1. The pertinent sections of the following publications are applicable to all work on this project.

A. U.S. Army Corps of Engineers: EM 38511, Safety and Health Requirements Manual.

B. Air Force Instruction (AFI) 91-301.

2. The Contractor shall safety barricade as necessary all excavations and hazards.

1.09 HAUL ROUTE

1. The Contractor shall utilize the most direct route to the delivery point.

1.010 PERMITS

1. AF Form 103, Civil Engineering Work Clearance Request

2. ERP 62-330, Environmental Resource Permit if project does not meet exemption criteria.

3. NPDES 62-621 General Permit for Construction Activity requiring a Storm Water Pollution Prevention Plan if project disturbs 1 acre or more of land.

4. Dewatering 62-621, Permit for Discharge of Groundwater, if dewatering is necessary.

1.011 PHASING AND TRAFFIC CONTROL

1. The Contractor shall work continuously and sequentially on this project.

2. The Contractor will submit a proposed project schedule for approval within 5 calendar days of the Notice to Proceed.

PART 2 PRODUCTS

2.01 ACCEPTABLE MATERIALS

1. Contractor shall refer to the IDIQ specifications for guidance in selecting appropriate materials to accomplish the work.

2.02 ALTERNATIVE MATERIALS

1. If Contractor suggests the use of a specific material not listed in the specifications, which the Government might consider to lessen the cost or increase the utility or appearance of the facility, the contractor may submit that material listed as a substitution for the Government to evaluate.

PART 3 EXECUTION

3.01 INSPECTION

1. The contractor shall make a representative available to the Government on site to answer questions, which may arise.

2. The Government representatives will be allowed free access to the site in its entirety.

3.02 HOURS OF WORK

1. The normal hours of a workday shall be between 8:00 A.M. and 4:00 P.M., Monday through Friday, except holidays. The contractor may elect, at his option, to work hours other than normal duty hours if approved by the Contracting Officer. All work time, other than normal working days, shall be requested in writing, 3 days in advance.

3.03 PHOTOGRAPHS

1. Photographs are not required to be submitted but are highly recommended.

3.04 QUALITY CONTROL

1. The contractor shall establish and maintain quality control to assure compliance with Contract Documents, and provide records of his quality control for materials, equipment and construction operations.

2. The Contractor is solely responsible for quality control on this project. A quality control representative will be appointed by the Contractor and will be on-site daily to assure the work accomplished meets the specifications.

3.05 AS-BUILT DRAWINGS

Not required.

END OF DELIVERY ORDER