Attachment_3_-_Wage_Determination.pdf
PDF 136 KB Posted
- Attached to
- Annual Maintenance Elevated Water Tower Federal contract opportunity
- Solicitation number
- FA4417-13-R-0004
About this file
Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_1_13-R-0004_Elevated_water_towers.pdf | ||
| Q__A_2013_Annual_Maintenance_Elevated_Water_Towers_Questions.pdf | ||
| SITE_VISIT_BRIEF.pdf | ||
| Sign-In_FA4417-13-R-0004.pdf | ||
| Attachment_5_-_Financial_Reference_Sheet.pdf | ||
| FA4417-13-R-0004.pdf | ||
| Appendix_-_Final_Report.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_2_-_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4417-13-R-0004
ATTACHMENT 3
General Decision Number: FL130029 03/29/2013 FL29
Superseded General Decision Number: FL20120029
State: Florida
Construction Type: Building
County: Okaloosa County in Florida.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/04/2013
1 03/29/2013
* ENGI0653-009 10/01/2012
Rates Fringes
OPERATOR: Concrete Pump, Truck Mounted....................$ 25.30 11.13
OPERATOR: Mechanic..............$ 25.30 11.13
OPERATOR: Oiler.................$ 23.85 11.13
OPERATOR: Boom Truck.............$ 25.30 11.13
IRON0798-006 10/01/2008
IRONWORKER, ORNAMENTAL AND
REINFORCING......................$ 22.03 11.75
* PAIN0164-002 09/01/2011
PAINTER: Spray..................$ 17.50 7.93
PLUM0366-004 08/01/2012
PIPEFITTER (HVAC Pipe
Installation)....................$ 22.36 9.26
SUFL2009-025 05/22/2009
BRICKLAYER.......................$ 17.08 0.00
CARPENTER, Includes
Acoustical Ceiling
Installation, Drywall
Hanging, and Form Work...........$ 12.96 0.00
CEMENT MASON/CONCRETE FINISHER...$ 12.90 0.00
ELECTRICIANS, Including Low
Voltage Wiring for Phones and
Alarms...........................$ 13.91 0.00
IRONWORKER, STRUCTURAL...........$ 14.10 0.00
LABORER: Asphalt Shoveler.......$ 7.88 0.00
LABORER: Common or General......$ 8.50 0.00
LABORER: Concrete Saw (Hand
Held/Walk Behind)................$ 12.63 0.00
LABORER: Mason Tender - Brick...$ 10.75 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 12.83 1.90
LABORER: Pipelayer..............$ 10.00 0.00
LABORER: Roof Tearoff...........$ 9.00 0.00
LABORER: Landscape and
Irrigation.......................$ 9.45 0.00
MECHANICAL INSULATOR,
Including Duct and Pipe
Insulation.......................$ 13.10 0.00
OPERATOR: Asphalt Spreader......$ 11.41 0.00
OPERATOR: Backhoe/Excavator.....$ 11.00 0.00
OPERATOR: Bulldozer.............$ 15.01 0.00
OPERATOR: Crane.................$ 19.00 0.73
OPERATOR: Distributor...........$ 12.37 0.00
OPERATOR: Forklift..............$ 14.00 0.00
OPERATOR: Grader/Blade..........$ 13.73 0.00
OPERATOR: Loader................$ 13.80 1.79
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 11.69 0.00
OPERATOR: Roller................$ 10.68 0.00
OPERATOR: Screed................$ 11.34 0.00
OPERATOR: Tractor...............$ 9.91 0.00
OPERATOR: Trencher..............$ 11.75 0.00
PAINTER: Brush and Roller.......$ 12.21 0.00
PIPEFITTER, Excludes HVAC
Pipe Installation................$ 13.86 0.00
PLUMBER..........................$ 15.51 0.00
ROOFER (Installation of Metal
Roofs Only)......................$ 14.26 0.59
ROOFER, Includes Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply, Slate, & Tile Roofs (Excludes
Installation of Metal Roofs).....$ 13.80 0.00
SHEET METAL WORKER, Includes
HVAC Duct Installation...........$ 12.68 0.00
Sprinkler Fitters................$ 12.38 0.74
TILE SETTER......................$ 18.00 0.00
TRUCK DRIVER: Dump Truck........$ 10.00 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.09 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .