Amend_1_13-R-0004_Elevated_water_towers.pdf
PDF 119 KB Posted
- Attached to
- Annual Maintenance Elevated Water Tower Federal contract opportunity
- Solicitation number
- FA4417-13-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q__A_2013_Annual_Maintenance_Elevated_Water_Towers_Questions.pdf | ||
| SITE_VISIT_BRIEF.pdf | ||
| Sign-In_FA4417-13-R-0004.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_5_-_Financial_Reference_Sheet.pdf | ||
| FA4417-13-R-0004.pdf | ||
| Appendix_-_Final_Report.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_2_-_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FTEV 11-1143B
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Change Period of Performance in SF 1442 Block 11 and Clause 52-211-10 FROM 107 calendar days TO 125 calendar days
2. Delete HF037 Wide Area Work Flow Statement
3. Add DFARS 252.232-7006 (Dev) Wide Area Work Flow Payment Instructions
4. The closing date for proposals and all other information remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4417-13-R-0004
X 9B. DATED (SEE ITEM 11)
13-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2013
CODE
1 SOCONS
350 TULLY ST.
HURLBURT FIELD FL 32544
FA4417 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4417-13-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The contractor period of performance end date has increased by 18 days from 107 days to 125 days.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
107 calendar days after issuance of Notice to
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
FOB: Destination
F2F323
To:
125 calendar days after
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
The following Delivery Schedule item for CLIN 0002 has been changed from:
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
The following Delivery Schedule item for CLIN 0003 has been changed from:
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
The following Delivery Schedule item for CLIN 0004 has been changed from:
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
Proceed
1 1SOCES
MARY MIKOS
1 SOCES/CEOS
415 INDEPENDENCE RD
HURLBURT FIELD FL 32544-5816
850-884-7972
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 125 calendar days.
(End of clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been deleted:
HF037 WIDE AREA WORK FLOW STATEMENT JUL 2007
SECTION I - CONTRACT CLAUSES
The following have been added by full text:
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2013) (DEVIATION)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, File Transfer Protocol, or PayWeb.
(1) To access PayWeb, the vendor may go to the following site: https://onronline.onr.navy.mil/payweb/
(2) For instructions on PayWeb payment request submission, please contact the office identified below:
Atlanta Regional Office
Office of Naval Research (ONR)
100 Alabama St, Ste 4R15, Atlanta GA 30303-3104
Main Office (404)562-1600 Email:ONR_Atlanta@onr.navy.mil
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
CONSTRUCTION INVOICE (NOTE: Invoices to be submitted only AFTER receipt of approved AF Form 3065, Contract Progress Report)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
Not Applicable
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F67100
Issue By DoDAAC FA4417
Admin DoDAAC FA4417 http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/ https://onronline.onr.navy.mil/payweb/ mailto:ONR_Atlanta@onr.navy.mil
Inspect By DoDAAC N/A
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) F2F332
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
Contracting Officer: Tina Kneip; Tina.Kneip@hurlburt.af.mil
Contract Administrator: Jordan Roby; Jordan.Roby@hurlburt.af.mil
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
https://wawf.eb.mil/
(3) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
(End of Summary of Changes) mailto:Tina.Kneip@hurlburt.af.mil mailto:Jordan.Roby@hurlburt.af.mil https://wawf.eb.mil/
File details come from the government source that posted it. Updated .