Amendment 3 to add Addendum 2 FA4417-11-R-0037 pedestrian bridge

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTEV 10-1056

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to incorporate Addendum #2 into the solicitation, FA4417-11-R-0037.

A. The addendum is to change the previous performance time FROM 30 days TO:

CLIN 0001 Rpr/Repaint Ped Bridge IN-PLACE shall not exceed 180 days.

CLIN 0002 Rpr/Repaint Ped Bridge ON-GROUND shall not exceed 90 days.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4417-11-R-0037

X 9B. DATED (SEE ITEM 11)

21-Jul-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2011

CODE

1 SOCONS

350 TULLY ST

HURLBURT FIELD FL 32544-5810

FA4417 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4417-11-R-0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The contractor period of performance end date has increased by 60 days from 30 days to 90 days.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from The contractor shall furnish all labor, materials, tools, supervision, equipment, and perform all operations necessary to Repair/Repaint the Pedestrian Bridge on Hurlburt

Field (crossing Hwy 98) IN-PLACE, in accordance with the attached specifications dated 16 June 2011, and drawings dated 17 June 2011. to The contractor shall furnish all labor, materials, tools, supervision, equipment, and perform all operations necessary to Repair/Repaint the Pedestrian Bridge on Hurlburt Field (crossing Hwy 98) IN-

PLACE, in accordance with the attached specifications dated 16 June 2011, and drawings dated 17 June 2011. The performance time for CLIN 0001 shall not exceed 180 days..

CLIN 0002

The CLIN extended description has changed from The contractor shall furnish all labor, materials, tools, supervision, equipment, and perform all operations necessary to Repair/Repaint the Pedestrian Bridge on Hurlburt

Field (crossing Hwy 98) ON-GROUND, in accordance with the attached specifications dated 16 June 2011, and drawings dated 28 July 2011. to The contractor shall furnish all labor, materials, tools, supervision, equipment, and perform all operations necessary to Repair/Repaint the Pedestrian Bridge on Hurlburt Field (crossing Hwy 98) ON-

GROUND, in accordance with the attached specifications dated 16 June 2011, and drawings dated 28 July 2011.The performance time for CLIN 0002 shall not exceed 90 days..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

ADDENDUM #2

SOLICITATION NO. FA4417-11-R-0037

PRODUCT NO: FTEV 10-1056

REPAIR/REPAINT PEDESTRIAN BRIDGE, HWY 98

ADDENDUM #2 11 AUGUST 2011

A. MISCELLANEOUS

1. The performance time for CLIN 0001 shall not exceed 180 days.

2. The performance time for CLIN 0002 shall not exceed 90 days.

END OF ADDENDUM #2

(End of Summary of Changes)