Atch 1. FY26 Protective Coating Pricing.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
FY26 Protective Coating BPA
Solicitation number
FA440723Q0001
Issued by

About this file

This is a blank Protective Coating pricing sheet template for a FY26 Blanket Purchase Agreement (BPA) at Scott Air Force Base, Illinois. The template establishes unit pricing structure across five contract periods: August 2026 – September 2027, October 2027 – September 2028, October 2028 – September 2029, October 2029 – September 2030, and October 2027 – July 2031. The pricing sheet covers over 60 line items encompassing equipment rental (aerial lifts, boom work platforms), surface preparation (lead-based paint removal, wallpaper removal, pressure washing, sanding), exterior coatings (steel siding, doors, windows, masonry, trim), interior coatings (drywall, concrete floors, pipes, wood trim, balustrades), pavement markings (acrylic waterborne, glass beads, arrows, handicap symbols), labor rates, and ancillary services (mobilization/demobilization, construction management, cleaning, material handling, performance bonds, permits).

The pricing template includes subtotal rows for each contract period and applies a 20-percent contingency factor to generate grand totals. All line items are currently blank, indicating this is a solicitation document requiring offerors to populate pricing for labor hours, material costs, and equipment rental rates for each specified task. The BPA is a Total Small Business set-aside for multiple award, with pricing representing best value determination per federal acquisition regulations. Offerors must address all protective coating services—painting, coatings application, and pavement marking—for existing infrastructure at Scott AFB in compliance with OSHA standards and hazardous waste disposal regulations.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BPA Pricing Sheet Protective Coating Pricing Sheet FY26

DESCRIPTIONUNITAug 2026 - Sep 2027Oct 2027 - Sep 2028Oct 2028 - Sep 2029Oct 2029 - Sep 2030Oct 2027 - July 2031
QTYUNIT PRICEAMOUNTQTYUNIT PRICEAMOUNTQTYUNIT PRICEAMOUNTQTYUNIT PRICEAMOUNTQTYUNIT PRICEAMOUNT
Daily aerial lift truck, 2 person, to 80'Each$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly aerial lift truck, 2 person, to 80'Each$ - 0$ - 0$ - 0$ - 0$ - 0
Daily boom work platform, 40' snorkelEach$ - 0$ - 0$ - 0$ - 0$ - 0
Weekly boom work platform, 40' snorkelEach$ - 0$ - 0$ - 0$ - 0$ - 0
Mobilization / DemobilizatonEach$ - 0$ - 0$ - 0$ - 0$ - 0
Tarpaulins, white, clear or blackSF$ - 0$ - 0$ - 0$ - 0$ - 0
Removal of lead-based paint, by chemicals, per application, baseboard, to 12" wideLF$ - 0$ - 0$ - 0$ - 0$ - 0
Removal of lead-based paint, by chemicals, per application, handrailsLF$ - 0$ - 0$ - 0$ - 0$ - 0
Preparation of mold containment area, cover surfaces with polyethylene sheetingSF$ - 0$ - 0$ - 0$ - 0$ - 0
Demolition millwork and trim, trim, baseboard, to 6" wideLF$ - 0$ - 0$ - 0$ - 0$ - 0
Demolition millwork and trim, trim, baseboard, to 6" wide, remove and reset, maximumLF$ - 0$ - 0$ - 0$ - 0$ - 0
Selective demolition millwork and trim, minimum labor/equipment chargeJOB$ - 0$ - 0$ - 0$ - 0$ - 0
Selective demolition, walls and partitions, drywall, nailed or screwed, one layerSF$ - 0$ - 0$ - 0$ - 0$ - 0
Gypsum wallboard repairs, minimum chargeJob$ - 0$ - 0$ - 0$ - 0$ - 0
Wallpaper removal, one layerSF$ - 0$ - 0$ - 0$ - 0$ - 0
Wallpaper, minimum labor/equipment chargeJob$ - 0$ - 0$ - 0$ - 0$ - 0
Sanding, surface protection, , basic drop clothsSF$ - 0$ - 0$ - 0$ - 0$ - 0
Siding, pressure wash, based on 2500 lbsSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls, scrape and sand gypsumSF$ - 0$ - 0$ - 0$ - 0$ - 0
Railing, wrought iron, 1" rail, 1/2" square verticals, brushworkLF$ - 0$ - 0$ - 0$ - 0$ - 0
Stair stringers, exterior, metal, roll and brush,LF$ - 0$ - 0$ - 0$ - 0$ - 0
Siding exterior, alkyd, oil base, steel siding, paint one coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Siding exterior, for work over 12' high, from extension ladder, addSF$ - 0$ - 0$ - 0$ - 0$ - 0
Siding exterior, alkyd, oil base, steel siding, paint two coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Siding exterior, minimum labor/equipment chargeJob$ - 0$ - 0$ - 0$ - 0$ - 0
Siding, misc., latex paint, aluminum siding, brushwork, primer and two coats, exterior latexSF$ - 0$ - 0$ - 0$ - 0$ - 0
Doors and windows, exterior, door frames and trim, 2 coatsLF$ - 0$ - 0$ - 0$ - 0$ - 0
Doors, exterior, both sides including frame& trim, 2 coatEach$ - 0$ - 0$ - 0$ - 0$ - 0
Trim, exterior, molding, exterior, up to 14" wide, primer and two coatLF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls, masonry (CMU), exterior, concrete masonry units, porous, brushwork, latex, waterproof sealer, first coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls, masonry (CMU), exterior, concrete masonry units, porous, brushwork, latex, waterproof sealer, second coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Doors, interior latex, zero VOC primer + 2 coatEach$ - 0$ - 0$ - 0$ - 0$ - 0
Walls , interior, drywall latex, primer, paint two coatsSF$ - 0$ - 0$ - 0$ - 0$ - 0
For work over 15' high, addSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls/ceilings, interior, for light textured surfaces, addSF$ - 0$ - 0$ - 0$ - 0$ - 0
Floors, interior, concrete paint, latex, brushwork, 1st coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Floors, interior, concrete paint, latex, brushwork, 2nd coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Anti-slip floor treatments, granular additive for paint or sealerSF$ - 0$ - 0$ - 0$ - 0$ - 0
Interior, floors, concrete or wood, oil base, stain, wood floorSF$ - 0$ - 0$ - 0$ - 0$ - 0
Interior, floors, concrete or wood, oil base, varnishSF$ - 0$ - 0$ - 0$ - 0$ - 0
Interior, pipe, oil base, 5" to 8" diameter, two coats, brushworkLF$ - 0$ - 0$ - 0$ - 0$ - 0
Trim, wood, oil base, including puttying, under 6" wide, paint two coatsLF$ - 0$ - 0$ - 0$ - 0$ - 0
Interior, cornice, oil base, simple design, brushwork, paint two coatsSF$ - 0$ - 0$ - 0$ - 0$ - 0
Interior, balustrades, oil base, brushwork, paint one coatSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, smooth finish, brushworkSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls and ceilings, interior, for ceiling installations, addSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, sand finishSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls and ceilings, interior, masonry or concrete block, latex paint, primer or sealer coat, primer, smooth finishSF$ - 0$ - 0$ - 0$ - 0$ - 0
Walls and ceilings, interior, masonry or concrete block, latex paint, paint two coats, smooth finishSF$ - 0$ - 0$ - 0$ - 0$ - 0
Exterior steel coatings, cold galvanizing, brush in fieldSF$ - 0$ - 0$ - 0$ - 0$ - 0
Selective demolition, specialties, letter, signs or plaquesEach$ - 0$ - 0$ - 0$ - 0$ - 0
Painted pavement markings, acrylic waterborne, white or yellow, 6" wide, less than 3000 L.F.LF$ - 0$ - 0$ - 0$ - 0$ - 0
Painted pavement markings, glass beads, add (7lbs per 1 gal)LB$ - 0$ - 0$ - 0$ - 0$ - 0
Painted pavement markings, acrylic waterborne, white or yellow, 12" wide, less than 3000 L.F.LF$ - 0$ - 0$ - 0$ - 0$ - 0
Painted pavement markings, acrylic waterborne, arrows or gore linesSF$ - 0$ - 0$ - 0$ - 0$ - 0
Pavement parking markings, layout of pavement markingLF$ - 0$ - 0$ - 0$ - 0$ - 0
Pavement parking markings, handicap symbolEach$ - 0$ - 0$ - 0$ - 0$ - 0
Painter Labor Rate (Layout/clean-up)Hr$ - 0$ - 0$ - 0$ - 0$ - 0
SUB-TOTAL$ - 0SUB-TOTAL$ - 0SUB-TOTAL$ - 0SUB-TOTAL$ - 0SUB-TOTAL$ - 0
Construction management fees, for work to $100,000Job$ - 0$ - 0$ - 0$ - 0$ - 0
Cleaning up, after job completionJob$ - 0$ - 0$ - 0$ - 0$ - 0
Cleaning up, continuous, per day, during constructionMSF$ - 0$ - 0$ - 0$ - 0$ - 0
Cut and patch to match existing constructionPrj$ - 0$ - 0$ - 0$ - 0$ - 0
Material HandlingPrj$ - 0$ - 0$ - 0$ - 0$ - 0
Protection of existing workPrj$ - 0$ - 0$ - 0$ - 0$ - 0
Performance bondPrj$ - 0$ - 0$ - 0$ - 0$ - 0
PermitsPermits$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL (W/O Contingency)$ - 0TOTAL (W/O Contingency)$ - 0TOTAL (W/O Contingency)$ - 0TOTAL (W/O Contingency)$ - 0TOTAL (W/O Contingency)$ - 0
Contingencies, add to estimate, conceptual stage(20%)Prj$ - 0$ - 0$ - 0$ - 0$ - 0
GRAND TOTAL$ - 0GRAND TOTAL$ - 0GRAND TOTAL$ - 0GRAND TOTAL$ - 0GRAND TOTAL$ - 0

File details come from the government source that posted it. Updated .