Atch 1. FY26 Protective Coating Pricing.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- FY26 Protective Coating BPA
- Solicitation number
- FA440723Q0001
About this file
This is a blank Protective Coating pricing sheet template for a FY26 Blanket Purchase Agreement (BPA) at Scott Air Force Base, Illinois. The template establishes unit pricing structure across five contract periods: August 2026 – September 2027, October 2027 – September 2028, October 2028 – September 2029, October 2029 – September 2030, and October 2027 – July 2031. The pricing sheet covers over 60 line items encompassing equipment rental (aerial lifts, boom work platforms), surface preparation (lead-based paint removal, wallpaper removal, pressure washing, sanding), exterior coatings (steel siding, doors, windows, masonry, trim), interior coatings (drywall, concrete floors, pipes, wood trim, balustrades), pavement markings (acrylic waterborne, glass beads, arrows, handicap symbols), labor rates, and ancillary services (mobilization/demobilization, construction management, cleaning, material handling, performance bonds, permits).
The pricing template includes subtotal rows for each contract period and applies a 20-percent contingency factor to generate grand totals. All line items are currently blank, indicating this is a solicitation document requiring offerors to populate pricing for labor hours, material costs, and equipment rental rates for each specified task. The BPA is a Total Small Business set-aside for multiple award, with pricing representing best value determination per federal acquisition regulations. Offerors must address all protective coating services—painting, coatings application, and pavement marking—for existing infrastructure at Scott AFB in compliance with OSHA standards and hazardous waste disposal regulations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BPA Pricing Sheet Protective Coating Pricing Sheet FY26
| DESCRIPTION | UNIT | Aug 2026 - Sep 2027 | Oct 2027 - Sep 2028 | Oct 2028 - Sep 2029 | Oct 2029 - Sep 2030 | Oct 2027 - July 2031 | ||||||||||
| QTY | UNIT PRICE | AMOUNT | QTY | UNIT PRICE | AMOUNT | QTY | UNIT PRICE | AMOUNT | QTY | UNIT PRICE | AMOUNT | QTY | UNIT PRICE | AMOUNT | ||
| Daily aerial lift truck, 2 person, to 80' | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Weekly aerial lift truck, 2 person, to 80' | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Daily boom work platform, 40' snorkel | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Weekly boom work platform, 40' snorkel | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Mobilization / Demobilizaton | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Tarpaulins, white, clear or black | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Removal of lead-based paint, by chemicals, per application, baseboard, to 12" wide | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Removal of lead-based paint, by chemicals, per application, handrails | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Preparation of mold containment area, cover surfaces with polyethylene sheeting | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Demolition millwork and trim, trim, baseboard, to 6" wide | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Demolition millwork and trim, trim, baseboard, to 6" wide, remove and reset, maximum | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Selective demolition millwork and trim, minimum labor/equipment charge | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Selective demolition, walls and partitions, drywall, nailed or screwed, one layer | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Gypsum wallboard repairs, minimum charge | Job | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Wallpaper removal, one layer | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Wallpaper, minimum labor/equipment charge | Job | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Sanding, surface protection, , basic drop cloths | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding, pressure wash, based on 2500 lbs | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls, scrape and sand gypsum | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Railing, wrought iron, 1" rail, 1/2" square verticals, brushwork | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Stair stringers, exterior, metal, roll and brush, | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding exterior, alkyd, oil base, steel siding, paint one coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding exterior, for work over 12' high, from extension ladder, add | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding exterior, alkyd, oil base, steel siding, paint two coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding exterior, minimum labor/equipment charge | Job | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Siding, misc., latex paint, aluminum siding, brushwork, primer and two coats, exterior latex | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Doors and windows, exterior, door frames and trim, 2 coats | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Doors, exterior, both sides including frame& trim, 2 coat | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Trim, exterior, molding, exterior, up to 14" wide, primer and two coat | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls, masonry (CMU), exterior, concrete masonry units, porous, brushwork, latex, waterproof sealer, first coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls, masonry (CMU), exterior, concrete masonry units, porous, brushwork, latex, waterproof sealer, second coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Doors, interior latex, zero VOC primer + 2 coat | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls , interior, drywall latex, primer, paint two coats | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| For work over 15' high, add | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls/ceilings, interior, for light textured surfaces, add | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Floors, interior, concrete paint, latex, brushwork, 1st coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Floors, interior, concrete paint, latex, brushwork, 2nd coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Anti-slip floor treatments, granular additive for paint or sealer | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Interior, floors, concrete or wood, oil base, stain, wood floor | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Interior, floors, concrete or wood, oil base, varnish | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Interior, pipe, oil base, 5" to 8" diameter, two coats, brushwork | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Trim, wood, oil base, including puttying, under 6" wide, paint two coats | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Interior, cornice, oil base, simple design, brushwork, paint two coats | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Interior, balustrades, oil base, brushwork, paint one coat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, smooth finish, brushwork | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls and ceilings, interior, for ceiling installations, add | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, sand finish | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls and ceilings, interior, masonry or concrete block, latex paint, primer or sealer coat, primer, smooth finish | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Walls and ceilings, interior, masonry or concrete block, latex paint, paint two coats, smooth finish | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Exterior steel coatings, cold galvanizing, brush in field | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Selective demolition, specialties, letter, signs or plaques | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Painted pavement markings, acrylic waterborne, white or yellow, 6" wide, less than 3000 L.F. | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Painted pavement markings, glass beads, add (7lbs per 1 gal) | LB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Painted pavement markings, acrylic waterborne, white or yellow, 12" wide, less than 3000 L.F. | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Painted pavement markings, acrylic waterborne, arrows or gore lines | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Pavement parking markings, layout of pavement marking | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Pavement parking markings, handicap symbol | Each | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Painter Labor Rate (Layout/clean-up) | Hr | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| SUB-TOTAL | $ - 0 | SUB-TOTAL | $ - 0 | SUB-TOTAL | $ - 0 | SUB-TOTAL | $ - 0 | SUB-TOTAL | $ - 0 | |||||||
| Construction management fees, for work to $100,000 | Job | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Cleaning up, after job completion | Job | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Cleaning up, continuous, per day, during construction | MSF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Cut and patch to match existing construction | Prj | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Material Handling | Prj | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Protection of existing work | Prj | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Performance bond | Prj | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Permits | Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| TOTAL (W/O Contingency) | $ - 0 | TOTAL (W/O Contingency) | $ - 0 | TOTAL (W/O Contingency) | $ - 0 | TOTAL (W/O Contingency) | $ - 0 | TOTAL (W/O Contingency) | $ - 0 | |||||||
| Contingencies, add to estimate, conceptual stage(20%) | Prj | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| GRAND TOTAL | $ - 0 | GRAND TOTAL | $ - 0 | GRAND TOTAL | $ - 0 | GRAND TOTAL | $ - 0 | GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .