This document is a Construction Cost Estimate Breakdown for a traffic signal repair project at Maxwell Air Force Base in Alabama. The project, identified by Purchase Request Number PNQS 25-1844, involves multiple electrical and traffic signal improvement tasks across three divisions: General Requirements, Site Work, and Electrical/Fire System/Communications. Specific work items include administrative tasks, outages and permits, removal of existing signals, traffic controller unit installation, LED traffic signal light installations (3-section and 5-section), pedestrian LED traffic light signals, pedestrian push buttons, LED luminaires, 8-phase controller installation, and intersection detector installation. The cost estimate template includes line items for material costs, labor costs, taxes, insurance, overhead, profit, and bonding, with standard percentage allocations for various cost categories (10% overhead, 10% profit, 2.5% bonds).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT MATERIAL/EQUIP. COSTS LABOR RATES OTHER
LINE ITEM OF QUANTITY d Manhours AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL RATE TOTAL COSTS TOTAL
Division 1 (General Requirements) 1 Administrative EA 2 Outages and Permits EA
Division 2 (Site Work) 3 Removal Of Exisiting Signals EA
Division 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) 4 Traffic Controller Unit Installation EA 5 3-Section Yellow LED Traffic Signal Light EA 6 5-Section Yellow LED Traffic Signal Light EA 7 Pedestrian LED Traffic Light Signal EA 8 Pedestrian Push Buttons EA 9 LED Luminares Traffic Light Signal EA 10 8-Phase Controller EA 11 Install Intersection Detectors EA
12 TOTAL
13 Material Costs 14 Tax on Materials 10%
15 TOTAL MATERIAL COST
16 Labor Cost 17 Insurance & Tax on Labor 10%
18 TOTAL LABOR COST
19 Total Other Direct Costs 20 Total Material, Labor, Tax & Insurance
21 TOTAL DIRECT COSTS
22 Overhead 10% 23 Subtotal 24 Profit 10% 25 Bonds 2.5%
26 TOTAL
Signature: ______________________________________
PNQS 25-1844 FAC# 2036 MAXWELL AFB
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR TRAFFIC SIGNALS, MAXWELL
PURCHASE REQUEST NUMBER PROJECT NUMBER/WORK ORDER WORK LOCATION
CONSTRUCTION COST ESTIMATE BREAKDOWN
OMB No. 0704-0193
CONTRACTOR DATE
ADDRESS
400 Cannon Street Maxwell Air Force Base Alabama
File details come from the government source that posted it. Updated .